Set of three model contracts for machine relocation
Generally, when moving, many people will ask the moving company to move because there are many things. At this time, we will sign a moving contract to safeguard our own interests. Here I would like to share with you some model contracts on machine relocation, hoping to help you.

?

?

Machine Relocation Contract-Part I Contract

Party A (demander):

Party B (supplier):

Party A and Party B have reached an agreement on the procurement and installation of this project through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant laws and regulations, in line with the principles of equality, voluntariness, fairness and good faith.

Article 1 General situation of the project

Project name:

Project location:

Contract content:

Article 2 Documents constituting a contract

1, this contract and its terms

2, the bid-winning notice

3, the book of tender and its attachments

4, the tender documents

5, national regulations, norms, industry standards and related technical documents

6. Written agreements or documents such as negotiation and meeting minutes on supply issues between both parties shall be regarded as an integral part of this contract.

Article 3 Scope and Conditions of Contract

The scope and conditions of this contract shall be consistent with the provisions of the above contract documents, and the delivery method shall be turnkey project.

Article 4 Contract Price

Party A orders (including transportation) RMB Yuan from Party B and installs RMB Yuan, totaling RMB Yuan, in words. Product name, specification, quantity, unit price, manufacturer, technical specifications and functions, list of spare parts, wearing parts, imported and domestic parts, maintenance plan, quotation of wearing parts in five to ten years, etc. See the attached table for details.

Article 5 Party B promises to Party A that it will deliver the goods, construct and complete the project on time as agreed in the contract, undertake the equipment quality problems and undertake the project quality warranty responsibility within the quality warranty period.

Article 6 Party A promises to Party B to pay the contract price within the time limit and in the way agreed in the contract.

Article 7 the contract comes into effect

Date of conclusion of the contract: year month day.

Contract signing place:

This contract shall come into effect after being signed and sealed by both parties.

Article 8 number of contract copies

This contract is made in duplicate, one for each party. Both parties agree to make the contract in quadruplicate, with each party holding two copies.

Party A: (official seal) Party B: (official seal)

Domicile: domicile:

Legal representative:

Authorized Agent: Authorized Agent:

Tel: Tel:

Bank of deposit: Bank of deposit:

Account number: Account number:

Contract terms

The first part of the purchase contract terms

1, definition

The following terms in this contract shall be interpreted as follows:

1) contract: refers to the agreement signed by the supplier and the buyer, including all annexes and appendices and all documents mentioned in the above documents that constitute the contract.

2) Contract price: refers to the price that Party A should pay to Party B after Party B correctly performs its contractual obligations according to the contract.

3) Equipment: refers to all equipment, machinery, instruments, spare parts, tools or other obligations that Party B shall provide to Party A according to this contract.

4) Project location:

5) Days: refers to calendar days.

2. Source

The country of origin mentioned in this article refers to the place of production of equipment, and products that have been manufactured or processed or are essentially assembled from parts can be called equipment.

3, technical specifications

3. 1. The technical specifications of the delivered equipment shall meet the technical specifications and requirements specified in the tender documents.

3.2 Unless otherwise specified in the technical requirements, the unit of measurement shall be metric.

4. Patent right

Party B shall ensure that when Party A uses the equipment or any part thereof, it will not be sued by a third party for infringing its patent right, trademark right or industrial design right.

5. Ships

5. 1. Unless otherwise stipulated in the contract, all the equipment provided by Party B shall be packed according to standard protective measures, which shall be suitable for long-distance transportation, moisture-proof, shock-proof, rust-proof and rough handling, so as to ensure that the goods arrive at the designated place safely and without damage.

5.2. Detailed packing list and quality certificate shall be attached to each packing box.

5.3, packaging marks

5.3. 1. Party B shall make the following marks in striking Chinese with indelible paint on the four adjacent faces of each packing box:

(a) the consignee; (b) the contract number; (c) the destination; (d) the name of the goods;

(e) case number; Gross weight/net weight; (g) size {length? Wide? Height, in centimeters or centimeters;

Machine Relocation Contract II Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _

In order to use the equipment relocation expenses reasonably and complete the equipment relocation work safely and smoothly, Party A and Party B have reached the following agreement through careful negotiation.

1. Party A agrees in principle to deliver the finished product warehouse, drying drum, dosing machine, powder can and other equipment (* * * * _ _ _ _ _ _ _ _ _ _) to Party B for transportation and relocation. After Party B receives the notice from Party A, the vehicles to be hoisted and transported shall enter the place designated by Party A within 3 days, and all equipment shall be hoisted and unloaded by Party B after Party B's crane enters the site.

2. Party A intends to package the use fees of cranes and transport vehicles for the above equipment to Party B in one lump sum.

3. In order to urge Party B to actively cooperate and pull the equipment away from the construction site as soon as possible, both parties agree that Party A will pay Party B a certain coordination fee, and no matter how difficult Party B encounters and how long it lasts, Party B must make every effort to load the equipment as soon as possible and transport the goods it carries out of the dismantling site. Based on the above additional responsibilities undertaken by Party B, Party A pays Party B the coordination fee, totaling * * * _ _ _ _ _ _ _ (in words: _ _ _ _ _ _ _ _). This fee is guaranteed by Party B. ..

4. Party B shall ensure that the goods are transported to Party A's unloading site within _ _ _ _ _ _ days after being loaded and transported out of the dismantling site. Due to unexpected factors such as climate, it may be postponed as appropriate.

5. Party A has contributed RMB _ _ _ _ _ _ _ _ _ _ _ _.

6. Party A shall not bear the accommodation fee of Party B's driver and the maintenance fee of Party B's vehicle.

7. Party A provides the loading list, and Party B pulls the goods according to the loading list. Party B must select suitable cranes, trolleys and trucks, and transport them according to the route designated by Party A, so as to ensure the safety of the equipment during hoisting, unloading and transportation. If Party B fails to follow the route and speed specified by Party A and causes equipment damage, Party A shall estimate the actual damage and Party B shall make compensation.

8. Fees and payments for cranes, scooters and trucks

(1) The total expenses for personnel and transportation borne by Party B are _ _ _ _ _ _ _ (in words: _ _ _ _ _ _ _ _).

(2) Payment method: After all trucks and trucks of Party B enter the site, Party A will pay RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(3) Other notes: After Party B pulls Party A's equipment to the destination and unloads it safely, the receiving personnel of Party A will issue the certificate of transportation completion as the basis for final settlement.

9. For matters not covered in this agreement, Party A and Party B shall negotiate a supplementary agreement separately. The supplementary agreement has the same effect as this agreement. 10. This agreement is made in quadruplicate, with each party holding two copies. It will take effect automatically from the date of signature and seal by both parties, and the contract will become invalid after payment.

Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ Signing place: _ _ _ _ _ _

Machine Relocation Contract III Party A:

Party B:

Party A entrusts Party B to undertake (in the workshop) 160T punch (18) 125T punch (7) cleaning lines (2 lines), and Party B is responsible for dragging them in place. On the basis of friendly consultation and mutual benefit, the two sides reached the following agreement:

1. The relocation projects undertaken by Party B this time include:

More than (1) pieces of equipment are removed from the workshop;

(2) The water, electricity and gas of the equipment shall be dismantled by Party A. ..

2. Time limit for a project:

Completed from year month day to year month day. If the specific date is changed, the written notice of Party A shall prevail. If the normal construction conditions are not met due to Party A's reasons, Party B will not be responsible for the project delay.

3. Project cost:

The total project cost is: ten thousand yuan only.

Settlement method:

4. The equipment shall be paid in one lump sum after relocation.

5. Alteration and dissolution:

5. 1 When Party A needs to change the contract, it must notify Party B in writing, and the change will take effect after both parties negotiate and sign a revised supplementary contract separately.

5.2 If Party A fails to perform this contract in accordance with relevant Weifang laws and regulations or this contract, the responsible party may terminate this contract only after compensating Party B for the actual losses. ..

6. Agreed matters:

6. 1 In order to facilitate organization and coordination, Party A must send a manager to lead the team at the site, and relevant professionals will move it. The construction unit is fully responsible for this work. All personnel of Party B must be familiar with the contents, safety measures, construction scheme and progress of this project, abide by the factory rules and regulations of Party A and obey the unified command.

Lifting equipment must be strictly inspected before use, and can only be used after it is confirmed to be qualified. Before lifting the equipment, check whether the ropes are complete, and after lifting off the ground, check again and confirm that there is no abnormality before lifting. During the relocation, each equipment shall be inspected together with Party A's representative. During the relocation of equipment, Party A and Party B are jointly responsible for the custody of the equipment.

6.2 In the process of equipment relocation and installation, Party A is responsible for providing storage places for construction machinery, tools and equipment free of charge (the storage responsibility shall be borne by Party B), so as to ensure that the work area and access are barrier-free.

6.3 In the process of relocation, Party B shall actively cooperate with Party A to complete the additional projects other than the relocation projects undertaken by Party B, and the cost of the additional projects shall be calculated separately by Party A according to the actual quantities.

6.4 Party B must ensure that there is a special person responsible for the equipment from disassembly to loading, and Party B's personnel must strictly abide by the construction safety, and Party B shall be responsible for the accidents caused by Party B during the construction.

6.5 Party A shall arrange relevant personnel to supervise the construction quality on site and be responsible for coordinating the on-site problems in the construction. The relocation project is contracted by Party B, and Party B is fully responsible for the project quality and construction period. Party B shall ensure the safety of Party A's equipment. If an accident occurs at work due to Party B's responsibility, Party B shall be responsible for making up for the loss or compensating for the direct loss according to the equipment parts.

7. Settlement of contract disputes:

If justice occurs due to the contract, agreement or other business between the two parties, the two parties shall settle it through friendly negotiation. If negotiation fails, a lawsuit shall be brought to the people's court in accordance with the Contract Law.

8. Effective conditions and number of copies of the contract: This contract is made in quadruplicate, with the same legal effect, and each party holds two copies.

Party A (seal): Party B (seal):

Signature: signature:

Date: Date:

?