In order to implement the spirit of Several Opinions of the Central Committee and the State Council on Promoting the Construction of a New Socialist Countryside (Zhong Fa [2006] 1No.) and the Opinions of the Provincial Party Committee and Government on Actively Promoting the Coordinated Development of Urban and Rural Areas and Accelerating the Construction of a New Socialist Countryside (Su Fa [2006] 1No.), According to the requirements of "Opinions of the State Sports General Administration on Implementing Farmers' Sports Fitness Project" and "Opinions of the Provincial Sports Bureau on Implementing Jiangsu Wancun Sports Fitness Project" (Su Qun [2006]17), combined with the actual situation of our city, we now put forward the following opinions on the construction of sports fitness facilities in the construction of new countryside in our city:
I. Guiding ideology
Implement people-oriented Scientific Outlook on Development, guide farmers to establish an advanced and healthy lifestyle and improve their fitness quality and quality of life through the construction of rural public sports facilities with government investment as the main input; Through functional compatibility, rural public sports facilities can play a fitness function and serve for culture going to the countryside and science and technology entering the village.
Second, the implementation object
All rural administrative villages and newly-built farmers' relocation communities in the city.
Three. Construction projects and standards
Each administrative village voluntarily chooses one of the following categories according to the actual situation of the village.
classify
Internal capacity
Level a
A standard cement basketball court, a fitness path, more than 2 table tennis tables (indoor), more than 40 square meters 1 chess room or more than 80 square meters indoor gym.
Class b
A standard cement basketball court, more than 2 table tennis tables (indoor),/kloc-chess and card room over 0/40 square meters or indoor gym over 80 square meters.
Specific technical data:
( 1)
calibrate
project
Website size
(meter)
Buffer size (m)
floor space
(square meters)
equipment
Cement basketball court
Length: 28
Width: 15
Edge buffer 1.5-5
Terminal buffer 1.5-2.5
560-730
Standard basketball stand
(2)
calibrate
project
Surface product
(square meters)
Chicun village
(meter)
Organ material
Indoor activity room
Ping pong table
30-60
fitness room
80-400
Each table tennis table (4×7)
1-2 table tennis table, 10 chess set, 1 set of dumbbells, and several indoor trainers.
workout path
200
According to the actual situation of the site layout.
Horizontal bar, parallel bars, Tai Chi pushers, tractors, spacewalkers, rotary trainers, riding machines, etc.
Fourth, the construction principle
1, resource principle * * *
Fitness facilities should be combined with culture, family planning, small parks and other rural public facilities to maximize the enjoyment of resources.
2, the principle of reasonable planning
The location of fitness center should be carried out together with the planning of administrative center village and relocated community, which not only has sufficient space, but also has appropriate savings; Facilitate the people and prevent disturbing the people.
3, the principle of independent choice
The construction of "Three Ones" sports facilities is guided by the government, and each village chooses independently and actively declares according to the actual situation of the village and the plan provided by the sports department.
4, the principle of capital sharing
In order to reduce the rural burden, the "Three Ones" sports facilities construction adopts the way of joint investment by the municipal government, the sports department, the town government and the village level to raise funds.
Verb (abbreviation for verb) construction and acceptance procedures
1, declare in advance in each village, confirmed by the town government after field investigation by the municipal sports department.
2, the township is responsible for the specific construction, the town construction management office to ensure the quality of on-site casting and mobile housing construction, sports department is responsible for sports technical guidance. After the completion of civil engineering, the sports department is responsible for the installation of equipment.
3. After completion, the Municipal Sports Bureau will carry out acceptance jointly with relevant departments, and then allocate incentive funds after passing the acceptance, and go through the formalities of equipment donation.
4, the whole project experience after the audit, announced to the whole society.
Specific requirements of intransitive verbs
(a) Raising awareness and strengthening leadership
The construction of "Three Ones" farmers' physical fitness facilities is a popular project with less investment, quick results and direct enjoyment by farmers in the construction of new socialist countryside, and it is a direct embodiment of the government's service to the people. Towns (districts) should earnestly strengthen leadership and set up special working groups to promote this work in an all-round way. Propaganda departments should strengthen publicity. The Agriculture Office and the Ministry of Sports have included this work in the assessment plan for villages and towns. The financial department should provide financial support. Planning and construction departments should strengthen the management of infrastructure.
(two) a clear responsibility, to replace the award.
The village and community are responsible for the foundation and construction of basketball courts, mobile homes and fitness centers (including the floors of fitness centers). Fitness equipment is donated by the sports department. Encourage qualified villages to build their own gateball courts. The municipal government will give special rewards to the construction of "Three Ones" sports facilities. In principle, each newly-built basketball court will be rewarded with 20,000-30,000 yuan. According to the actual situation of each village, the town government will subsidize as appropriate to ensure the completion.
(3) Pay attention to practical results and proceed in an orderly manner.
By the sports department in conjunction with the towns (districts) to strengthen research, find out the situation, pay attention to practical results, ensure quality, first pilot, and then fully rolled out to ensure orderly progress. It will be fully rolled out in the city from September and completed before the end of the year.
(four) open and transparent, sunshine operation.
Township fitness facilities should be publicized budget and final accounts. The equipment donated by the sports department should be purchased by the government. The regulatory authorities should intervene in advance to supervise and inspect the whole process of this work. After the completion of the project, the audit department will audit the final accounts of the project.
Attachment: 1, rural sports facilities declaration form
2, concrete basketball court project quotation sheet (for reference)
I think the third floor of Blue Ocean House is quite good ~
Coaches' Professional QualityNo. 1No. ~ Facilities and Environment
The equipment is also complete ~ the most important thing is that their member consultants have a good service attitude ~
I'm still one of them ~ I'll call you if there are any activities. I will also call you during the Spring Festival.
Enjoy the discount of old members ~ ~ Come and have a look sometime ~