It is a mixture of quicklime powder or hydrated lime powder mixed with soil according to the optimum water content. After compaction and maintenance, the compressive strength meets the engineering requirements.
But it must be stirred well before it can be used. Otherwise, it will cause problems such as uplift or uneven settlement.