* One view is that the project is still under construction and there is no unfinished business. The glass of 1 building is installed on the 25th floor, and the main body has been capped; The internal plastering of the two buildings has been completed for 29 floors, the external plastering has been completed, the outer frame of the main body has been demolished, and the main body has been capped; The east unit of the three buildings completed 27 floors of plastering, the west unit completed 28 floors of plastering, the outer wall plastering was completed, the outer frame was removed and the main body was capped; 50% of the beams and slabs on the 34th floor of the east unit of four buildings have been bonded, the masonry has been bonded to the 19 floor, the wall columns on the 34th floor of the west unit have been bonded, and the masonry has been bonded to the 19 floor.
* Another view is that due to the lack of project funds and problems in house decoration, Longxi House in Ailian, Chenzhou has been unfinished.
Therefore, whether the project is unfinished or not cannot give a definite answer.