1. How much is the epoxy floor paint per square meter?
According to different use requirements and different construction techniques, the price will be different ... 25- 100 or above ... 35-50 is enough for most factories and workshops. The price per square meter of epoxy floor paint in the market is 12 yuan ~ most of them are in 35 yuan.
Second, the epoxy floor paint construction technology
First, the dull treatment
(1) The base floor shall be based on the smooth surface of cement powder or grindstone;
(2) The plain land shall be maintained for more than 28 days, and the water content shall be below 8% before construction. If it is uneven or empty, it needs to be removed;
(3) leveling the ground with epoxy mortar;
(4) The oil pollution in the plain should be thoroughly cleaned up;
⑤ Before construction, keep the construction site dry and clean;
B. Primer coating
(1) Keep it clean before construction. If there is any debris attached, it should be removed. The main agent and hardener should be mixed in the correct proportion and fully stirred.
② Adjust the proper viscosity according to the ground conditions, and the construction should be completed within 4 hours.
③ The curing and hardening time of the primer is about 8 hours or more.
C, medium coating
(1) The epoxy floor needs to be kept clean before construction. If there is debris attached to it, it needs to be removed. The main agent and hardener should be mixed in the correct proportion and fully stirred.
(2) adding a proper amount of quartz sand into the mixed resin;
(3) evenly daub the material with a trowel;
(4) Mixing materials should be completed within 30 minutes;
(5) Handle the handover at the construction junction;
⑥ The curing and hardening time of the intermediate coating is about 8 hours or longer.
D, batch of soil layers
(1) Mix the main agent and the curing agent according to the correct ratio and fully stir;
(2) evenly coating materials with a batching knife;
(3) The mixing needs to be completed within 30 minutes;
④ The curing and hardening time of the batch of soil is about 8 hours or more;
⑤ According to the actual needs, the construction times should be smooth, without holes, batch knife marks and sanding marks.
E, surface coating
(1) Before construction, it should be kept clean, and if there are any sundries adhering, it should be removed;
(2) the main agent is stirred evenly before use;
(3) mixing the main agent and the curing agent in a correct proportion and fully stirring;
(4) evenly coating and mixing the materials with a roller or a trowel, and completing the construction in 30 minutes;
(5) Construction joints need to be handled well;
⑥ After the construction is completed, it can be entered only after 24 hours, and pressurized only after 72 hours (subject to 250C, and the opening hours will be appropriately extended at low temperature).
After reading our explanation on the construction technology of epoxy floor paint and how much it costs per square meter, what do you think of this paint?