Expressway was completed and opened to traffic.
On 202 1 August1day, Tengchong Airport expressway was officially completed and opened to traffic (trial operation).
This project is a fast-track connecting Tengchong City and Tengchong Airport, starting from Hu Fei Park in Tengchong City. Hu Fei Park has saved valuable time for the general public and tourists, and has also been strengthened in safety margin, traffic environment, overall road conditions, vision and other aspects. In order to effectively enhance the image of the airport as the first window of local opening to the outside world, it is actively integrated into Tengchong's strategy of building a world cultural tourism city.
Airport Phase II Reconstruction and Expansion
Recently, Yunnan Provincial Development and Reform Commission approved the feasibility study report and adjustment of Tengchong Airport Phase II reconstruction and expansion project (T 1 international terminal reconstruction part). The construction period of the project is about 4 years. Upon completion, it is predicted that the passenger throughput, cargo and mail throughput and aircraft take-off and landing will be 365,438+10,000 tons, 6,200 tons and 259 1 1 respectively. At the same time, after the completion of the project, Tengchong Airport will become another important airport in southwest China and one of the three main airports in west Yunnan, providing better services for South Asia, Southeast Asia and other countries.
Darrouy Railway
On July 30th, 20021year, a new breakthrough was made in the construction of Gaoligongshan Tunnel on Dali-Ruian Railway. The smooth connection between the inclined shaft and the construction end of the 18th Bureau at the entrance of the tunnel has solved the problem of reverse slope drainage of the super-long inclined shaft of China Railway, and laid a solid foundation for the early opening of the "last section" of the China-Myanmar international passage on the west line of the "Belt and Road" Trans-Asian Railway in China.
After the completion of the Da-Rui Railway, the Kunming-Ruili section and the mangshi-Tengchong section will be of great significance for accelerating the leap-forward development of border ethnic areas, promoting the interconnection between China and Southeast Asian and South Asian countries, creating the "Belt and Road" and reshaping the "Southern Silk Road".
Border railway
Border Railway, also known as "Yunnan-Guangxi Border Railway", is located in Yunnan and Guangxi. It is a national railway I-class single-track electrified general-speed railway connecting Fangchenggang City in Guangxi Zhuang Autonomous Region and Tengchong City (Houqiao Town) in Yunnan Province. The route generally follows the national border (subject to the feasibility study approval), starting from Fangchenggang Station, passing through Chongzuo, Baise, Wenshan, Honghe, Pu 'er, Lincang, Dehong and Baoshan in the west, and ending in Houqiao Town, Tengchong (county-level city). The whole journey is about 15 18km, including Yunnan section 1087km and Guangxi section 43 1km.
The project from Baoshan (Tengchong) to Dehong Prefecture (mangshi) to Lincang to Pu 'er, and from Mengzi to Wenshan to Funing will be started in 20021year and put into production in 2028, with a construction period of 7 years. Recently, the mangshi-Tengchong section of this railway has been investigated, measured, certified as an important logistics node, and evaluated by experts, and it has been included in the national "Tenth Five-Year Plan" railway planning and the medium-and long-term railway network planning in the new period.
Dadianxi tourism ring road
Tengchong, located in the main node of the Great Tourism Link in western Yunnan, is an important link in the planning of the Great Tourism Link in western Yunnan. With the expansion of the tourism ring road in western Yunnan, the acceleration of traffic, the emergence of mid-range hotels and emerging tourism formats, Yunnan's unique natural, cultural and border scenery resources are perfectly connected in series. "Deqin-Shangri-La-Lijiang-Dali-Baoshan-Ruili-Tengchong-Lushui-Gongshan-Deqin" shining Great Western Yunnan Tourism Link is not only conducive to regional cooperation, but also can realize tourism and Deqin.
On April 29th, the commencement ceremony of 202 1 Tengchong Key Project and Tengchong-Lushui Secondary Highway was held in Qushiba.
Tengchong has been beating gongs and drums to create a bright pearl on the tourist ring road in western Yunnan.
In the future, Tengchong will become a "world healthy living destination and modern park city" with the integration of production and city, relying on unique tourism resources and solid market foundation, through the construction and upgrading of complex transportation network, tourism software and hardware, and the guidance and cultivation of new tourism products and formats.
Ink China Project is located in Tengchong, Yunnan, with a total land area of about 65,438+0,000 mu. The project is invested by Shanghai Shenshenqiang Construction Co., Ltd. and built by Tengchong Mingzhu Investment Development Co., Ltd. It is the first stop of Tengchong tourism and the healthy lake island market in the city.
Shuimo China
Sales reference price: the reference average price is 6200 yuan/m2.
Address: Intersection of No.317 and Huayan Road, Tengchong County.
Property telephone number: 400-8 18-0066 to 877384.