1, geographical location
The location of the health club is the first consideration. Driving for an hour to exercise is a great time consumption for everyone.
Generally speaking, customers can find a suitable fitness club near their workplace, so that they can exercise before going to work, during lunch break or after work.
2. Launch position area
Small clubs with an area of less than 800 square meters, medium-sized fitness clubs with an area of 800-3,000 square meters, and large-scale fitness clubs with an area of more than 3,000 square meters, the larger the venue, the stronger the operability, the more complete the internal project facilities, the greater the attraction to customers, and the more able to meet their needs.
3. Site height
In principle, the venue of the gym is not less than 3m, and special venues such as squash have higher requirements for the venue, so it is necessary to set up the internal project facilities of the club according to the height of the venue.
4. Site ground
The ground in the equipment area is mainly floor glue, and the free power equipment has special requirements for the thickness of floor glue. The dance classroom, private education studio, physical fitness test room and office are mainly wooden floors, the spinning classroom is mainly carpets, and the hall is mainly floor tiles.
5. Parking spaces
There must be enough parking spaces near the club to meet the needs of customers.
6. Rent
The rent should be controlled below 28 yuan/m2/month. The lower the rent, the better. Of course, there are three modes of cooperation. )
7, start-up funds
Below 800 square meters, 6,543.8+0,000 to 6,543.8+0.5 million, 800 square meters to 3,000 square meters, 6,543.8+0.5 million to 3.5 million. According to the actual investment cost.
Investment in opening a gym:
The investment cost of a gym per 100 square meter is about 65,438+10,000. Investors can estimate their own investment cost of a gym according to this investment cost ratio.
But when estimating the investment cost, remember not to estimate the site cost, because the site cost is different in different regions. Here, there is no way to accurately point out the site cost of each region. After all, the cost will change with time.