Time goes forward step by step on the annual ring, and a period of work has ended. Looking back on your work during this period, I believe you have many feelings. At this time, how can the most critical work summary fall! So how is the general work summary written? The following is a summary essay (5 selected essays) that I have compiled for you, for reference only, and I hope it will help you.
Since the summary of the Development Office 1 and 1, Xinglong Town Economic Development Office, under the correct leadership of Xinglong Town Party Committee and government, and with the close cooperation of villages (residences) and departments, has strengthened the primary position and basic role of investment promotion and project construction in attracting investment, constantly improved the management system, improved the working mechanism, implemented the target responsibility, promoted project construction by attracting investment, and promoted project construction by fixed assets investment. The annual work situation is briefly reported as follows:
I. Work completed in the first half of 2008
1. Project construction: * * 42 construction projects (including 7 continuation projects), including county-level key projects 1, and town-level key projects1; The investment in fixed assets is 344,965,438+million yuan, accounting for 65.4% of the annual task of 527,465,438+million yuan; There are 32 foreign-funded projects, including 4 projects outside the county and 28 cooperative projects within the county. The total investment of imported projects is 400 million yuan, and the funds currently in place are 316.5 million yuan, accounting for 79. 1% of the tasks.
2. Submit fixed assets investment report, investment promotion report and economic cooperation report on time, complete the establishment of provincial-level eco-town information, and collect and submit project filing information.
3. Successfully meet the inspection of the Ministry of Environmental Protection to create a national-level eco-town, and complete the relevant materials for creating a national-level eco-town, which have been reported to the provincial level and are under examination and approval.
Second, the existing problems and deficiencies
1. Due to insufficient investment in some projects, some projects progress slowly and the investment is not timely.
2. There are many project materials and high requirements, so it is necessary to further strengthen the study of business knowledge.
Three. Work plan for the second half of the year
1, actively carry out investment promotion work. Make good use of existing policies, actively strive for funds, coordinate and solve the problems of land occupation and labor organization in attracting investment, strictly introduce more pollution-free enterprises, and prosper investment and industry.
2. Strengthen the construction of project library. Invest a batch and reserve a batch, continue to improve the establishment of the project ledger, and specify the investment plan, construction time, responsible department and responsible person in detail.
3. The preparatory work for the project is over 300 million yuan, and the investment is over 400 million yuan.
4. Pay special attention to the dynamic tracking management of the project, ensure the timely progress of the project under construction, and ensure the safe and civilized construction of the project.
5. Submit all kinds of materials on time.
6, enhance the sense of responsibility, consciously perform their duties, obey the unified work arrangement of the party committee and the government, and strive to complete various tasks.
Summary of Start-up Work 2 According to the work arrangement of the town party committee and government at the beginning of the year, the staff of our office worked hard to overcome many difficulties and successfully completed many tasks assigned by the party committee and government.
First, the economy maintained a healthy and rapid development momentum.
This year, the total output value of enterprises in our town reached xx billion yuan, an increase of XX% over the same period last year. Among them, the total industrial output value was xx billion yuan, a year-on-year increase of XX %;; The added value of enterprises is xx billion yuan, a year-on-year increase of XX %;; Realized a profit of xx billion yuan, a year-on-year increase of xx%. Among them, the total output value of industrial enterprises above designated size is xx billion yuan, an increase of XX %; over the same period of 20xx; Our town actually completed the investment in fixed assets of xx billion yuan, a year-on-year increase of XX %;;
Second, new breakthroughs have been made in attracting investment.
1. As for xx Company, our town actively assists in land leasing, house relocation and highway construction. The company broke ground in March this year, and has invested nearly 30 million yuan to solve the labor force of more than 30 people. The company has entered the trial production stage in July.
2. Through the unremitting efforts of the town leaders and the staff of the whole institute, xx Company was introduced and actively assisted in land lease and young crops compensation. Now we are actively assisting in handling temporary land lease and other procedures. The company expects to invest more than 35 million yuan this year, and the output value will reach more than 500 million yuan after it is put into production, which can create tax revenue of about 35 million yuan and solve the employment problem of more than 200 people. At present, the company broke ground in July.
3. The imported xx company with an annual output of 38 million yuan has completed the preliminary work such as site selection and project establishment.
Three, combined with the special action to crack down on illegal activities, and constantly deepen the work of production safety.
According to the arrangement and deployment of the special action against illegal activities in Chongqing, our bureau has carefully investigated and rectified the enterprises within its jurisdiction.
1. Conduct special rectification and investigation on illegal activities in xx non-coal mines and xx coal mines within its jurisdiction. Xx non-coal mines and coal mines have complete licenses and operate legally. The hidden dangers involved were carefully investigated and the rectification opinions were put forward. Safety production license, my office in conjunction with the land, safety supervision and other departments shall be ordered to suspend business. And urge them to go through the relevant procedures at the Land and Resources Bureau and the Safety Supervision Bureau.
2. A special inspection was carried out on fireworks and firecrackers within the jurisdiction. There are no units or individuals that illegally produce fireworks and firecrackers in our town, and very few people are confiscated without business licenses. After giving a serious warning, illegal operation is not allowed.
3 to investigate all enterprises in the area, carry out occupational health examination, and urge to declare occupational disease prevention and control.
4. The fire-fighting facilities in 9 small places within the jurisdiction were carefully inspected, and the fire hazards were rectified to ensure the property and life safety of the people.
Fourth, environmental protection.
1. According to the regulation plan of xx river basin, our town has established a long-term management mechanism with village and community secretaries as the main leaders to prevent polluting enterprises and polluting farmers from rebounding. There is no rebound in the region, and there are no new polluting enterprises and aquaculture in villages and communities.
2. Do a good job in the protection of drinking water sources, ban all aquaculture facilities and fat water fish farming that cite water sources, and terminate the fish farming contracts of all Sanpingtang and reservoirs within the jurisdiction. Ensure the standard of drinking water sources and the healthy drinking water of the people.
3. Conscientiously do a good job in environmental monitoring of various enterprises, actively handle many environmental complaint cases, and ensure that the whole town does not have mass petitions and group visits caused by illegal environmental pollution cases, and ensure the stable control of environmental cases within its jurisdiction.
The above achievements have benefited from the correct leadership of the town party Committee and government and the strong support of the masses and all walks of life. However, there is still a certain gap between our work and the requirements of the town party Committee and government. We will work harder, conscientiously sum up experience and learn lessons. Do a better job next year and fully accomplish the objectives and tasks for the whole year.
Summing up the work of the Development Office in the past three years, under the leadership of the town party committee and government, the Town Economic Development Office has emancipated its mind, made pioneering efforts, worked hard, closely focused on promoting economic development, and made the construction of characteristic agricultural bases, increased investment in technological transformation, and increased the development of the tertiary industry as the focus of economic work, and successfully completed various tasks throughout the year. The work in the first half of this year is summarized as follows:
I. Main Work
(1) Provide all-round services for enterprise development, deeply understand enterprise development problems and next investment plans, listen to the opinions and suggestions of enterprises on optimizing investment environment, actively offer suggestions for enterprise development, and provide all-round services for enterprises to solve development problems. First, cooperate with the relevant departments of the county party Committee and the government to do a good job in the construction of the far-Austrian aircraft manufacturing project; The second is to coordinate the restructuring of Chengde Fengrun Copper Co., Ltd. At present, the project has completed the acquisition of individual shares; Third, actively promote the preliminary work of the project of purification, deep processing and utilization of polymetallic elements in Chengde Ji Tai Mining Co., Ltd., and have completed the preparation of the project feasibility report and the project site selection. Fourth, help Chengde Hairun Chemical Co., Ltd. to complete the site selection and land lease of the 2000 cubic meters oxygen-enriched production project. At present, the project has entered the stage of equipment installation and is expected to be put into production in July.
(2) In strict accordance with the work requirements of the town party committee and government of "depth, research, detail, reality and accuracy", do a good job in various economic statistics and complete the report work on time.
The second is the completion of various economic indicators.
(1) Completion of indicators of private economy: In the first half of this year, our town was basically completed.
It has become more than half of the tasks assigned by the county government. As of May, the total output value has reached 9106,000 yuan, accounting for 5 1% of the annual tasks. The added value is 29 1.38 million yuan, accounting for 65% of the annual tasks; 955 individual industrial and commercial households, accounting for100% of the annual task; There are 65 private enterprises, accounting for 100% of the annual tasks.
(2) Completion of open project indicators:
65,438+0. The fixed assets investment of the whole society is 38 1.25 million yuan, accounting for 31.78% of the annual task; The investment in production and operation of fixed assets is 38 1.25 million yuan, accounting for 42.36% of the annual task.
2, the introduction of county capital of 205 million yuan, completed the annual task of 565438 0.25%.
3. 6 new planned projects, 75% completed; Five projects were signed, accounting for 7 1.4% of the completed tasks.
(3) Energy consumption: Enterprises below scale and primary and tertiary industries consume 2,202 tons of standard coal.
Third, the next key work arrangements
First, pay more attention to attracting foreign investment, coordinate in many ways, and complete the task of attracting foreign investment and investment in fixed assets. It is necessary to put the work of attracting investment in an important position in all economic and social work in the town, highlight key points, and ensure the completion of this year's objectives and tasks.
The second is to vigorously promote the construction of projects under construction. Focus on projects under construction. First, fully coordinate the construction of far-Austrian aircraft manufacturing projects; Second, the project construction of deep processing and comprehensive utilization of polymetallic elements in Chengde Ji Tai Mining Co., Ltd.; Third, reorganize Fengrun Copper, and strive to complete the reorganization as soon as possible; The fourth is the construction of polymetallic extraction project of Pingquan Shengfeng Mineral Processing Co., Ltd.
The third is to strengthen the management of project library. Based on the principles of rolling development, cascade management, innovative development and scale guarantee, the project reserves are constantly adjusted, supplemented and optimized to form a virtuous circle of planning reserves and starting a batch.
The fourth is to optimize the investment environment. Vigorously build a platform for attracting investment, further intensify policy innovation, resolutely honor preferential policies for attracting investment, and attract investors with a more relaxed environment; Further improve the work style, provide efficient and high-quality services, and do it quickly, specially, immediately and well to satisfy investors.
The fifth is to give full play to the advantages of park resources. Make full use of the advantages of convenient transportation, rich mineral resources and agricultural products in the old and new parks of our town, make a fuss about resource transformation, deep processing of products and location transportation, strengthen the excavation, collection and packaging of resource development projects such as mineral resources, agricultural and sideline products and logistics in our town, and use the advantages of resources to attract investment and realize the transformation of resource advantages into economic advantages.
Summary of the work of the Economic Development Office. Completion of economic work in 20xx:
1. Planned industrial output value: 20xx years, the town's planned1/enterprise (Sanxin) is expected to achieve an output value of 760 million yuan, completing 97.4% of the annual task (780 million yuan) and striving to complete it.
2. Investment in fixed assets: In 20xx, the investment in fixed assets in the whole town is expected to reach 400 million yuan, accounting for 125% of the annual task (373 million yuan), of which industrial investment is 290 million yuan, accounting for 100% of the annual task.
3. Total retail sales of consumer goods above designated size: The total retail sales of consumer goods above designated size in the whole town is expected to be 4.3 million yuan in 20xx, accounting for 100% of the annual task.
4. Investment attraction: the estimated investment in 20xx is 654.38+0.2 billion yuan, accounting for 40% of the annual task; Two projects with capital of more than 50 million yuan have been introduced (both xx Du Wen Ecological Park Project and xx Ecological Agriculture Park have started), of which xx Ecological Park will be put into storage in 20xx and Du Wen Ecological Park will be put into storage in 20xx. Three hundred million yuan projects (Runjia Eco-agricultural Science and Technology Park Project, xx One Plus One Internet Plus Ecological Park Project, Laoshan Healthy Pension City and its supporting projects) have been introduced, and it is expected to complete the signing project 1 project at the Shanghai Economic and Trade Fair before the end of the year.
II. Construction of key investment projects:
1. Lianhuashan cemetery project: the total investment of Lianhuashan cemetery project is10.60 billion yuan, and the accumulated investment is10.50 billion yuan. The overall construction is basically completed. This year, we will mainly carry out the construction of supporting auxiliary facilities. This time, it has not been affected by the disaster and is progressing smoothly. It is expected to be basically completed before the end of the year.
2. Geyu Ecological Park Project: More than half of Geyu Ecological Park project with a total investment of 654.38+0.2 billion yuan has been invested, and the roads in the park are basically connected, with more than 654.38+million seedlings planted. Affected by disasters, soil erosion is serious. Subsequent construction progress is slow.
3. Wanhua Landscaping Project: The Wanhua Landscaping Project with a total investment of 52 million yuan was established at the end of 20 15, and nearly 1,000 pots of high-grade flower seedlings were purchased. In May of 20xx, the office building and management building started construction. From July to September, construction was forced to stop due to floods and rainy weather. 5438+ 10 resumed work in June and is expected to be completed by the end of the year.
4.xx Du Wen (Laoshan) Ecological Park Project: The Du Wen Ecological Park Project with a total investment of 55 million yuan was established in May 20xx. The preliminary land leveling has been completed. The artificial pond has been preliminarily dug and more than 400 landscape seedlings have been planted. Follow-up facilities such as green promenade, fishing platform and farmhouse are under construction and are progressing smoothly.
5.xx Ecological Park Project: The xx Ecological Park Project with a total investment of 50 million yuan was established and put on record in September 20xx. In the early stage, rice, bletilla striata 100 mu were interplanted three-dimensionally due to the disaster, and then Trichosanthes kirilowii and ginger 136 mu were replanted. Office buildings, warehouses and other follow-up supporting facilities are under construction and are progressing smoothly.
6. Runjia Eco-agricultural Science and Technology Park Project: The project was put on record in August of 20xx, and the land transfer was basically completed. Strive to start construction after the signing of the Shanghai Economic and Trade Fair at the end of 20xx.
Three. Work arrangement for 20xx years:
(1) Strengthen service awareness and promote enterprise development.
The flood in July this year caused my town Huayuan Industrial Park (including two supervision enterprises) to be flooded, which caused heavy losses. Our town strengthens the coordination service for enterprises in time, raises financing matters through multiple channels, helps enterprises to resume production as soon as possible, and ensures that customer orders are not lost. After the water recedes, actively strive for project financial support from superiors and rebuild the factory building. In 20xx 10, two enterprises, Sunshine Yulu Food Company and Xu Dong Plastic Company, were encouraged to declare new enterprises above designated size in 20xx to expand production and enhance their ability to resist disasters and risks. Affected by the disaster, the planned output value of our town will decrease this year. In 20xx, we will focus on enterprise dynamics, coordinate and communicate, help and increase efficiency, and strive to complete various economic indicators for the whole year.
(2) Actively introduce projects to promote economic development.
The Town Economic Development Office made an early plan, quickly counted all kinds of water damage losses after the disaster occurred in our town, compiled 14 short-board project for preventing natural disasters in time, and applied for support funds of 698.7 million yuan. In June+10, 5438, three special construction fund projects (improvement of water bodies in water systems such as Fenghuang River, renovation and upgrading of polder areas below 1,000 mu, and characteristic towns) were declared. At the same time, it fully mobilized the enthusiasm and initiative of various departments and villages to introduce projects and funds. Under the background of further accelerating land circulation management, we should build a number of potential agricultural products brands, cultivate characteristic planting and breeding bases, do a good job in post-disaster reconstruction, resume production as soon as possible, and expand the village economy. Affected by disasters, government departments will gradually increase investment in infrastructure construction and people's livelihood projects to create a good investment environment. Strengthen foreign cooperation and increase foreign investment. At the same time, local enterprises are encouraged to attract investment by business, and enterprises are encouraged to introduce investment projects and funds independently. In 20xx, we will focus on following up Runjia Eco-agricultural Science and Technology Park Project, xx One Plus One Internet Plus Ecological Park Project, Laoshan Kangyang Pension City and supporting projects, and strive to reach a contract at the Beishangguang Economic and Trade Fair. Promote the project to start as soon as possible and promote the economic development of the town.
Summary of the work of the Economic Development Office 5 In the first half of this year, under the leadership of the town party committee and government, and under the guidance of the superior business department, the Town Economic Development Office carried out the functions of economic development research, economic management services, guidance and coordination in an orderly manner according to the objectives and tasks of the town's economic work determined at the beginning of the year.
I. Work Review
(a) due diligence, and actively carry out economic development research, coordination and service.
1, responsible for taking the lead in coordinating building investment promotion services and effectively promoting building investment promotion. As the lead department of building investment promotion service, our bureau drew up the target plan of building investment promotion this year at the beginning of the year, coordinated and held several liaison meetings of the building working group, paid close attention to the investment promotion progress of each building in real time, coordinated and solved the tax, industrial and commercial problems encountered in the process of investment promotion service, sorted out and summarized, and wrote and reported many problems, countermeasures and suggestions and related information materials encountered in building investment promotion service, making due efforts to promote the building investment promotion service in the whole town.
2, efforts to carry out policy declaration and settlement, effectively promote the development of enterprises. First, the settlement of last year's support policies was completed. At the beginning of March, our office officially started the settlement of supporting policies, settled the supporting funds for enterprises introduced by various investment platforms and old enterprises in towns, conducted a preliminary examination of the application materials provided by enterprises, and reported the settlement results to the town finance office for review. 20xx has 859 enterprises that meet the supporting conditions, with cash of nearly 200 million yuan. The second is to carry out policy propaganda and guidance. In the first half of the year, our office carried out the training work on the declaration of industrial policies such as the listing policy of enterprises in an orderly manner, took the initiative to answer publicity policies for enterprises, successfully guided the action to successfully declare the filing subsidy for listing counseling, and five PE/VC enterprises declared the start-up fee and rental subsidy. The third is to do a good job in corporate visits. In the first half of the year, our bureau earnestly carried out enterprise visits, communication and coordination, frequently visited enterprises to coordinate and solve problems and difficulties in enterprise safety and energy consumption, organized two energy-saving work promotion meetings, signed energy-saving target responsibility letters with 25 key energy-consuming enterprises, trained energy managers of all units, strengthened daily monitoring of key energy-consuming units, and effectively promoted enterprise safety production and energy-saving and consumption-reducing work.
3, comprehensive coordination of economic development work, play the role of functional departments. First, strictly control the relocation of enterprises. In view of the incongruity between the investment platform of this town and the departments of industry and commerce, taxation, etc. in the process of enterprise relocation, our office has drawn up a countersignature form for enterprise relocation, successfully intercepted a number of enterprises' relocation, and issued 1 enterprises with intention to move out after successfully withdrawing from the support funds over the years, thus ensuring the standardization of the approval procedures for enterprise relocation and avoiding arbitrary changes of enterprises. The second is to assist investment companies to clean up accounts receivable and investment income. In response to last year's audit rectification requirements, our office actively assisted investment companies to further sort out accounts receivable and investment income, especially to sort out and verify the equity transfer and investment income between Zhen Industrial Company and Zijiang International Trade Co., Ltd., a subsidiary of Zijiang Group, and the investment exchange and income of Zijiang Rubber. At present, the two sides are conducting data verification. Third, we have made preparations for relevant meetings. Mainly for corporate Spring Festival group meetings, village-level economic research and exchange meetings and "Zhejiang businessmen see xxR26;; Focus on activities such as xx, and do a good job in meeting summary, information distribution, follow-up and docking after the meeting.
(two) quality and quantity, and constantly strengthen economic management.
1. We continue to strengthen the management of foreign-funded enterprises. First, the year-end income distribution, settlement and cashing, and this year's assessment indicators and policy formulation were completed. At the beginning of the year, on the basis of auditing village (reformed village company) and town-level companies, our bureau completed the assessment of village-level and town-level companies and the cash distribution of cadres, supervised the year-end income of production teams and village (stock) people, and completed the distribution and settlement of cadres in towns and institutions. In the first quarter, according to the financial budget of each unit at the beginning of the year and the completion of various economic indicators in the previous year, combined with the economic development, the annual economic assessment indicators of the companies directly under the towns and villages in the town were completed. The second is to deepen the standardized management of rural finance. This year, our bureau focused on strengthening the monetary fund management of public institutions and the audit of cadres' salaries, requiring all units to strictly implement various financial standards and systems. At the beginning of April, our office conducted business training for the financial leaders, cashiers and supervisors (leaders of democratic financial management teams) of villages (including village companies after restructuring). In May, our bureau conducted distribution audit, financial regulation and cash check on all town-level companies and villages (village companies after restructuring). Third, continue to thoroughly investigate public assets and resources. On the basis of a thorough investigation of the public housing facilities in various communities in the town last year, in March, my office led a meeting attended by the town office, community office, planning office and other departments, and proposed a thorough investigation of the state-owned assets in the town (including public housing facilities, commercial housing, red-certified or undocumented housing, state-owned land, etc.). ). At present, the information has been checked with the district real estate trading center, and the obtained information on public housing facilities has been distributed to the neighborhood committees for verification, and some resources have been visited at home.
2. Do a good job in audit supervision. First, do a good job in the project cost evaluation of financial capital construction projects. In the first half of the year, our office completed 76 construction projects, and the final settlement price was 31376,600 yuan. Upon examination, the total amount is 2,697,265.438 million yuan, with a total amount of 4,404,500 yuan. The reduction rate is 65438 04.04%. Through the examination and approval of price reduction, the project cost was saved, the interests of all parties were well safeguarded, and the first level was passed for the effective utilization of urban economic resources. The second is to do a good job in auditing the financial revenue and expenditure of public units and villages in the town. At the beginning of the year, the financial revenues and expenditures of institutions and villages (restructured village companies) included in the assessment and distribution in the town were audited. After the audit, each unit basically achieved the annual economic target, the financial revenue and expenditure were recorded in time, the collective assets were well managed, no unreasonable creditor's rights and debts occurred, and the financial disclosure was timely, accurate and true.
3. The statistical investigation is proceeding in an orderly way. First, the task of 20xx annual statistical report was successfully completed. My office has formulated the implementation plan of the annual report, defined the job responsibilities of all professionals, and made the division of labor clear, and the responsibility lies with people. At the beginning of the year, our office held six professional annual training courses with more than 360 trainees. At the same time, our statisticians strengthen the supervision, inspection and guidance of online newspaper enterprises, strictly control the quality of data, and ensure the timely and accurate submission of statements. The second is to actively promote the reform of urban and rural household registration integration. At the beginning of the year, our bureau held a summary meeting of the 20xx annual urban and rural household survey, and made arrangements for this year's survey. My office also provides professional guidance on household surveys through meetings, telephone contact and field visits. At present, the survey of urban and rural households in our town is being carried out in an orderly manner. The third is to complete various statistical investigation tasks on time.
Second, the difficulties and problems in the work
(A) the establishment of investment service institutions is difficult.
First of all, social construction operators generally pay more attention to rent than tax. Although our town has repeatedly emphasized the necessity of territorial registration of social building enterprises, due to the lack of necessary restrictive intervention measures for building operators, some building business units only attach importance to leasing and ignore the territorial registration of enterprises. The tax linkage agreement signed with enterprises has not played a very positive role, and the territorial registration rate of some social construction enterprises is still low. Second, it is difficult to complete the annual target of building investment service. At the beginning of this year, our bureau formulated the assessment targets of investment promotion services for 22 key real estates. Judging from the completion and feedback of each group, the time and goal are not over half, and it is difficult for many groups to complete the tax and territorial registration goals, and the problem of handling real estate licenses for buildings such as Yingjia and Zhongzhan remains unresolved.
(B) The financial support policy has brought a lot of trouble.
First, enterprises are asking higher and higher prices for supporting policies, which brings great pressure to finance. Due to the district government's 3:7 division of our town's financial resources, and the 1: 9 division or even 100% decentralization of the financial resources of several surrounding towns and xx industrial zone, many enterprises in our town, including some large taxpayers, require more preferential policies, and the "congenital deficiency" in financial settlement makes it difficult for our town to compete with other towns in preferential policies. At present, our town's financial support has increased. Second, the adjustment of financial support policies can easily lead to corporate dissatisfaction. Since the beginning of this year, our town has implemented the operation mode of financial lump sum settlement between villages and investment promotion centers. Villages and investment service centers have reduced or cancelled their support for some enterprises that do not meet the requirements or are oriented to industrial development. Many enterprises that used to enjoy policy support were greatly dissatisfied with the policy adjustment, and frequently called or protested in our office, which brought great pressure to our normal work.
Three. working face
(1) Continue to sort out government public assets.
Our bureau will further do a good job in sorting out the government's public assets, further verify the situation of public assets on the basis of the relevant investigation and information check carried out around the public housing information of various communities in the previous stage, and establish a standardized and orderly public asset management mechanism with clear rights and responsibilities. In the second half of the year, our office will send people to visit and take photos one by one to understand the current situation of renting and using public property, and hire a professional company to design and develop a public property management system, and input the town's public property information into the management system to realize dynamic network management.
(2) Further promoting village-level economic reform.
Our bureau will further strengthen guidance and supervision, and continue to promote the reform of property rights system in Qingnian Village and Shenbei Village. In the second half of the year, on the basis of preliminary work, our bureau will guide the two villages to do a good job in assets verification and property rights definition, and set up village economic cooperatives. Specifically, it includes: holding a meeting of villagers' representatives before the end of 10 to adopt the village economic reform plan; 165438+ 10, the property right system reform of youth and Shenbei village was included in the acceptance of the district and village economic reform platform, and the district-level special support funds were won; Before the end of the year, we will fully complete the township reform and structural adjustment.
;