Current location - Health Preservation Learning Network - Health preserving class - How many days does each construction period take? Find out the decoration process before starting work.
How many days does each construction period take? Find out the decoration process before starting work.
For the owners who experience the construction for the first time. The first thing to be clear is what the whole construction process is like. The construction process is usually divided into plumbers, bricklayers, carpenters, painters, cleaners, porters, professional product installers and so on. We found the decoration company and the construction team, and the next step is to start work.

At the beginning of the decoration, the following steps are roughly followed:

1, plumber

Slotting:

According to the design requirements, dismantle and open all pipe trunking (water supply and drainage roads, strong and weak current lines) and various walls.

Completion time: generally 3 days (if the room type changes greatly, you need to knock on the wall first, and the time may be extended)

Wiring:

Installation and arrangement of circuits, waterways and gas circuits.

Completion time: generally 4 ~ 7 days.

2. Mud (water) bricklayer

Surface decoration of civil engineering and wall and floor tiles:

Landfill trough, wall construction, all kinds of wall repair, floor tile and wall tile laying.

Completion time: generally 10 ~ 25 days.

3. Woodworking

Decoration and accessories production:

All decorative surfaces (walls of heaven and earth) and furniture shall meet the design requirements.

Completion time: generally 15 ~ 30 days.

4. painter

Decorations such as furniture and walls:

All wooden furniture, decorative surface decoration, ceiling and wall painting (latex paint, wallpaper wall covering).

Completion time: generally 20 ~ 40 days, especially when doing wall paint, which has a great relationship with the weather.

5. Electrician

Installation of lamps, etc

Completion time: generally 3 ~ 4 days.

6. Others

Curtain installation, self-purchased hardware pendant installation, and overall land reclamation and cleaning.

Completion time: generally 3 ~ 4 days.

7, need to pay attention to the external completion.

Now you can buy some furniture (such as sofa, dining table, etc. ) and move. It is recommended to stay for half a month or longer. If the materials used are environmentally friendly, there is no need to deal with indoor pollution after renovation, but attention should be paid to opening more windows for ventilation.