Town construction in Dongtang town
In 2006, the town invested 42,000 yuan and hired Shenyang Xinjian Urban Planning and Design Co., Ltd. to compile the overall urban planning and urban construction planning of Dongtang Town from 2007 to 2020. In 2007, with an investment of 1 more than ten thousand yuan, the hardening, beautification and lighting project of a commercial street in this town was completed. The main road in the town 1. 1 km is resurfaced with asphalt, colored pedestrian bricks and kerbs are laid on both sides, street drainage, bath sewage, hot and cold water pipe networks are reconstructed, and 36 street lamps are installed. In 2007, the town realized the development of 22,000 square meters of hot spring apartments, and the sales were very hot, which also opened the prelude to the development of hot spring apartments in Dongtang Town. In 2008, the total construction area of the town reached110.8 million square meters, with a total investment of10.56 billion yuan. Five projects including Hongjing Hot Spring Apartment Phase III, Bishui Mountain Villa, Baoda Health County, Quiet Hot Spring Apartment and Kangyuan have been completed and moved in. Around the renovation project of Anjia River and Tanghou River in the town, an artificial lake is built, and the dam of the riverside landscape road is close to 1km. The project has completed the preliminary work such as river dredging, dam construction and dam reinforcement. Supporting projects for the construction of small towns such as garbage dumps, waterworks and comprehensive farmers' markets are also in full swing.