Summary of Work of Architectural Engineering Department 20 19
No matter in which company, the employees in the construction department are absolutely busy and hard, so what are the summaries of the whole construction department in this year? The following is the Work Summary of Department of Architectural Engineering 20 19 compiled by me for your reference only. Welcome to reading.

Summary of Work of Construction Department 20 19 (1) As time goes by, the New Year bell of 20 19 is about to ring. On this occasion, under the correct guidance of xx Co., Ltd. and the correct leadership of the real estate development company, the first phase of the residential area developed by xx Project Department has a total construction area of 2 million square meters. This department is responsible for the *** 10 residential building in bid A of xx community, in which: the small high-rise X is: x 12 floor, (10, 1x),10 floor, and the six high-rise buildings are:. 1, No.2 shop, covering an area of xxm2, with engineering headquarters xxm2. With the concerted efforts of all the staff in Qi Xin and the efforts of the cadres and workers of the construction unit, the project department has completed the acceptance of the main structure of the small high-rise building and entered the decoration stage. The main structure of the high-rise building 1 1 x has been capped, the three-story structure has been 2x, the X building structure has been 22, and the X building structure has been 13. 12 structural building completed 1x floor. On the basis of reviewing the past, summing up experience, finding out shortcomings, enriching ourselves and making the enterprise have the stamina for rapid development, the past work is summarized as follows:

First, set goals, observe rules and discipline, and do a good job in organizational construction.

1. After the establishment of the project department, according to the characteristics and scale of the project, the company decided that General Manager Zhu would be the project commander of the project department and take charge of the overall work of the project department. Under the direct leadership of the project manager, start with the organizational structure and do a good job in organizational construction. The organizational structure of the project department adopts linear organizational structure, that is, according to the engineering characteristics and plane distribution, three regions are divided and three project departments are established to be responsible for the project construction management within the jurisdiction of this region.

2. Under the leadership of Project Manager Jiang, Project I is responsible for setting work objectives, among which: the safety objective is: zero death. The progress target is: the small high-rise building will be completed on October 365 and 438+0, and the high-rise building will be completed and put into use on October 30. The quality goal is to complete all the construction contents according to the standard requirements of the municipal high-quality project.

3. After the goal is determined, in order to achieve the above-mentioned work goal, we have formulated various feasible rules and regulations according to the executive headquarters, such as: post responsibilities, management system of regular engineering meetings, design disclosure and joint review system, construction organization design and construction scheme review system, engineering quality and acceptance management system, engineering change management system, document management system, safety and so on. Everything we do has rules to follow, evidence to check, supervision and governance, and our actions are based on constraints and governance, which reduces randomness and increases sense of responsibility.

Second, do a good job of pre-control

1, the construction period is controlled in advance:

After the time limit for a project is determined, the project department requires the construction unit of Changzhou No.1 Construction Company to make a time limit plan, arrange the time limit for a project reasonably, and report it to the supervision department and the project headquarters for review. Construction can only be started after approval. On this issue, the establishment of the project by the construction unit, the review by the supervision department and the project team department are not very serious, and they think it is unnecessary. After that, the headquarters, the project department and the supervision meeting held several meetings to explain that the construction progress plan is very important, which is of great significance to the control of the construction period and makes everyone more familiar with it. Although the on-site construction scheme is not satisfactory, our department is among the best in the three blocks and has played a role in supervision.

2, quality control in advance:

2. 1 When the construction unit enters the site, the project department strictly controls the qualifications of the personnel entering the site, and requires the management personnel of the construction unit to prepare the duty list and attach the contact information. In the process of supervision, the person in charge of the building number keeps in touch and implements the rectification measures, which has achieved certain results in promoting the progress, quality, safety and civilized construction of the site project.

2.2 After the quality target is determined, the project department requires the construction unit to carefully write the construction organization design and construction scheme before the project starts. At the same time, the key points of quality control should be trained and studied by the person in charge of the building number to achieve the purpose of supervising the application.

2.3 Before the project construction, all professional engineers are required to be familiar with the construction drawings carefully, so as to correctly supervise and guide the construction. At the same time, on this basis, organize design units, supervision units and construction units to carry out the blue prints.the design in blocks, and carefully record and sort out the blue prints.the design records according to the requirements of the blue prints.the design system as part of the design documents, and carry out the construction according to the recorded contents.

2.4 For common quality defects in construction, the construction unit shall prepare the construction scheme, and the project department shall cooperate with the planning department to carefully examine and sign it, write down the key points of construction technology and details of nodes, and unify the practice, and distribute them to the supervision unit and the construction unit, such as wall masonry, external wall tiles, internal wall insulation, roof waterproofing, door and window installation, water and electricity installation, etc. , and achieved good results.

Third, control in the process.

1, foundation engineering:

1.65438+

Summary of Work of Architectural Engineering Department 20 19 (II) Looking back on the work of the department in the past year, first of all, I would like to thank the leaders of the company for their concern and support, all departments of the company for their coordination and help, and colleagues in the engineering department for their hard work and professionalism, so that the engineering department can continue to grow and develop. My work summary will be divided into three parts, one is my work achievements in 20 19 years, the other is my work goal in 2020, and the third is my work gains and losses and rectification.

I. 20 19 Project Performance Report

1, XXXXXXXX project: the construction of ground source heat pump in xxxxxXXX project starts from X, 20 19, and ends at X, 20 19, completing X vertical buried pipe,1x0000m horizontal pipe and XXX uplift pile, with an output value of XX million yuan; 2065438+X, in 2009, the construction permit was handled on X, and the commencement report was submitted on X, and the basement was completely completed by the end of the year, and the main building area was basically completed to 0.000. The overall construction quality is excellent, with the output value of xx million yuan, plus the previous earthwork construction of xx million yuan, the foundation pit slope support of xx million yuan, and the construction output value of xx million yuan.

On April 38, 2065+X, 2009, after many discussions, the design scheme of one-pole double-push-pull ice curtain wall was finally determined. On 22nd, the observation meeting of "Building High-quality Safety Project and Creating Advanced Project Team" in X and xx Districts was successfully held, which was well received by the leaders of the Standing Committee of xx District Committee, deputy district heads and so on, and has been recommended to the Organization Department of the Municipal Party Committee.

2. 2.xxxxxxx Project: It entered the site on October X, 2065438+2009/KLOC-0, overcoming the unfavorable factors such as rainy season, imperfect construction facilities, incomplete construction drawings, and inadequate personnel and machinery, organizing the construction, carrying out the work, and completely completing the earthwork (including a large amount of silt) and foundation replacement construction, with an output value of xxm3 30,000 yuan. Deep foundation pit slope support construction, the output value of xx million yuan. Complete basement construction including civil air defense works, complete x% basement roof construction, and complete X single-family business building to the second floor. The output value exceeds xx yuan. On the 2nd of X, after many parties' coordination, we applied for the construction project planning permit, and on the 2nd of X, 12, xxxxxxx completed the final fine decoration scheme. X month 1x day, xxxxxxx completes the final construction drawing. 1October 2 1 day to obtain the bid-winning notice from the construction unit and supervision unit.

3.xx project: I began to participate in the "two reforms" project of xx Road in xx District on October 20 19/Kloc-0, from the initial land bidding, auction and hanging, design institute screening, environmental protection approval to planning scheme audit, especially the plot ratio audit of 1#-x# plot, which increased from the original calculation of 2.32 to 2.xx. 1# plot completed scheme change, and 2#-x# plot completed construction drawing design. 2065438+X, 2009 10, with the cancellation of the original construction unit xx, land transfer, etc. , the engineering department received a parcel of land from the xx district government. Temporary electricity and water use procedures have been basically completed, and the construction organization will be carried out directly after the high-voltage line of xx Road is buried.

4. Other projects: quality supervision and acceptance will be conducted on October 20th, xxxxxxx19th. Complete the construction of thermal heating channel, fence and protective cover in xx workshop before the end of the year. There are also some finishing work such as maintenance coordination, heat transfer and road hardening of residential buildings.

5, several projects at the same time, nearly 20 square meters of construction tasks, with the strong support of company leaders, the engineering department focuses on the following work, improve the management level:

(1) The early stage of the project is orderly:

Under the leadership of xxxxxxx, the engineering department is responsible for the preliminary work. Engineer xxx, the early Commissioner of the engineering department, better coordinated the administrative departments at all levels, better operated xxxxxXXX and xxxxxXXX, and coordinated the early stage of XXXXXXXX project, which laid a good foundation for the follow-up construction coordination between Deputy Manager XX and Engineer XXX.

Xxxxxxx project is a typical park construction, lacking relevant procedures, while drawing and constructing. In this case, the high-tech zone project department made great efforts to intervene and coordinate the municipal civil air defense office, high-tech zone planning, high-tech zone quality supervision Committee and other departments in advance, and did a lot of work for the smooth construction of the project.

(2) The project quality strives for perfection:

The engineering department actively summed up the experience from the previous construction, and specially discussed the project gain and loss experience on 20 19 X and 1x to guide the future work. Conscientiously implement the policy of "quality first", the Ministry always focuses on quality control, controls the whole process of the project, and focuses on urging contractors to establish and improve quality management and quality assurance systems. Many new technologies have been adopted in xxxxxxx project, and good quality control results have been achieved for reinforced concrete structure, 2.2m mass concrete floor slab and complicated concrete label.

At the same time, the engineering department implements "four strict checks". First, the technical review, construction drawing review and design change will be strictly checked. Second, the raw materials will be strictly checked, and the PE pipes, steel bars and steel columns will be inspected and rechecked, so as to resolutely put an end to the processing of steel bars in different places and the "slimming" of steel bars. The third is to strictly control on-site management, insist on inspection and strengthen process control, and strengthen control before and during the event. Xxx engineer and xxx engineer are used to on-site inspection at least twice a day, and prevent problems before they happen together with the supervisor. The fourth is to strictly control the safe and civilized construction. Strictly implement the management system of safe and civilized construction, organize special inspections of safe and civilized construction, and give corresponding economic penalties according to regulations.

In order to achieve the purpose of quality control and embody the means of economic control, the engineering department has improved the reward and punishment system for engineering quality, the entry system for raw materials and equipment, the safety inspection process, the reward and punishment system, the concrete pouring procedure and punishment, etc. Restrict and improve quality management.

(3) Every minute counts:

According to the company's series of objectives and construction tasks, the engineering department highlights the key work, carefully arranges the construction period, actively implements all the work, and speeds up the project progress. Strictly implement the master control plan, construction master plan, monthly plan and weekly plan for precise control. In view of the problems such as improper construction organization and slow construction progress of the comprehensive building, the Circular Letter on the Slow Construction Progress of XXXXXXXX Project was issued on X/20 19, and the Supervision Letter on Accelerating the Construction Progress of XXXXXXXXX Project was issued again on X 12, with special emphasis on better mobilizing all construction units on the premise that funds are not in place and the progress is guaranteed.

(4) The project investment is rigorous and meticulous:

Development enterprises attach importance to investment control, reduce costs and save costs. As the front line of project management, the engineering department strictly controls the project approval price and on-site visa audit. Deputy manager Xxx is responsible for foundation pit drainage visa for rainy season and rainy season respectively. In order to coordinate the progress of the project, the basement was suspended to speed up the construction of the main building, and a shutdown order was issued. Economic claims exceeding 30,000 yuan were not recognized. Firmly implement the first consultation in the project approval, and the final approval shall be subject to the price attached to the comparative cost consultation. C20 steel bar lap joint is changed to straight thread connection, saving 23 tons of steel bar and cost 1 10,000 yuan. The quality of finished basement concrete is good, which can save hundreds of thousands of costs. Engineer Liu Shi proposed that flexible metal pipes be used for electrical piping, which slightly increased the cost, but saved the construction time and time. The completion of the above work has well guaranteed the investment control target.

(5) The engineering design is timely and smooth:

The engineering department always keeps smooth communication with the design institute to ensure that design changes and engineering technical negotiations are issued in the first time to avoid affecting construction and engineering claims. Engineer xxx contacted xxxxxxx for many times and discussed the drawings, redistributed the tube well to increase the size of the high-pressure tube well, and avoided the exposed installation of equipment and pipelines.

In view of the problems left by XXXXXXXX design that affect the construction, XXXXXXXX investigated and dealt with many problems when examining the drawings, and specially sent a document to the design institute for timely and rapid improvement of the design. Aiming at the problem of deepening the design of steel structure, the engineering department made a special trip to Beijing to hold a tripartite meeting to solve the remaining problems and speed up the design progress.

(6) The engineering system plays the role of connecting the past with the future:

The Engineering Department has successively established and improved the discipline of regular meetings of the Engineering Department, the daily work record and monthly summary system of the Engineering Department, the budget examination and approval of the Engineering Department to strengthen budget management, the atlas and program management regulations of the Engineering Department to implement account book management, the regulations of strict contract negotiation and countersigning procedures to strengthen contract management, and the regulations of Party A's subcontractors to establish project management and implement access system. Emphasis is placed on the internal management system, such as Saturday and Sunday duty system, leave system, responsibility system for issuing documents and countersigning, drawing review and countersigning system for design changes, and so on. 20xx year x month x day, xxxxxxx and XXXXXXXX project department responsibilities completed. On September 30th, 20xx, the monthly project briefing was officially held, and on June 20th 10, all managers of xxxxxxx project department began to implement quantitative scoring management. 20xx165438+1October 1x, and complete the application for "Engineering Inspection Team". 20xx65438+On February X, a discussion meeting was held from the deputy manager to the vice president of engineering.

(7) the project site in an orderly way:

At the same time, the company advocates and carries out the "five-routine management", and the engineering department strengthens the management and maintenance of office buildings and engineering construction sites. The observation activity of "Building High-quality Safety Project Team" in xxxxxxx District is the best embodiment that the engineering department attaches importance to safety and implements five routine management. Engineers are United and conscientious, especially for the mass concrete pouring of 22x0m3 in Rong Da Century Building for two days and one night, and three people are on duty in turn to complete the on-site construction control. In order to speed up the construction quality and progress, xxxxxxx takes turns to live on duty at the construction site and solve problems at any time.

(8) The project has achieved remarkable results:

Build the engineering department into a learning department to improve the project management level for project management. Up to now, there are professional engineers 1x in the engineering department, including 2 graduate students, all of whom have bachelor degree or above. There are 3 senior engineers and 3 intermediate engineers. There are 3 registered first-and second-class construction engineers and 2 registered supervision engineers. Lay a good foundation for talent reserve and management level improvement.

The completion of the above work ensures the smooth development of all the work of 20 19. These jobs can not be achieved without the demonstration of company leaders, the trust and help of company leaders, and the contribution of engineers, who firmly assume the responsibilities and obligations as xxx.

Two. Work target for 2020

Project 1, xx: The capping plan for the main office building is 20xx165438+1October 30th, and the hotel is partially completed to 2x floors. Ensure the "xx standardized construction site", and complete the "new technology application observation meeting" with the quality supervision station in xx District when the main body of the scheme is constructed to the x-x floor.

2.xx project: xx single-family commercial building is planned to be put into use in 20xx, and the main building is planned to be completed by the end of 20xx, striving for "xx standardized construction site".

3.xx project: xx project is a government project to solve the relocation, which is affected by the underground project of xx high-voltage line and will be implemented after the completion of the Electric Power Bureau. According to the news from the electric power department, construction will start in 20xx 10, and it is planned to complete the single acceptance within 1 year to ensure "xx standardized construction site".

Summary of the work of the Department of Architectural Engineering 20 19 (3) Time flies. Unconsciously, a hopeful year is coming, and the snow is white and auspicious. In the past year, we had fruitful joy, but also difficulties in tackling difficulties with colleagues; We have doubts about waiting and seeing melancholy, and we also have moments when we firmly believe that the future is bright ... In this way, we walked steadily through Xia Dong during the Spring and Autumn Period of 20 19.

It can be said that 20 19 is a crucial year for the company to promote reform, expand the market and sustain development, and it is also a year for our company to take the most solid step towards the group company. Looking back on the past year, I felt a lot, gained a lot, strengthened my belief, and my thinking was particularly clear. Now the work summary of the engineering department in 20 19 and the work ideas and plans for next year will be awarded to the company.

I. Work in the past year

1. Work hard and complete your task successfully.

1) At the beginning of this year, with the care and help of the company leaders, the engineering department started the construction of the late installation and fine decoration project of xx Club. Because our company used to focus on civil engineering, managers were not proficient in decoration engineering. However, we are not discouraged, have no inferiority complex, learn with an open mind, ask for advice in many ways, and overcome many difficulties. After nearly eight months' unremitting efforts, xx Club finally opened grandly before the 11th National Congress. The decoration area is nearly 3XX square, including ceiling 22XX square, wooden floor xXX square, wallpaper 1xXX square, water supply and drainage, electrical and central air conditioning installation and debugging. At the same time, the decoration work of the second phase of xx Club is being carried out in an orderly manner.

2) After the delivery of the house at No.23, Phase II of XX New World in 2)20XX, the civil air defense garage project was not completely completed due to various reasons. At the beginning of this year, the engineering department immediately organized manpower and material resources to pay close attention to the construction of its remaining projects. After one month's efforts, the ground works of 1xXX square, ten watersheds, four intercepting ditches and two ramps were completed. At the same time, the settlement data of XX New World Phase I 13 Building, 1x Building, Phase II Building No.23 and civil air defense garage are collected and sorted out.

3)XX Street Residential Community Project of XX Local Taxation Bureau, with a total construction area of 2xxXX square, is a crucial year. In the absence of technicians, the Engineering Department dispatched XX engineers to cooperate with Wu Jingli's work in time, and insisted on cycling between the two construction sites every day. Carefully organize the construction and work carefully. Completed the installation of water, electricity, heating, wood fire doors and fire rolling gates, and completed the dismantling of the feeding winch and the plugging of the feeding port. At the same time, the basement floor is 3xXX square, the interior wall coating is 3xXX square and the exterior wall coating is about 9XX square. Complete completion data and complete settlement data. It laid a solid foundation for the completion handover and completion settlement of the project.

4)XX school village office building project, the main body ended last year without any progress. In order for XX school to settle in on time after this summer vacation, the engineering department quickly organized manpower and material resources to carry out the construction of powder engineering inside and outside the teaching building and roof insulation and waterproof engineering. After completion, the indoor partition, decoration and installation works will be fully constructed in time. After three months' hard work, * * * has completed xXX square with internal and external powder, 3XX square with light partition wall 1xXX square, 3XX square with floor tile, xxxxx square with roof insulation and waterproof 1x xx square, xxxxx square with interior wall coating, 32XX square with exterior wall coating and 3xx square with hardened parking lot, including xXX square with basketball court.

5) The commercial mixing station in Economic Development Zone is a new project of the company, which is prepared for danger in times of peace and focuses on the future. In order to do a good job in the basic work of commercial mixed station, the engineering department has made many field visits, carefully studied the advantages and disadvantages of Henderson Commercial Mixed Station, and sought the opinions of professionals. After several moves, it has broken ground.

2. Care about the company, earnestly perform their duties, and strengthen the project management of the branch.

Whether the subcontracted project is done well is closely related to the company, which not only directly affects the economic interests of the company, but also affects the overall image of the company. Since the re-establishment of the engineering department, we have strengthened the horizontal management of the branch according to the instructions of the company leaders. In order to realize planned, organized, regular and irregular inspection and supervision, the engineering department has held special meetings for many times to study plans and deploy tasks. Require inspectors to: carefully check and record; Strict supervision and notification. Put forward rectification opinions and implement the rectification effect. In view of the project with major hidden dangers in engineering quality, safety and civilized production, serious criticism is put forward and rectification is made within a time limit. For more than half a year, the engineering department has paid attention to xx (1#-X 1# building and three office buildings), xx(2#, 3# and x# building) and xx New World Phase III (1 #, 2#, x# and10). Every inspection found that there was a great improvement compared with the last time, and the results were remarkable. There were no quality and safety accidents in buildings with an area of nearly x00,000 square meters. At the same time, it also helps and improves the technical level of the engineering manager to varying degrees. Through this activity, we not only exercised our team, but also enhanced the company image.

3, cooperate with other departments to do a good job.

In 20 19, in order to cooperate with the company to make the investment budget of XX industrial park, the engineering department sent people to the industrial park dozens of times to personally measure and draw according to the facts. After more than two months, 1x warehouse, 1x accommodation and office building have been surveyed.

The engineering department has always taken it as its responsibility to collect settlement data and cooperate with the sales department to do a good job in project settlement. In 20XX, the engineering department completed the settlement data of buildings 13# and 1x# in XX New World Phase I, 23# in Phase II and the civil air defense garage, as well as the settlement data of XX Street residential area. At the same time, cooperate with subcontractors to complete sewage and rainwater settlement, road engineering, 1x# building and 1x# building and generator room engineering of XX New World Phase II.

Assist the office in the relocation of the company. The engineering department sent people to pack office supplies, load cars and escort them, and actively carry valuable and bulky items, which made due efforts for the smooth relocation of the company on schedule and the construction of the company's staff canteen.

Second, experience and gains

1. Only by putting yourself in a correct position and trying to be familiar with your work can you make a difference.

2, take the initiative to integrate into the collective, handle all aspects of the relationship, in order to do the work handy.

3, focusing on the interests of the company, regardless of the gains and losses of the interests of departments and individuals, can have greater gains.

X only by learning with an open mind and constantly pursuing progress can we keep up with the pace of the company's development.

Third, the existing problems

1, quality control means need to be improved.

Quality is the foundation of company development. In the past year, there were still many shortcomings in quality control. The idea of quality control management is not clear, the key points are not prominent, the quality control means are single, and the whole process control system has not been formed. Progress is often emphasized, but the hierarchy of construction procedures is ignored. The construction scheme often changes, resulting in a prominent contradiction between progress and quality.

2. Safe and civilized production is mostly a mere formality.

Safe and civilized construction is a mirror of enterprises. In the past year, safety and civilized management has been greatly improved compared with the past, which has been mentioned in the work schedule of the engineering department and has become the top priority of the engineering department. However, there is no clear goal, especially for subcontractors, and there is no effective coercive force and terrible binding force.

3. Not paying enough attention to contract management.

In the past year, insufficient attention was paid to contract management, which was manifested in unclear contract disclosure, unclear understanding of contract contents by project managers, and even failure to see the contracts of the projects they managed. Many projects don't have contracts at all, so problems can't be dealt with timely and effectively according to the contracts.

Four. Work ideas and work plans for next year

20 19 realized their own shortcomings. In 2020, the engineering department will face more arduous tasks: the third phase of the xx New World Project, the xx site, the xx residential area and the xx school project will be handed over in an all-round way, the company's Sanmenxia Weichuang base project, the second phase renovation of the XX Club, and the construction of the commercial mixing station in Zhengzhou Economic Development Zone will be in full swing. The tasks of quality management and schedule management are very heavy, and safe and civilized production is facing a new step. It is more difficult to settle the project in time and collect the project payment. This requires us; Plan ahead, be strict with the requirements, resolutely implement the company's decision, and sum up the experience and shortcomings of the engineering department in time. In order to make the management of the engineering department more institutionalized, standardized and rationalized, we need to redouble our efforts!

Work idea: take the branch management objectives as the guidance, focus on the project management of the head office, and strengthen the functional construction of the engineering department as the guarantee to ensure the realization of the company's annual goals.

1. Continue to strengthen the management of branches. Adhere to patrol once a week, shift the focus of work from safety and civilized management to project quality and progress management, timely sort out completion data, and do a good job in project filing. To check step by step, find out the situation, recorded in the file, accomplish know fairly well, make the one-time qualified completion rate reach 1XX%, and help supervise the project payment.

2. The company's projects always come first. The interests of the company are related to the rights and interests of every manager in the engineering department, and the company's projects should be taken as the core and implemented as the top priority. Every project manager is required to work as a master, work hard, and work together with Qi Xin to make the Engineering Department an invincible vanguard and sharp knife class!

3, the society is progressing, the company is developing, and the function construction of the engineering manager can not be ignored. In the new year, we should carry out three professional knowledge trainings and organize two excellent enterprise visits, so that employees must know how to carry out their work, how to regulate their behavior and how to improve their work efficiency. In 20 19, the engineering department should regularly inspect each project, organize the review of inspection results, and reward and punish the project manager. Process inspection once a week and appraisal inspection once a month. To create a good atmosphere of unity and harmony, it is better than learning to be excellent and being an official, striving for the first place, and being honored first and then humiliated.

20 19 is a crucial year for the engineering department. There are many projects, scattered, tight construction period, heavy tasks, large handover area and few management personnel. There is light in difficulties, and joy in hardships! This requires us to go all out, implement quickly, enhance ideological awareness, improve work efficiency, ensure the smooth realization of the annual goal, and work hard for the company to move towards collectivization!