2, decoration must be carried out according to the renderings of the construction, construction procedures are divided into first in and then out, the division between rooms should be reasonable, each room should have a clear purpose and use, eliminated.
Fire, ventilation, air conditioning, audio, lighting, television and other units should cooperate with the decoration and cross construction. Found the problem, held a coordination meeting in time, change the construction plan.
For example, the location of heating vents and vents should not
Obstruct the sound effect and the position directly facing the guests. The suspension of the sound box should not interfere with the opening of the room door, nor should it be a place where guests can easily touch their heads.
3. After all pipelines are buried, a comprehensive test shall be conducted. After passing the inspection, the finished product shall be protected and then decorated. Otherwise, there will be problems in the line after renovation, which will destroy the original renovation and will inevitably lead to a waste of time and an increase in investment.