Tower crane foundation should be arranged according to the plane and geological conditions of the building. Using engineering piles as tower crane piles can save costs. The sharing of tower crane piles and engineering piles can reduce the impact on the surrounding environment and the damage to surrounding buildings. The sharing of tower crane piles and engineering piles can reduce earthwork excavation and improve construction efficiency.