Current location - Health Preservation Learning Network - Fitness coach - What does the emblem of the 11th National Games mean?
What does the emblem of the 11th National Games mean?
Memorabilia of bidding for the 11th National Games

On February 1 1, 2004, a leading group for bidding for the 11th National Games was established in Shandong Province.

On June 5438+1October 65438+May, 2004, the provincial government formally submitted the bid report to the State Sports General Administration.

On February 25th, 2005, the General Office of the State Council approved the State Sports General Administration, agreeing that Shandong Province would hold the 11th National Games in 2009.

On July 19, 2005, with the approval of the provincial party committee and government, the Shandong Provincial Preparatory Committee for the 11th National Games was established.

On August 6th, 2005, the Preparatory Committee of Shandong Province held its first meeting, which marked the official start of our province's undertaking the 11th National Games.

On May 28th, 2006, Jinan Olympic Sports Center officially started construction.

The 11th National Games is the first national games held after the Beijing Olympic Games, and it is also an important part of * * * and China's birthday. From the perspective of our province, it is also the largest comprehensive sports meeting held in China for the first time since the founding of the People's Republic of China. In order to run the National Games well, Jinan will start with strengthening the construction of hardware and software, in which the hardware will build "one axis", "two rings" and "three districts", implement eight major projects and carry out six rectifications to create a social atmosphere of "harmonious National Games" in an all-round way.

The eight major projects are: sports facilities projects, including competition training venues, athletes' villages and national fitness facilities 139 items. Among them, the Olympic Sports Center, Licheng Gymnasium, Racecourse and Zhangqiu Gymnasium will be built, and Huang Ting Gymnasium will be rebuilt. There are 335 projects in six categories, including road network reconstruction, bus rapid transit, street lamps, parking lots, railway and highway construction.

Ecological landscape projects include 78 items in 6 categories, including garden scenic spots, river reconstruction, road greening, water saving and spring protection, mountain greening and flood control and waterlogging elimination. Focus on the improvement of Daming Lake, navigation around the city park, Xiaoqing River and other urban river water environment, implement comprehensive spring protection measures, and green the suburban mountains. Commercial service projects, including newly-built renovation service facilities and supporting construction around the Olympic Sports Center, include 67 items in two categories.

Pipe network construction projects include 44 items in four categories: electricity, water, heat and gas. Huimin Kangju Project, 25 projects, focusing on the transformation of shanty towns and old villages. City appearance and environmental engineering, including 32 items of sanitation and environmental protection. Night lighting project, focusing on the implementation of "ten roads, ten gardens, ten bridges and ten fields", with 340 landscape lighting for 300 buildings.

The six rectifications initiated by Jinan are mainly: rectification of illegal buildings, focusing on the demolition of illegal buildings in and around the expressway around the city. Renovation of damaged mountains, focusing on repairing damaged mountains on both sides of the main road. Road environment improvement, focusing on improving the environment on both sides of urban roads. Renovation of window parts, focusing on comprehensive renovation of the surrounding areas of competition venues, parks, stations, airports and important organs. Renovation of urban entrances and exits, focusing on the renovation of entrances and exits along railways, highways around the city and major cities. Renovation of residential areas, focusing on cleaning up dirty mess and improving parking lots and agricultural facilities.

Zhang Jianguo, deputy secretary of Jinan Municipal Committee and mayor, demanded that all rectifications should be connected with key projects to prevent repeated rectifications and waste; Pay attention to the connection with ecological environment construction and create a good ecological environment; Linking up with striving for civilized city and national environmental protection model city.

Venues in 2009

Delivery before the end of March.

Jinan is the main venue of the 11th National Games. According to the latest arrangement, during the National Games, Jinan will hold 22 wonderful events. They are: swimming, diving, water polo (men's), track and field, badminton, baseball, basketball (men's 1-8 final), boxing, equestrian (steeplechase, dressage and triathlon), speed horse racing, football (men's team competition and 1-4 final), gymnastics and art.

In order to hold these events, the stadium of Jinan Olympic Sports Center is under construction, and it will hold the opening ceremony and track and field competitions. Prepare two swimming and diving halls to undertake swimming, diving and water polo competitions; Badminton competition hall, basketball competition hall, boxing competition hall, equestrian competition hall (steeplechase, dressage, triathlon and speed horse racing) and two football competition halls (with night competition conditions).

In addition, gymnastics (rhythmic gymnastics) gymnasium, trampoline gymnasium, handball gymnasium, tennis gymnasium, men's volleyball gymnasium, women's volleyball gymnasium, weightlifting gymnasium and wrestling gymnasium will be provided. Baseball, softball, hockey and shooting competition venues are arranged and built by the provincial government.

According to the plan, all these venues must be completed before March 3, 20091,passed the acceptance of the State Sports General Administration and delivered for use.

Recruit volunteers

Serve the National Games.

According to the plan, Jinan will assist the Organizing Committee to complete the installation and debugging of the electronic information management and service system equipment and lines in each competition venue. Participate in the preparation of the competition schedule of each project and determine the time of competition, reception and activities.

In order to ensure the smooth progress of the competition, Jinan will also recruit a group of high-quality volunteers to serve the National Games. Cooperate with relevant departments to draw up work plans and schemes for administrative reception, transportation and vehicle support, medical services, financial budget, ticket sales and reception of other personnel, and submit them to the Organizing Committee for approval before May 3, 2009.

Jinan will also focus on the construction of Jinan metropolitan area, speed up the transformation of old cities and the construction of new cities, and strive to make the city look brand-new in about three years. Further strengthen the construction of urban infrastructure such as airports, stations, roads, bridges, water supply, power supply, gas supply, heating and public transport, and improve urban functions. Comprehensively strengthen the construction of business environment, tourism environment, cultural environment, public security environment, medical and health environment and citizens' quality, and create a good urban civilized environment for hosting the National Games.

Building the whole people

Fitness engineering line

The 11th National Games is a sports event, and Jinan hopes to promote the development of national fitness through this sports event. According to the plan, from now on, Jinan will seriously implement the "1.3 line" national fitness project. Build Jinan National Fitness Activity Center as the main venue of mass sports activities in the 11th National Games. Plan and build a tour route for national fitness facilities.

The three lines are: Jingshi Road National Fitness Project Line. Including Zhangqiu National Fitness Activity Center, Licheng District Tang Ye National Fitness Center and Changqing University Town. The second line is the leisure fitness center line. Combined with the renovation and expansion projects of Daming Lake Park and other gardens, some national fitness venues and facilities will be built to show the landscape characteristics of Jinan's "springs, rivers, mountains and lakes" and form a distinctive garden-style sports and leisure park.

The third line is the county fitness center line, which will take Jinan fitness activity center as the center and urban community fitness center and sports park as the subsidiary. Each county (city) district plans to build a national fitness center or fitness square with its own characteristics on the existing basis.

Jinan will build the "One Point Three Lines" national fitness project at a high level, and the national fitness facilities will reach the national first-class level, which will be completed before May 3, 2009, and will be accepted by the organizing committee and delivered for use.

Memorabilia of bidding for the 11th National Games

On February 1 1, 2004, a leading group for bidding for the 11th National Games was established in Shandong Province.

On June 5438+1October 65438+May, 2004, the provincial government formally submitted the bid report to the State Sports General Administration.

On February 25th, 2005, the General Office of the State Council approved the State Sports General Administration, agreeing that Shandong Province would hold the 11th National Games in 2009.

On July 19, 2005, with the approval of the provincial party committee and government, the Shandong Provincial Preparatory Committee for the 11th National Games was established.

On August 6th, 2005, the Preparatory Committee of Shandong Province held its first meeting, which marked the official start of our province's undertaking the 11th National Games.

On May 28th, 2006, Jinan Olympic Sports Center officially started construction.

Olympic sports center

The beautiful scenery is beginning to appear.

On the 8th, the reporter saw at the construction site of Jinan Olympic Sports Center that the construction workers were in full swing and their clothes were all wet. After more than a year of intense construction, the outline of the stadium has initially appeared, and the main project below the third floor has been completed, which looks like willow leaves from a distance, and willow is the city tree of Jinan.

In the stadium, construction workers are tying steel pipe racks for the top construction. In a wide field, the steel pipe rack is very imposing. On-site construction personnel explained that the day when these steel pipe supports were removed was the day when the main project of the stadium was completed, and everyone was looking forward to the completion of the stadium.

A staff member told reporters that this stadium is relatively advanced in China, and he and his colleagues are very honored to participate in this project. This kind of opportunity is not for everyone. Now everyone is working overtime day and night, full of energy. It is best to finish the construction ahead of schedule.

In the stadium area on the east side of Jinan Olympic Sports Center, the reporter saw that the construction was also in full swing. The hills that plagued the construction have disappeared, and the surrounding land has been completely razed to the ground. On March 2, this year, construction started in the eastern stadium area, but the construction speed was very fast. The gymnasium has begun to take shape, the stands have been set up, and the construction workers are pouring nervously.

The reporter stood on the distant mountain and looked up. The three stadiums in the east look like blooming lotus flowers as a whole, and the "East Lotus Willow" scenic spot in Jinan Olympic Sports Center has begun to appear.

"Our Olympic Sports Center is really beautiful!" A passing citizen couldn't help but say when he saw Jinan Olympic Sports Center.

two-thirds

The stands provide shelter from the rain.

"Two-thirds of the stands will be covered with roofs to keep out the wind and rain, so fans don't have to worry about rain when watching the game." At the construction site of the stadium, workers are splicing steel brackets. Compared with the current provincial sports center, the stadium design of Jinan Olympic Sports Center is more humanized.

Walking into the stadium stands, the reporter noticed that the stands below the third floor have been completed, some supports have been removed, and some high-rise stands have been completed, exposing the concrete floor, but the stands on the east and west sides are still under construction and some templates have not been removed. The person in charge of on-site construction told the reporter that the design concept of the stadium is very advanced, and the influence of bad weather on the audience is fully considered. More than two-thirds of the stands are covered by roofs, so most fans don't have to be afraid of rain when watching the game.

At present, nearly 10,000 staff members are working around the clock to strive for the early completion and national acceptance of Jinan Olympic Sports Center. According to the plan, the east stand of the stadium will be completed on June 20, and the main construction of all stands will be completed before the end of June. At that time, the support will be hoisted, and the hoisting will be completed before the end of August. By the end of 2007, the curtain wall and wet work outside the stadium will be completed. The three venues in the east are also advancing at a faster speed. The main construction will be completed in mid-August, and the venue construction will be completed before the end of next year.

swimming pool

Use solar energy

On the afternoon of the 8th, the reporter saw in Jinan Olympic Sports Center that the connection area between the East Stadium and the West Stadium had started construction, the foundation had been built, and the construction workers were pouring concrete. According to the construction party, the connecting area will be built in layers, and Jinan will turn it into a new fitness and leisure square with reference to the standards of quancheng square. In this new square, there will be fountains, green spaces, leisure chairs and various fitness equipment, and some big trees will be transplanted to let the citizens enjoy the shade in advance.

From the connection area, the construction of the East Stadium of Jinan Olympic Sports Center is more complicated. In the process of construction, considering the future operation, all three stadiums in the east will make comprehensive use of solar energy.

The relevant person in charge of the project department of Jinan Olympic Sports Center told the reporter that the facilities and construction technology of the eastern venues are very high. Energy conservation was fully considered in the construction of the eastern venues. There is only one energy center in the whole eastern venue area, and the gymnasium, swimming pool and tennis center have facilities to receive geothermal energy.

At the top of these venues, solar energy equipment will be installed, which can directly receive and convert solar energy. Especially the swimming pool, considering the comprehensive utilization after the 11th National Games, more solar energy equipment was installed. When opening to the outside world, water can be heated without power supply, which greatly reduces the operating cost.

Construction of provincial venues broke ground.

Coming out of the Olympic Sports Center, the reporter took a bus about 4 kilometers eastward along Jingshi Road and came to Quangang Road. In the east of Quangang Road, south of century avenue and north of Jingshi Road, a new stadium will rise, which is the provincial stadium area of the 11th National Games.

At the scene, the reporter saw that the construction land of provincial stadiums has been enclosed, several excavators are under intense construction, construction workers have been in place, and some stadiums have excavated foundations. On the hillside on the south side of the construction site, temporary houses for the project have been built, some rooms have been hung with signs, and the staff have been working here.

At the construction site, the reporter saw the plans and renderings of provincial venues. The planned area of the stadium is 1.046 mu, of which 93 1 mu can be used for construction, with a total construction area of 299,800 square meters and a total investment of 1.24 million yuan.

The reporter learned that swimming and diving training halls, wrestling, judo, weightlifting, taekwondo, boxing training halls, track and field training halls, ball comprehensive training halls, gymnastics, trampoline, martial arts, Sanda training halls, hockey competition halls, baseball competition halls, shooting halls, and hotels, power distribution stations, communication exchange stations, natural gas exchange stations, heat exchange stations and other supporting facilities will be built in the venues in the province. In addition, it also includes athletes' apartments, student dormitories, canteens for athletes and staff, student canteens, boiler rooms and ancillary buildings, hospitals, office buildings, university gymnasiums, libraries, comprehensive teaching buildings and other school places.

Judging from the renderings, the venue design of the provincial stadium project is very modern. Relevant people told reporters that the planning and design of the venue is still being improved to better serve the 11th National Games. According to the plan, by the end of this year, all the main projects of provincial venues will be completed. After the 11th National Games, the venues here will be used by the Provincial Institute of Physical Education.

Many supporting venues are about to open.

During the 11th National Games, the competition venues in Jinan are mainly arranged along Jingshi Road, starting from Zhangqiu in the east, passing through the urban area, the provincial gymnasium, the Jinan Olympic Sports Center and the provincial sports center, and reaching the University Science Park in the west. When the reporter visited on the 8th, he found that in addition to the Jinan Olympic Sports Center and provincial-level construction venues, a number of other supporting venues will also start construction one after another.

A racetrack will be built in Ganggou.

At the kick-off meeting of preparations for the 11th National Games in Jinan, Zhang Jianguo, deputy secretary of the municipal party committee and mayor, announced that Licheng District would plan to build a racetrack. But where will this racecourse be built?

On the afternoon of the 8th, the reporter left the provincial gymnasium and went east along Jingshi Road to Hong Kong West Road. To the south of SHEN WOO Village, he saw an open field. It's still desolate, without any buildings. The reporter learned from various sources that the address of the racecourse was originally set in this place-south of SHEN WOO Village, Licheng District, at the southeast corner of Tourist Road and Gangxi Road.

Several villagers in SHEN WOO Village confirmed this statement. They told reporters that a lot of cars and leaders came here some time ago. It is said that a racetrack will be built nearby to see the place.

Relevant people told reporters that there are few racetracks in China, and the design scheme of the racetrack in Licheng District has not yet been determined. However, after many investigations, the address has been basically determined, and it is expected to be fully launched in the second half of this year. The racecourse covers an area of about 1000 mu, and it will be the first-class in China in terms of scale and technical content. During the 11th National Games, the racecourse will hold three-day equestrian events (jumping hurdles, cross-country and dressage) and speed horse racing.

In addition, Licheng District will also host women's weightlifting and men's weightlifting competitions in the National Games. Licheng District will invest in the construction of a sports center gymnasium, initially located in the central area of Tang Ye New District.

Zhangqiu will build a gymnasium.

According to the preliminary arrangement, Zhangqiu will host men's volleyball and women's volleyball competitions during the 11th National Games. Due to the needs of the competition, Zhangqiu will build a gymnasium and supporting training center. According to the preliminary plan, the gymnasium will be built in the west outer ring of Zhangqiu, close to the development zone.

According to the plan, by the end of 2008, these newly-built stadiums will be basically completed, and the stadiums that need to be rebuilt must also be completed.

Before the end of March 2009, all kinds of competition training halls and ancillary facilities should be completed and passed the national acceptance, and the national fitness facilities should be completed and delivered before the end of May 2009.

The road network of Jinan Olympic Sports Center has begun to take shape.

When holding major sports events, how to divert the audience often becomes a difficult problem. On the 8th, the reporter saw in Jinan Olympic Sports Center that the road construction here is very fast, and most of the eight main roads have been paved with asphalt pavement, among which the South Sports Road has all been paved.

The reporter saw that there are 8 municipal roads in and around Jinan Olympic Sports Center, namely: Tiyu South Road, Tiyu North Road, Tiyu North Road East Road, Tiyu West Road, Integrated Service Building East Road, Integrated Service Building West Road and Longdong Road. These eight roads cross each other, and the road network is perfect. The audience can be diverted from any road to Jingshi Road, Jiefang East Road and Tourist Road.

At present, the construction of these eight roads has been in full swing. However, the reporter found that the construction progress of Sports West Road was the slowest, and the staff had already got through the foot of Dongshan Mountain, and the road passed through the foot of Dongshan Mountain.

On-site construction personnel told reporters that Sports West Road is the most important north-south passage of the Olympic Sports Center. This road not only connects Tourist Road and Jingshi Road, but also will continue to open to the north, connecting with the planned east extension of Jiefang East Road, thus connecting with Qilu Avenue. In the future, this road will undertake the main diversion task. Due to the huge amount of work, the progress of Sports West Road is the slowest.

The reporter also found that there is an overpass under construction at the intersection of Longdong Road and Tourist Road. The staff told the reporter that this is Longdong overpass. Because the tourist road is higher than Longdong Road, in order to solve the traffic problem, the design department has planned a 6-ramp interchange here, Longdong Road is the lower level and the tourist road is the upper level. The overpass not only skillfully connects Jinan Olympic Sports Center with Tourist Road and Longdong Road, but also can reasonably divert passing vehicles to avoid traffic jams and poor traffic.

In addition to road construction, greening on both sides of eight municipal roads around Jinan Olympic Sports Center is also under intense progress. In order to cooperate with Jinan Olympic Sports Center, the grade of green belt is also very high, and the tree collocation is also very reasonable. According to the plan, all these roads will be completed and opened to traffic before the end of this year, and the greening on both sides will be basically completed.

Related links

Division arrangement of the 11th National Games

According to the overall arrangement of the 11th National Games in 2009, all the cities in the province 17 arranged competition events. In addition to Jinan, the main venue, Qingdao will undertake 9 projects including archery and fencing. Rizhao will host five competitions, including rowing and kayaking. 4 items in Taian; 3 in Zibo and 3 in Yantai; Weifang, Weihai, Linyi and Binzhou each have 2 items, and Zaozhuang, Dongying, Jining, Laiwu, Dezhou, Liaocheng and Heze each have 1 item.

In addition, in addition to figure skating and other ice events, our province will entrust relevant provinces and cities in Northeast China to assist in organizing the marathon, and the marathon will also be held in Beijing in accordance with the relevant regulations of the State Sports General Administration.