Red brick 120 masonry method can be roughly divided into four kinds, namely mortar masonry method, full-mouth ash method, 238 1 method and trinity method. Among them, extrusion method and trinity method are commonly used. The former can build many bricks continuously, and the construction speed is fast. The latter is a brick, a shovel of ash, and then soft pressure can scrape off the mortar, which not only has good adhesion, but also has full mortar joints.
Wet red brick
What should we pay attention to when building red brick walls? 1. soak red bricks in advance. First of all, before laying the red brick, soak the red brick in water in advance, so that the brick can absorb enough water and have better adhesion with cement mortar in the later stage, which improves the safety and stability of the wall.
Keep it horizontal and vertical.
What should we pay attention to when building red brick walls? 2, the wall should be kept horizontal and vertical red brick masonry, according to the drawings, masonry, ensure the wall horizontal and vertical, otherwise it will affect the later construction, but also affect the appearance.
Use up cement mortar in time.
What should we pay attention to when building red brick walls? 3. Cement mortar should be used up in time. At present, most self-built houses are built with cement mortar, but attention should be paid to the timeliness of cement mortar, which will dry hard after a long time and cannot be used. Thereby affecting the quality of the house. Don't mix hardened cement mortar with water in order to save cost, otherwise there will be potential safety hazards.
Ultimate height of masonry wall
What should we pay attention to when building red brick walls? 4. The height of red brick masonry wall is limited. Red brick masonry has a large amount of work and many construction days. However, when laying red bricks, it is not recommended to build too high a day, usually not higher than1.8m, otherwise the stability of the wall will be affected. If it is rainy, the wall should not be higher than 1.2m every day. In addition, cover the wall with a straw curtain every time to avoid getting wet by the rain.