Current location - Health Preservation Learning Network - Health preserving recipes - To open a health center in Shenzhen, you need a public safety and health permit and a fire safety permit. If so, do you need a health assessment report?
To open a health center in Shenzhen, you need a public safety and health permit and a fire safety permit. If so, do you need a health assessment report?
Yes, you should be talking about the hygiene license in public places, right? Health examination and evaluation reports are generally made in CDC or a third-party testing institution with corresponding qualifications. The main testing items are indoor air and public goods. If there is a central air conditioner, a sanitary inspection report of the central air conditioner is required.

Materials required for applying for health permit

(1) health permit application form (1 original, stamped with the applicant's signature)

(2) Health inspection report (including evaluation) issued by technical professional institutions with corresponding qualifications. If the central air-conditioning ventilation system is used, the sanitary inspection report (including evaluation) of the central air-conditioning ventilation system should also be provided (1 copy, stamped with the applicant's signature and original) (it can be corrected within 2 months from the date of obtaining the sanitary license, but a written commitment should be made).

(3) Health management system in public places (1 original, stamped with the applicant's signature)

(4) Before applying for a new office, you should first obtain the completion acceptance certificate of the construction project from the health administrative department.

Fire safety inspection

Required materials

(1) fire safety inspection declaration form [original (received)]

(2) Copy of business license or notice of pre-approval of enterprise name issued by the administrative department for industry and commerce [Xerox 1]

(3) Copies of legal documents obtained in accordance with the law for fire control acceptance of construction projects or fire control record for completion [Xerox 1]

(4) Fire safety system, fire fighting and emergency evacuation plan, site layout [other]

(5) Records of pre-job fire safety education and training for employees and copies of professional qualification certificates for specific jobs in the fire protection industry obtained by operators of automatic fire protection systems.

Specifically, you can consult the health supervision offices in various districts and the fire supervision and management brigade of the Public Security Bureau.