1, Li Xi village drinking water project construction. The investment in the construction of high mountain water diversion, filter pond, reservoir and pipeline is 350,000 yuan (excluding villagers' labor and service fees).
2. Construction of tourist roads and supporting facilities in Richiou. The road guardrail, pavement and distance extend 3 kilometers, with a total investment of 400,000 yuan.
3. Li Xi rural power grid upgrading. The power grid of scenic service center, new village power grid, old village power grid reconstruction and transformer capacity expansion, with a total investment of 300,000 yuan.
4, scenic road greening project. The greening length is 2 kilometers, and 500 seedlings such as osmanthus trees are planted, with an investment of 200,000.
5. The protection of ancient dwellings and the construction of new countryside in Li Xi. The emblem of Lixigu Village was changed to 70,000 yuan, and the sewage pipe network of the ancient village was built 1.5 million yuan; New village construction, 30 households in the first phase, with an investment of 3 million (including land acquisition and infrastructure construction). The total investment is 3.22 million yuan.
6. Construction of tourist water surface in Lixiwu. Through attracting investment, we will build Lixiwu tourist dam and small hydropower project with a total investment of 3 million.
On July 5th, CCTV financial channel Global Financial Connection reported on the rural tourism in Li Xi scenic spot of our town. This report shows the natural features and cultural landscape of Li Xi Village to the national TV audience in a real way. CCTV made a systematic and comprehensive report on the Mulian culture, the health-preserving culture of imperial doctors and the ecological resources in Li Xi village. This report has greatly improved the popularity of Li Xi Scenic Area and injected strength into the next development of the scenic area.
List of sports facilities in Li Xi Village:
March: site selection and site implementation
April: Level the site and tamp the ground.
May: On-site watering hardening
June: Equipment installation and acceptance.
Li Xi Village, located at the south foot of Guniujiang Nature Reserve, is one of the earliest villages in our county to develop rural tourism. Li Xi Scenic Area has become a new bright spot of rural tourism around Guniujiang with its long history and rich natural ecological resources. Since the beginning of this year, under the strong leadership of the county party committee and the county government, Likou Town, relying on the opportunity that Li Xi tourism promotion project was listed as the key promotion project of our county, vigorously promoted the tourism promotion project of Li Xi scenic spots. First, the project report is as follows:
First, refine the work objectives and promote project implementation. Since the launch of the Li Xi Tourism Promotion Project, Likou Town has always regarded this project as the top priority of the Party Committee and government. Every meeting should mention the work objectives and report the progress of the project every week. The responsible comrades of the party and government personally took the lead and set up working groups with different functions to deal with various problems in land acquisition and construction, so as to form a joint force and strive to advance in an all-round way, thus speeding up the construction of the whole key project.
Likou Town divides the project into eight specific aspects. Focusing on the "eight ones", it defines the work objectives, implements the responsible personnel, and reverses the time schedule. 1. A stone dam was built to protect the landscape pond, and the plank road around the pond entered the final stage; 2. The widening project of tourist roads into the village was basically completed, and 30 cases of land requisition for scenic forests along the road were completed. On August 4, Wang Yungen's ugly old house was demolished by town cadres; 3. Complete 26 buildings with emblems changed and built along the river, 8 ancient houses in Ming and Qing Dynasties listed in the "Protection Project of Hundreds of Villages and Thousands of Houses", and 2 new landscape pavilions along the river; 4. The construction of farming experience area has been completed, and the internal construction of resident farmers is under way. The Tang Zhi Medical and Food Health Center is under intense maintenance, and the internal planning and display are carried out simultaneously; 5. Li Xi New Village has started construction 14 households, with more than half of the main housing construction projects, and water, electricity, roads, squares and other supporting facilities are under planning and construction; 6. The long-term working mechanism has been formed by the establishment of roads and river regulation along the whole line from Yangcun to Li Xi Scenic Area, and the environmental sanitation along the line has been greatly improved; 7. Relying on the advantages of Li Xi Village as the shooting base of Anhui mini-TV series, promote the construction of film and television base, carry out publicity from all directions and angles, collect and sort out relevant film and television materials, and improve the protection of shooting points; 8, improve the village rules and regulations, tourism order and other system construction. Likou Town closely revolves around the above eight main construction contents, further enhances the spirit, further condenses the combat effectiveness, and pays close attention to the next key work.
Second, focus on difficulties and achieve major breakthroughs. In the next step, Likou Town will adjust its working ideas, bite the target to death, find the right entry point, and complete the Li Xi tourism promotion project in an all-round way. There are mainly the following types: 1, ornamental gardens and rockery construction along the landscape pond; 2. Land requisition for scenic forest construction and water street construction; 3. The protection project of 100 villages and 1,000 ancient houses was completed; 4. Accelerate the infrastructure construction and supporting construction of the new village, and strive to complete it before the end of 0+ 165438; 5. The reconstruction of Liyang Road and the construction of concession lane; 6. Collection and arrangement of cultural resources.
Continue the current work momentum of the whole line, grasp the progress, ensure the quality, catch up with the construction period, make great efforts, and fully complete the construction content of the "eight ones" decomposition task. At the same time, create a strong atmosphere and mobilize more people to invest in construction. Party and government leaders take turns to take command of the town, solve and coordinate related problems in time, start practical problems, promote key projects to get early results and benefit farmers as soon as possible.
Third, there are some difficulties. Since the project started construction, under the strong leadership of the county government, with the strong support of the county bureau units, and with the joint efforts of the town and village cadres, Li Xi scenic spot has undergone earth-shaking changes. However, there are still some difficulties before us. First, it is reflected in the difficulty in obtaining land, which has affected the promotion of the project to a certain extent; Second, the contribution of tourism companies in promoting key projects is limited, which affects the overall progress.