The construction technology of quick cement repair material is simple, and the 5mm thin layer is repaired. Road surface cleaning: use high-pressure water gun to clean the floating soil, sundries and loose objects on the road surface. Note: no water is allowed after the surface is cleaned.
Mixing: mix according to the ratio of patching material: white latex = 100: 20 (if the amount of emulsion is too much, it will lead to slow setting time after molding, surface cracking, and the color of cement pavement varies greatly from place to place. Black color paste can be added when stirring to adjust the color of emulsion). Note: Do not mix too much repair materials at one time, and mix them while constructing. Mortar mixed with repair materials shall be completed within 30 minutes; When manual mixing is used, it is necessary to flow, mix and construct. The construction temperature should be higher than 5℃.
Plastering: firstly spray white emulsion on the cleaned cement pavement, then spread the mixed repair mortar evenly, then smooth it with an iron trowel and trowel, and brush the emulsion on the repair surface after the light is collected (for thin-layer repair, use an iron trowel, please refer to the construction method of ordinary cement mortar).
Maintenance: After the construction is completed, the traffic can be directly opened with film covering for 6 hours (if the road is closed, the opening time will be slightly extended and the construction effect will be better).