1. Materials for evaluation and preparation.
1. Keep clothes and clothes tidy and wash your hands.
Step 2 put on a mask
3. The materials are complete and the arrangement is reasonable.
operation sequence/order
1. Check the name and sterilization date of the aseptic package.
2. Open a corner of the sterile bag, tie it tightly and roll it up.
3. Open other triangles to expose sterile items.
4. Pick up the treatment towel and put it in a clean treatment tray.
5. When taking the sterile holding forceps, the end of the forceps is closed.
6. When picking and placing, the end of the clamp does not touch the part above the liquid level of the container.
7. When picking, placing or using, keep the end of the clamp down.
8. Unused items in the bag are packed according to the original crease, and the date and time of opening the bag are indicated.
9. Hold the two corners on the outside of one side of the sterile towel with both hands, gently shake them off and spread them on the treatment board.
10. Hold the two corners of the upper sterile towel with both hands, and fold the upper layer into a fan shape at the far end, with the opening edge facing outwards.
1 1. Take out sterile articles from sterile bags or storage tanks, put them in a processing tray, and indicate the date and time of opening the bags.
12. flatten the upper treatment towel and cover it on the article, with the edges aligned and covered. Fold the opening up twice and the edges on both sides down once.
13, wash your hands and tidy things up.
The validity period shall not exceed 4 hours. If you don't use it immediately after paving, remember to write down the time and function of paving on the card.