How long does it take to decorate a house of 100 square meter?
Hello, the construction time of a specific type of work is calculated according to the engineering quantity and the complexity of the construction project, and no specific time standard can be stipulated. Take 100 square meter as an example. Generally, it takes 3-4 days for hydropower, 7- 12 days for bricklayer, 5-7 days for ground leveling and maintenance, 3-5 days for carpenter and 0/0-65438+for oilman.

In order to save the decoration time to the maximum extent, before signing the contract, we must choose the brand and category of the main materials. For customized products, decoration companies need to give survival rulers (customized cabinets, cabinets, wooden doors, customized toilets, etc.). ) Before bricklayers, carpenters and even oilers enter the site, to avoid the completion of construction, customized manufacturers can take measurements on site before production (the production cycle of wooden doors is generally 25-35 days, and that of some paint-painted doors manufacturers is 60 days, as well as cabinets and customized cabinets).