What are the construction steps of diatom mud?
Second, the diatom mud construction steps

1, add a small amount of color paste to latex paint for color matching and stir evenly.

2. Roll on the wall with a wool roller. The drum is flat and naturally dry.

3. Select one of the combined carved plates and spray 3M glue evenly on the back.

4, according to the requirements of the construction effect height, will be fixed on the wall.

5. Stick masking tape on the wall where the alignment point is located, and flatten the engraving board by hand.

6. Stick a proper amount of metallic paint with a sponge roller. After the adhesive is uniform, roll-coat the pattern part evenly.

7. Gently take the engraving board to prevent it from touching the pattern part and wait for it to dry naturally.

8. Spray 3M adhesive on the back of the matching engraving plate, align it through the alignment hole and fix it on the wall.

9. Roll-coat the metallic paint on the pattern part with a sponge roller and roll-coat it evenly.

10. Gently take over the engraving board to prevent it from touching the patterned part. After natural air drying, the effect is complete.

Three, diatom mud construction matters needing attention

1. The base with empty drum or crack should be pretreated, cleaned and brushed with putty twice.

2. Avoid strong wind and direct sunlight during construction, and it is advisable to dry naturally.

3. Diatom mud products are water-soluble decorative materials and cannot be used in places that are directly wet by water.

4. It is normal that there are some differences in physical properties of natural raw materials, including their colors, which will not affect the quality of products.

5. Diatom mud should not be constructed below 5℃. Do not eat diatom mud, and avoid getting into eyes.

6. Keep a safe storage distance from children and strengthen labor protection when using.

7. Before construction, do a good job of protecting the existing finished products, and protect the places outside the construction surface with health-preserving materials in advance.

8. The base with empty drum or crack should be pretreated, and the base should be oiled or pre-scraped with paint when necessary.

9, in strict accordance with the provisions of the proportion of water, and electric mixer fully stir well.

10, avoid direct sunlight during construction.