Minutes of the Meeting of Unit Project Completion Acceptance
Minutes of the Meeting of Unit Project Completion Acceptance

In daily study, work or life, meeting minutes are more and more widely used to deal with affairs. Meeting minutes are different from meeting minutes. Meeting minutes are just an objective document. How to write the meeting minutes? The following is the summary of the unit project completion acceptance meeting that I helped you sort out for your reference, hoping to help friends in need.

Unit Project 1 Minutes of Completion Acceptance Meeting Time: xx, xx, XX, XX.

Location: Construction site

Participants: See the sign-in form for details.

The construction unit organized design, supervision, survey, construction and other units to participate in this acceptance, and the Municipal Quality Supervision Station sent personnel to participate, and an acceptance expert group was set up to be responsible for the completion acceptance.

At the meeting, the owner first introduced the list of personnel of the acceptance team, and reported the implementation of relevant laws and regulations and mandatory standards for engineering construction during construction.

The construction unit shall report the general situation of the project, the handling of problems encountered in actual construction, and the summary and evaluation of engineering technical data. The self-evaluation result of the project by the construction unit is "qualified".

The design and investigation unit also made a corresponding report: mainly aimed at the preliminary survey and design work of the project, it put forward its own views and suggestions in the preliminary work, which was recognized by the construction unit. In engineering construction, all major acceptance (such as foundation, major division acceptance, pre-acceptance of completion, etc.). ) can attend on time. The evaluation of the project is "qualified".

The supervision unit reported the control of raw materials entering the site, the inspection of each process and the acceptance of the division during the construction. In the usual work, through many on-site supervision meetings and special meetings, the changes and rectification encountered in the work are solved. The evaluation of the project is "qualified".

After checking the engineering control data, the acceptance team inspected the engineering entity and found that the overall quality of the project was good. At the same time, the acceptance team also put forward some suggestions and opinions, which are summarized as follows:

1. Elbows shall be made at the lower outlet of downpipes on both sides of the roof tower, and scour baffles shall be made at the outlet; The air conditioning pipes on the roof are scattered and need to be sorted out; Roof lightning protection points are loose individually and should be treated.

2. Several separate fire riser fixtures; Fire separation should be done at the place where the air conditioning pipeline passes through the floor.

3. After some finished doors are closed, the gap is too large and needs to be adjusted.

4, individual floor tile surface scratches, serious pollution must be replaced.

5. The details around the stairwell window are not handled properly; Individual window fittings are incomplete and the glass glue is irregular.

6. The wall coating is rough in some places and needs to be repaired.

7. The damaged stainless steel guardrail in some places must be replaced.

8, 1 1×E axis gutter has leakage trace, so it is necessary to find out the reason and deal with it.

Finally, at the meeting, the acceptance team asked the construction unit to complete the rectification of the above contents within five days. After supervision and review, it is unanimously agreed that the quality level of the project is qualified.

Construction unit design unit

Exploration unit construction unit

Supervision unit

Xx engineering consulting supervisory co., ltd

X year xx month xx day

Minutes of the unit project completion acceptance meeting for 2 times:

Location:

Moderator:

Participating units and personnel:

X real estate co., ltd:

Supervision company:

Construction company:

Quality supervision station:

Design institute:

Meeting host:

Meeting arrangement:

Firstly, the personnel of the acceptance team are introduced, then the implementation of engineering laws and regulations is introduced, then the construction unit, design unit, construction unit and supervision unit make quality report and quality evaluation, then conduct on-site quality inspection, and finally make a summary of engineering acceptance.

A, the construction unit of the project introduction and acceptance report:

1. Before the acceptance of the project, we have conducted pre-acceptance with the supervisor and the constructor, and the problems found in the stairs and steel doors and windows have been rectified and implemented.

2. Introduce the general situation of the project:

This project is XX project, 6-storey, 1 storey garage, brick-concrete structure, with a total construction area of ㎡, a building length of meters, a building width of meters, a building height of meters, and a total building height of meters ... The foundation is reinforced, so that the old and new foundations can be used together. The strength grade of foundation reinforced concrete is C, the strength grade of superstructure concrete is C, the masonry adopts MU standard fly ash brick, the brick foundation adopts M cement mortar, and the main masonry mortar grade is M mixed mortar. Exterior wall decoration is a strong synthetic resin coating and cement mortar surface layer on the sand wall ground; Garage ground doors and windows are steel doors and windows; The main doors and windows are PVC plastic steel doors and windows; The roof is made of cement mortar, SBS waterproofing membrane and overhead insulation board.

3, the implementation of laws and regulations, including planning permission, bidding, supervision contract, construction contract, construction permit, etc.

4. All divisions and disciplines are qualified.

5. No quality and safety accidents occurred in this project.

6. The project archives have been accepted and qualified before the completion acceptance.

7, environmental protection, fire control and other departments, before the completion inspection and acceptance.

Second, the design unit acceptance opinions:

1. Because this project is an old foundation, the original planned settlement is 10CM. Judging from the reflected data, it is ideal at present.

2. According to the structural design, there are some problems between the engineering drawings and the current specifications.

Three, the construction unit completion quality acceptance report:

See the completion quality acceptance report for details.

Four, supervision unit to summarize the supervision work, and evaluate the quality of completion:

For details, please refer to the supervision work summary and the completion quality supervision evaluation report.

Verb (abbreviation for verb) On-site quality inspection:

1. Comments of the design unit: As this project is based on the original building structure, the clear height of the carport corridor is insufficient and relatively narrow, and other projects in the lower part need to learn lessons.

2, the construction unit:

1) The quality basically meets the requirements, but the details need to be handled.

2) Individual paint surfaces need to be treated.

3) The quality of hydropower perception is ideal.

4) The rectification of the pre-acceptance problem by the construction unit is ideal.

5) The masonry sub-division of the evaluation report is not comprehensive enough, and the concrete block report has no minimum strength and the data is incomplete.

6) Glass glue of window sill of plastic steel doors and windows needs to be treated.

7) The paint on the railing is rough and needs to be treated.

8) The quality of steel window glass ointment is not good, and it needs to be replaced again.

3. The evaluation of the project by the constructor and the supervisor is qualified, and they accept the acceptance opinions of experts from all sides with an open mind.

4, quality supervision station:

1) According to the site acceptance, the installation project is ideal.

2) The manhole wind hook on the roof is not set in a good position, and the look and feel of the baseboard is not ideal.

3) Corrugated tiles in the canopy at the entrance and exit are not well designed, and it is easy to fall and hurt people.

4) Some floors have sand, which should be checked and treated.

5) Metal doors and windows have poor paint and lack of paint, which need to be treated.

6) It is recommended that the toilet stool pipe be sealed to prevent garbage from falling and odor from coming out.

Finally, the owner made a summary of the completion acceptance, and the construction quality of this project was relatively good, and 45% was basically not found. Cracking phenomenon, the engineering evaluation is qualified. In view of the problems raised by experts in the quality supervision station, the construction party is required to deal with them.

Supervision co., ltd

20xx years

;