Current location - Health Preservation Learning Network - Health preserving recipes - Which construction period is faster, lime-fly ash macadam or water stabilization?
Which construction period is faster, lime-fly ash macadam or water stabilization?
Water stabilization is completed within 2 hours, and lime-fly ash macadam is completed within 24 hours, so water stabilization is faster. Lime-fly ash macadam, also known as lime-fly ash stabilized macadam, is a semi-rigid structure with strength, which is made of inorganic binder lime, fly ash and graded macadam mixed with a certain amount of water, rolled and maintained.