Model essay on monthly work summary of engineering project department 1
Through the regulatory detailed planning of the port office, I feel that all aspects have grown a lot on the whole. Especially as the project leader, I have exercised a lot. In terms of professional knowledge, under the careful guidance of my teacher, I have mastered some parts that I lacked before. In addition, in the communication with local governments and in the reporting process, I can calmly face the project problems raised by expert leaders. In this plan, I am mainly responsible for land use and urban design. Let's share my personal experience.
Land use part
Land use is mainly considered from three aspects: roads, land use layout, land use nature and land use scale.
The first step is to determine the road centerline. The determination of the road centerline should first be combined with the current road, and slightly adjusted on the basis of the current road centerline. In this process, it is necessary to consult the corresponding specifications, such as "Code for Design of Urban Road Engineering" cjj37-. Firstly, according to the present situation, the roads in the planning area are analyzed to determine their road grades. If it is a circular curve, how to determine the turn of the circular curve? After the road slope is determined, the design speed of the road is known. Please check Table 6.2.2 in Code for Design of Urban Road Engineering to determine whether there is a minimum radius of superelevation circular curve. Whether to set superelevation should be carefully considered according to the trend of the current road centerline. The distribution of right of way mainly refers to the superior planning and current situation. In case of special circumstances, it can be fine-tuned according to the laying needs under its jurisdiction. Then, considering the special situation of the port, according to the specifications, the longitudinal slope of the bridge should not be greater than 4.0% for motor vehicles, 2.5% for non-motor vehicles, 5.0% for motor vehicles at the approach of the bridge head and 0.3% for the bridge deck. For the problems encountered at intersections, see Code for Design of Urban Road Intersections for details. It involves kerb radius, intersection circular curve and other issues.
The second step is to determine the land use layout according to the planned spatial structure.
The third step is to determine the nature of land use on the basis of the investigation of the current situation, clarify the purpose of this planning according to the demand and project positioning, and then determine whether to retain renovation or development and construction. In the process of investigation, we should pay attention to the detailed comprehensive evaluation of buildings, and only through this evaluation can we analyze the potential of land use. According to the potential and present situation of land use, we can make corresponding adjustments. For some local land, we can consider the short-term and long-term development and whether to keep it.
Fourth, the number of public service facilities needs to be determined according to a reasonable service radius. In addition, the determination of land use scale needs to be verified by referring to the corresponding specifications.
Urban design part
Before designing, we must have a concept and present a suitable spatial environment structure under the implementation of our design concept, so as to guide our design reasonably.
Based on the location advantages of the planning area, this port city design puts forward four concepts: ecology, livability, new water town and gateway. Following these four concepts, we draw the structural diagram of the space environment and show our design concept in the form of points, axes and belts. The following describes how to embody this concept in the design of port projects:
Ecology-The port itself has the natural advantages of Zhangjiagang River. Therefore, by building ecological corridors along the banks of the river, the river is divided into three areas, namely, ecological viewing area, national fitness area and wetland leisure area. Colorful trees and shrubs such as peach trees, red maple trees and banana trees can be planted along the river in Zhangjiagang to create a colorful waterfront ecological landscape belt. Along the inland rivers Xitang River and Jinyang River, the ecological landscape will penetrate into the interior of the plot.
Livable-the planning area is mainly reflected in three aspects. First, configure public service facilities according to a reasonable service radius to facilitate residents' lives; Secondly, the creation of public space, the setting of open space such as riverside park, street garden, citizen square and ecological corridor will create comfortable outdoor leisure space for residents and enrich their lives; Thirdly, considering the requirements of building volume ratio, building density and building height, the whole planning area is dominated by low-rise buildings, and the neighborhood center is dotted with small high-rise buildings.
The construction of new water town-new water town is mainly considered from the aspects of architectural style, architectural color, architectural height, open space and ecological environment. The architectural style adopts modern water town style, and the architectural color is gray-topped cornices and white walls. The height of the building is mainly low and multi-storey, with small and high-rise decoration. Open space is constructed by ecological corridor, and the ecological environment permeates all parts with blue-green main axis.
Portal-There is a regional road, National Highway 204 in the planning area, so the intersection of National Highway 204 and Commercial West Street is chosen as the portal of the planning area, and the original port stone tablet is retained, with the cultural landscape wall as the foil. Big trees were planted at the entrance. The use of ginkgo biloba is guided here, and the surrounding area is set off by garden planting.
Similar to the port, when we encounter other urban designs, we do the same. Firstly, introduce creativity, build a spatial environment structure around creativity, and then carry out specific layout design around creativity.
Personally, I think the specific layout design should be coordinated from the following steps:
1, according to the spatial structure, overall grasp, overall planning of regional layout.
2. According to the plots divided by the planned road, first of all, each small plot should be designed with specific organizational structure, and at the same time, it should be connected with the surrounding plots. If the organizational structure is well designed, the overall design and layout of each plot will be obvious.
3. As for the placement of the building, we should consider the volume and function of the building and choose the appropriate architectural form. The layout of architectural form should also pay attention to the combination of spatial form and texture.
4, the color expression of the whole design, this must mention our design concept. Where ideas and design concepts are embodied, they should be highlighted with distinctive forms of expression. Explain the effect of the whole drawing clearly and explain our characteristics clearly.
To achieve the above points, we can't say how excellent the design is, at least we can basically grasp the main points of the design.
Through the detailed planning and design of the port office, I personally summed up the design experience of some projects, hoping to play a modest role in my future study and work.
Model essay on monthly work summary of engineering project department II
Combined with the implementation of Yongjia County's action to improve the scientific literacy of primary and secondary school teachers and the reality of our teachers, Qiaotou Town Middle School chose the school-based training project of "Text Interpretation and Teaching Content Expansion" in each subject this school year. Under the deployment of the teaching department, the research of this project is divided into three stages, that is, the academic year is the first stage of the project training, that is, the text interpretation and expansion of the seventh grade teaching content. To this end, under the guidance of the relevant teachers' trainers in the county teachers' training school, various disciplines in Qiaotou Town Middle School have carried out corresponding training and discussion activities, which are summarized as follows:
1. At the beginning of the semester, the heads of teaching and research sections of various disciplines were sent to actively participate in the on-site communication meeting on literacy improvement held by the county teacher training school. After the meeting, an internal meeting of the teaching and research group was held in this group to convey the spirit of the meeting and clarify the training purpose.
2. Give full play to the leading role of the head of the teaching and research group, the head of the lesson preparation group and the famous teacher, and interpret the text according to different units and class hours in the group to improve the teachers' ability to grasp the teaching materials.
3. According to different types of classes, including new classes and review classes, various disciplines carry out on-site seminars and lectures respectively. The activity is divided into two steps, one is to prepare lessons collectively, and the other is to attend seminars and evaluate classes. Take the Chinese language group as an example. The topic of collective lesson preparation this semester is "The Tree". The seminar was presided over by Hou, a county academic leader. First of all, Zhu Yunyan, the backbone of the county teaching field, gave a lecture on "Examples of Prose Reading Teaching", and Huang, the backbone teacher of the city, made an analysis report on the learning situation. Then, each group made an in-depth text interpretation around Wang Dingjun's essay Tree. In the meantime, each group (divided into three groups) expressed their opinions according to their own understanding and sentiment, and the atmosphere of the seminar was warm. In the step-by-step teaching template display, each group of teachers asked questions and discussed them wonderfully. On behalf of the teachers, the group presents the results of collective lesson preparation in the form of classroom presentation, and discusses how to present them effectively in the classroom. Then Dong Pei, a special-grade teacher, leads the class to show and enlighten the interpretation of the text. The whole activity culminated in one after another: Teacher Jin Xuefen, the leader of the county discipline, made a wonderful personal interpretation of the tree, and Xie Jianfeng, a researcher at the county teacher training school, made an incisive comment, which ended with the warm speech of the principal Huang Damao.
Of course, there are still some shortcomings in school-based training in our school, such as low participation of individual group teachers, some teachers' coping psychology, insufficient attention to training, insufficient professional guidance in individual disciplines, poor basic skills, and no major breakthrough in text interpretation, which need to be continued.
Monthly work summary of engineering project department model essay 3
Under the care and guidance of the Municipal Agriculture and Forestry Bureau and the District Agriculture and Forestry Bureau, our company won the bid according to the "20-year municipal green bidding project contract", "20-year municipal agriculture and forestry bureau bidding project implementation plan" and "20-year municipal agriculture and forestry bureau bidding project":
Our company originally planned to lease 3,000 mu of land in the district and town (see Annex Agreement for details), and the actual use area is 2,470 mu, reaching the scale of 2,450 mu stipulated in the contract, of which: 1.750 mu is in※ village, 320 mu is in※ village and 400 mu is in※ village, so as to build an excellent green seedling base.
1. Completion of production and construction: According to the requirements of the project and the needs of green seedling production, the base is divided into 9 areas (see attached figure for details), namely: sowing area, asexual propagation area, transplanting area, cutting seedling area, introduction and domestication area, large seedling area, germplasm resources preservation and development area, greenhouse area and management area.
(1) Seeding area: Choose the central area with the best natural and operating conditions, which is required to be close to the management area, with flat terrain, stable water source, deep and fertile soil layer and sunny leeward.
(2) Vegetative breeding area: the area for cuttage, layered seedling, ramet and grafted seedling cultivation is located in the central area with deep soil layer and high groundwater level, which is convenient for irrigation and drainage.
(3) Transplanting and seedling raising area: If the seedlings propagated in the planting area and the vegetative propagation area need to be further cultivated into larger seedlings, it should be carried out in the transplanting area, which is the early stage of seedling raising in the large seedling area and located in the south and north respectively.
(4) Large seedling area: The seedlings cultivated in the large seedling area are tree-shaped and older, and will not be transplanted before leaving the nursery, and the cultivation period is longer, so they are placed in the western and southern regions with convenient transportation.
(5) Mother tree area: In order to obtain excellent propagation materials such as seeds, cuttings, tillers, etc., a mother tree area such as cuttings was established, which is located in the southern Sambo Group.
(6) Introduction and domestication area: In order to enrich the varieties of green seedlings, it is necessary to introduce and increase plant seeds and varieties suitable for growth and reproduction in this area.
(7) Germplasm Resources Conservation Development Zone: This zone collects, domesticates and preserves rare and excellent broad-leaved tree species, economic tree species, green ornamental tree species and other excellent germplasm resources at home and abroad, and develops varieties.
(8) Greenhouse area: According to the needs of green seedling cultivation, this area can raise seedlings all year round, with high production efficiency and good economic benefits. This area is built in the central area near the management area.
(9) Supporting production area is the construction of management area. The main task of this area is to be responsible for the daily work of the base, such as organization, management, coordination, preparation and logistics support. The construction contents include office, dormitory, canteen, warehouse, seed storage room, tool room, garage, threshing floor and composting yard.
2. Infrastructure construction: 2,200 mu of land has been leveled in the whole base, exceeding the standard of 1.500 mu stipulated in the contract. Construction of a 3.5-meter-wide tractor road of 6700 meters, a 3-meter-wide secondary road of 8000 meters and a high-standard cement road of 3000 meters to meet the requirements of supporting and unblocked primary and secondary roads in the park; Construction of irrigation and drainage channels of 23,500m, and 36 culvert pipes * * *, with a meter of140m; Mechanical well with 300 cubic meters of sunrise water at a depth of 90 meters 1 mouth, dirt well with 30 cubic meters of sunrise water 1 mouth; There are 0/4 newly expanded reservoirs/kloc-,and the base storage capacity can reach 80,000 cubic meters, initially forming a relatively complete irrigation and drainage system. Construction of six-span greenhouse 1 sunlight greenhouse (1.900 square meters) and single greenhouse 10; In addition, a modern high-standard cutting pool of 1000 square meters has been built, which basically meets the needs of seedling production at present.
3. Seedling production: * * 84 kinds of excellent green seedlings were introduced, including 156 varieties, accounting for 1, 8 1 000 plants, such as: Hong Kong Sizhaohua, Phoebe chekiangensis, Acer truncatum, Pyracantha orange, etc. ; 75 kinds of conventional excellent green seedlings were planted, totaling 6.5438+0.2 million plants, such as osmanthus fragrans and magnolia grandiflora. Introduce new varieties. 34 seeds, sowing more than 40 acres, such as: coral cypress, North American Liquidambar formosana and so on. , can produce 500 thousand seedlings; Introduced 47 excellent ground cover plants and flowering shrubs; 265,438+00,000 flowering shrubs were cut and propagated in the cutting pool. Please refer to the attached table and equipment list for the above items.
4. Nursery machinery and supporting equipment: newly purchased sprinklers/KOOC-0/set, tractors/KOOC-0/set, agricultural tricycles/KOOC-0/set, generator set/KOOC-0/set, lawn mower/KOOC-0/set, 7 water pumps, shovels, pruning shears, hand saws, sprayers, etc.
5. Our company applied to the State Administration for Industry and Commerce for registration of the "RMB" trademark, which has been approved (see the annex for details).
6. A total of 9 signs are set up, including 1 3.5-5.7m large sign, 9 zoning signs and multiple variety signs.
7. Project management
① Organization and leadership: During the construction of this project, the company and the competent departments of agriculture and forestry in the city and district where the base is located set up a project construction leading group. The company is responsible for project preparation, the base is responsible for project construction, and the director of the base is responsible for it. The target responsibility system, competition for posts and strict reward and punishment system are implemented within the base.
(2) Scientific and technological support: This project requires cultivating "excellent green seedlings" and building a production base with high standards. Therefore, engaging in scientific and technological guidance requires a certain scientific and technological content and a higher scientific and technological guidance institution. Our company takes "Chinese Academy of Forestry Science" and "-Forestry University" as technical support units to provide advanced technical management mode for the base. At the same time, relying on the Southern Seed Center of the State Forestry Administration as the base, it provides pioneers and excellent provenances of green seedlings that have been successfully developed at home and abroad.
③ Brand management: According to the construction characteristics and requirements of this project, our company adheres to the overall image of "high, new and special" in seedling production and market positioning. "High" means that the company has a high starting point for the base and high requirements for the seedling size of production. The construction is to cultivate high-standard seedling services, such as uniform branches under street trees; "New" means new varieties of seedlings, mainly relying on scientific and technological support units to introduce new varieties of green seedlings at home and abroad, such as Liquidambar formosana, Melilotus argentea, Alnus cremastogyne, rosewood and so on. "Special" means that the finished seedlings produced in our base will have a unique shape. For example, the cluster of Lagerstroemia indica will be branched step by step according to a certain proportion to form an upside-down cone. Our company carries out the overall image packaging of these three words, and strives to establish the overall image of the company in the market, giving the society and customers integrity and freshness.
Monthly work summary of engineering project department model essay 4
Under the careful guidance of the Provincial Department of Commerce and the Provincial Department of Finance, we actively sought financial support from higher authorities to help enterprises explore the international market, and the city's foreign trade showed a strong recovery growth trend. According to the spirit of the Notice of Hunan Provincial Department of Commerce and Hunan Provincial Department of Finance on Doing a Good Job in the Application of International Market Development Fund Projects for Small and Medium-sized Enterprises in Hunan Province (Xiang Shang Gui Cai [-] No.62) and the Notice of Hunan Provincial Department of Commerce and Hunan Provincial Department of Finance on Issuing the Amount of International Market Development Fund for Small and Medium-sized Enterprises in Hunan Province (Xiang Shang Gui Cai [-] No.96), we are now exploring the international market for small and medium-sized enterprises in our city.
I. Appropriation for Project Audit
In, the municipal districts of our city audited and reported 57 international market development fund projects for small and medium-sized enterprises of 29 companies, and actually allocated 1.04 million yuan. Among them, there are 2 overseas exhibitions with an amount of 45,000 yuan; Management system certification 16, with an amount of 3 1. 1 ten thousand yuan; 4 product certifications, with an amount of 80,000 yuan; International market promotion 15 times, with an amount of 20 1 10,000 yuan; 5 overseas advertisements and trademark registrations, with the amount of1020,000 yuan; Four overseas market visits, with an amount of 6,543,800 yuan+0,500 yuan; E-commerce activities 1 1 time, amount196,000 yuan. It can be seen that the most supported project category is management system certification, accounting for 30%, followed by international marketing and e-commerce activities, accounting for 19.3% and 18.8% respectively.
In, according to the market situation and the actual situation of foreign trade development in our city, we mainly supported agricultural textile and electromechanical enterprises, accounting for 82.7%; Mainly support enterprises with import and export performance, accounting for 75.8%; Mainly supporting production enterprises, accounting for 89.6%. In addition, we examine and approve projects in a sunny way, with an average support of 6,543,800 yuan for a single project and 35,800,000 yuan for a single enterprise. The enterprises that received the most funding only received 55,000 yuan, which played a good role in the "four to two" project funds. At present, the international market development funds of small and medium-sized enterprises in the municipal districts of our city have all been allocated to relevant project units.
Second, the project implementation effect
The declaration and disbursement of funds for small and medium-sized enterprises to explore the international market has further improved the enthusiasm of the majority of small and medium-sized enterprises in our city to explore the international market, enhanced the competitiveness of enterprises in the international market, and promoted the rapid growth of foreign trade in our city with remarkable results.
1. The development of foreign trade has accelerated. In, the city's total import and export volume reached US$ 376 million, a year-on-year increase of 66.9%, ranking third in the province. Among them, the total import and export volume of municipal districts was US$ 333 million, up 67.6% year-on-year, accounting for 88.6% of the city. Enterprises that receive financial support for the international market development of small and medium-sized enterprises include slaughterhouses, Lean Electronics, Sanchao Plastics, Jinfo Tea Industry, Harmonious Bamboo Industry, Jiujiu Towels and Huitong New Materials. , have improved their import and export performance by more than 100%, and the highest even reached more than 47 times.
2. The number of foreign trade entities is constantly expanding. In, there were 84 enterprises with import and export performance in our city, an increase of 13 over the previous year, of which 12 were newly added in municipal districts, and enterprises supported by the international market development fund for small and medium-sized enterprises, such as Xinchang Bamboo and Wood, Thai Industry and Trade, Sally Hosiery, Buli Clothing, Haosen Rubber Industry and Heping Xinda Food, all made new achievements.
3. The market diversification strategy has achieved results. In, there were 87 foreign trade countries in our city, covering all continents in the world. Small and medium-sized enterprises in the city's municipal districts actively participated in overseas market inspections, exhibitions, external publicity, various certification and e-commerce activities, consolidated traditional markets and expanded emerging markets, and the import and export volume increased substantially. In particular, the export value of enterprises such as Aihua Electronics and Meat Factory supported by the project exceeded $65.438+million for the first time.
4. Further optimize the structure of export commodities. According to the situation of our city, we will focus on supporting agricultural textile and electromechanical enterprises, and further increase foreign trade exports. In, the export of agricultural products, clothing, textiles and mechanical and electrical products of our city increased by10/.7%, 52.9%, 42.6% and 67.2% respectively, further optimizing the export commodity structure of our city.
Three. Main methods of project work
For a long time, the commercial and financial departments of our city have attached great importance to the development funds of small and medium-sized enterprises in the international market. The main methods are as follows:
1, attach great importance to it and earnestly implement it. First, leaders attach importance to it. Bureau leaders are responsible for coordination, and relevant departments are responsible for implementation; Second, the responsibility is put in place. On the basis of special person in charge, it is necessary to have a clear division of labor, clear responsibilities and transparent work; Third, policy propaganda is in place. Through forwarding documents, face-to-face explanation, on-site guidance and other forms, we should try our best to leave no gaps in policy propaganda, so that relevant enterprises can be familiar with policies and declare them in time.
2. Carefully guide and provide good service. First, carefully understand the situation of enterprise projects and try to make full use of plan fixed approved by various provincial offices; Second, through research and visits, we will give special guidance to new applicants and take pains to explain them to ensure that every applicant understands the operation process.
3. Strictly check and carefully review. First, adhere to the principle of "openness, fairness and justice" and select project units among import and export enterprises; Second, adhere to the principle of paying equal attention to sunshine and key points, and give full play to the role of project funds; Third, adhere to the principle of strict audit, check the project units one by one, carefully accept the copies and originals, and never allow fraudulent declaration.
4. Strengthen coordination and speed up disbursement. First, the commercial and financial departments should strengthen coordination and make joint efforts to improve work efficiency; The second is to strengthen management, and urge the Municipal Finance Bureau to timely allocate funds to relevant enterprises, and shall not intercept or misappropriate them.
Fourth, the existing problems
Judging from the application and implementation of small and medium-sized enterprises' international market development funds, there are still the following main problems: first, some enterprises have insufficient understanding of the importance of opening up the international market and hold an indifferent attitude, thinking that the amount of project funds is small, which has little effect on the development of enterprises and their application enthusiasm is not high; Second, the declaration quality of some enterprises is not high, the online declaration is not standardized, and the paper materials are incomplete or unclear. Third, the slow progress of financial allocation in individual municipal districts has led to many complaints from enterprises.
Verb (abbreviation of verb) Some suggestions
In recent years, the work of international market development funds for small and medium-sized enterprises has become increasingly standardized, the application procedures have been gradually simplified, and the enthusiasm of enterprises for application has also been improved. To this end, the suggestions are as follows: First, give more policy preferences to economically underdeveloped areas, appropriately increase the amount of project funds, and promote the further development of open economy; The second is to strengthen the education and training of project declaration in cities and counties, and cultivate a group of project declaration professionals who understand policies and are familiar with business.
Model essay on monthly work summary of engineering project department 5
After reporting to the company in May, I was assigned to work in the engineering department, mainly responsible for the asset management of each project department and miscellaneous affairs of the handling department. I know this is a preliminary test given to me by the company. I know that the key to success is to start with small things, so I take every small thing seriously in my daily work, and I will take it seriously wholeheartedly. I still remember that on May 14, the first job given to me by the department was to go to Tuanjie Reservoir to measure and draw the completed map. Because the site construction is unfamiliar with the site, I have encountered many difficulties, so I can only learn from the site construction personnel, and only spend more time measuring, analyzing and comparing the original construction drawings. It took me a few days to complete this task, and the completion of this work became an example of many similar works later. As long as you are willing to study hard, there is nothing you can't finish. Later, many as-built drawings, such as Chanba 1, West High-tech 5, 18, Zhang Lamu of the World Expo, sentry box, Guodian and other projects, were well reviewed, revised and plotted, all thanks to the first training.
After the management of the company's fixed assets was handed over to me, many problems were found through inspection, and some standardized management was published in newspapers many times. Almost every issue of the newspaper has a document notice issued by the project, and each project department has been inspected three times on average this year, which is also what I personally think is very unsatisfactory this year. One is due to the time and traffic conditions, and the other is the uncertain timing. For example, the fixed assets of Weihe Sheng Xing Park are relatively small, so we must pay enough attention to it, which is also needed for next year's work.
After entering June, the settlement of Yangling Arboretum Project was started, and the lifting of drawings was completed. Because of the particularity of Yangling Arboretum project, the visa has been changed a lot, and there are also many changes on site, especially more than 200 kinds of seedlings and flowers in the greening part, so this task is one of the most difficult tasks. After field measurement and careful analysis of construction drawings, it took a lot of time and energy, and finally achieved ideal results with the cooperation of colleagues Qi Xin.
Just put down the settlement work of Yangling Arboretum, at this time, the company received the design work of Weihe 36 Bid Section, and the boring and heavy work of earthwork calculation of 36 Bid Section construction drawing was also given to me at this time, which is also the first complete and responsible major work this year. During this period, almost all employees in the company worked overtime to do this work, which was a moment to test the team spirit. After a reasonable division of labor and the cooperation of the whole company, during this period, we should constantly guide you to learn the algorithm principle, popularize the knowledge of CAD software operation, check the calculation process, calculate and provide the original basic data, and finally summarize nearly100000 digital data, etc ... It took more than two weeks to complete, and finally the joy of success was the most unforgettable this year. The hard work of working overtime without vacation for half a month was not in vain, nor was the summer heat in July. Facts have proved that hard work will definitely pay off.
I have just finished the significant earthwork calculation work and have not fully recovered. With the full implementation of the Expo project in 20 10, my focus shifted to the Expo project. At this time, there are problems such as the purchase volume and processing specifications of nearly 100 kinds of materials, and the technical specifications of more than 100 kinds of complex processes such as stone, anticorrosive wood, steel, green seedlings and flowers. And the statistical verification of this work falls to the engineering department. On the one hand, it is necessary to provide a basis for the procurement work of the material department, on the other hand, it is necessary to carefully analyze and review the drawings, control the material cost, and check the bill of quantities when bidding. I am very grateful to the company for trusting me to complete such an important work, and I am also very happy to participate in the construction of the world horticultural project. More than 200 drawings, more than 300 pages of lists have been turned over, dozens of pages of calculation data manuscripts have been counted, and the final summary table has been revised ... Once problems are found in inspection and review, they will be re-analyzed, supplemented and refined, only to provide the most accurate quantitative basis for the material department and reduce unnecessary losses and waste for the company. This work also provides the accumulated first-hand original data for the later evaluation work, and also lays a solid foundation for the later evaluation work. With the completion of the later evaluation work,
20- This is a hard year and an unforgettable year. After August, the company turned to the climax stage of bidding in an all-round way, assisting the business department to make bidding documents, and so on. With the comprehensive bidding, the company also found that there were many problems in the bidding construction organization design, so it clearly assigned me a new task, such as reviewing the technical content of the bidding documents and checking the list drawings. Asking and sorting out the bidding documents requires a lot of work, especially when the professional and technical strength of the tender producers is still immature. The guidance and inspection of many important bidding technical contents, such as West Hi-Tech, Weihe River, Jichang and Aerospace, are once again on me. When all my colleagues in the bidding came home from work, I was still looking through the list of drawings under the lamp. On weekends, when everyone is resting, I am still writing an outline check and revising the first draft of everyone's tender, because I know that only by fully understanding and correctly grasping the contents of the tender documents and drawings list can we guide everyone to do a good job in bidding purposefully, so I have to pay more than others, and I also know that I will get more than everyone after paying. Facts have proved that my efforts have not been in vain, and the preparations I have made at this stage are effective.
Related articles of monthly work summary model essay of engineering project department:
★ Excellent model essay on monthly work summary of engineering department.
★ 2020 Project Department Work Summary Model Paper
★ Model essay on personal monthly work summary of the engineering department
★ Model essay on monthly work summary of construction.
★ Template for monthly summary of construction work
★ Model essay on work summary of project department
★ Selected essays on the work summary of the project department
★ Selected model essays on engineering work summary in 2020
★ Model essay 20 19 on the annual work summary of the engineering department.
★ Five copies of personal work summary of the project department.