I. Basic principles
Focusing on the goal of "smooth drainage and irrigation, clean water surface and beautiful bank slope", we will vigorously carry out the special action of "cleaning ditches and beautifying villages" by means of ditch cleaning, water surface cleaning and bank slope regulation.
Second, the scope of implementation and construction objectives
(1) Scope of implementation: He Changlin Town, Cuo Town and Dianbu Town; Mainly choose ditches with irrigation and drainage functions, ditches crossed by main roads, ditches around market towns and large natural villages. The ditches that need to be dredged in other towns and villages can only be included in this special action after being approved by the leaders in charge of the county government.
(2) Construction goal: Through the special action of ditch cleaning, the irrigation, drainage, water storage and ecological functions of ditches will be restored, the irrigation and drainage capacity will be improved, and the agricultural production conditions and people's living environment will be improved.
Third, organize the implementation.
(1) Making plans. Project implementation should be combined with the actual situation to develop an implementation plan, which mainly includes organization and implementation, division of responsibilities, project arrangement, construction plan, fund raising and work measures. The scheme can be implemented only after it is approved by the county water department.
(2) Organizing the implementation. Township people's government is the main body of implementation and responsibility.
Four. Contents and standards of project construction
Ditches for dredging and remediation shall meet the following standards: all water plants and garbage in the ditches must be removed, and the removed water plants and debris must be buried deep and shall not be placed in ditches; In principle, the inner slope is 1:2, and the outer slope is naturally sloped according to the specific terrain; The depth of channel dredging can make irrigation and drainage smooth according to a certain proportion; Top width, bottom width, platform, etc. Construction in place according to relevant requirements, earthwork compaction; According to local conditions, try to be flat, flat, flat, straight and green. According to the needs, the supporting buildings such as bridges, drainage culverts and gates will be provided reasonably, and the construction scale will be determined according to the actual situation of each river.
V. Project Award Criteria
In order to fully ensure the smooth development of this special action, the county allocated the project funds of Dianbu Town, Cuo Town and He Changlin Town 1 10,000 yuan in advance. After the end of the special action, the county government will organize relevant departments to carry out inspection and acceptance, and implement the award instead of compensation in accordance with relevant policies.
Duration and acceptance of intransitive verbs
(1) construction period. Villages and towns where the project is implemented should make preparations for clearing ditches and digging ditches. All projects are required to be completed before the end of May 2065438+2003, and no reward will be given after the deadline.
(2) Project acceptance. After the completion of the project, the township as a unit, first self-inspection, self-inspection qualified, ready to relevant information, written to the county-level water department for county-level acceptance. The county government should organize relevant departments to check and accept the projects one by one. The contents of inspection and acceptance include: inspection of construction conditions and construction contracts, actual earthwork volume, project quality, supporting facilities of buildings, greening and other related materials. , consult village organizations and villagers' representatives on the project construction, and fill in the project acceptance form.
Seven. job requirement
(1) unify thinking and understanding. The special action of ditch cleaning is a livelihood project that benefits the masses and beautifies the countryside. Township and county water departments should attach great importance to the implementation of the project, and earnestly implement the organization, measures and implementation in place.
(2) Adhere to openness and transparency. The water affairs and finance departments of towns and counties should make full use of various forms and widely publicize the significance of the special action to clean ditches. Combined with the favorable opportunity for the implementation of awards and subsidies at the county level, various financing methods, such as integrating agricultural funds, the masses' "one thing, one discussion" financing and socialized donation, are adopted to mobilize the enthusiasm of village groups and farmers to participate in project construction and management, and give full play to the main role of the masses. The construction content and the use of funds should be posted in the village where the project is located, so as to raise public awareness of the project construction and consciously accept the supervision of the masses.
(3) Strengthen project management. In the process of construction, the township and county water departments should arrange professional and technical personnel to provide technical guidance for the construction project of the special action of ditch cleaning and canal cleaning, urge the construction unit to construct according to the standard, and supervise the construction progress at the same time to ensure that the task is completed on time. The county water affairs and finance departments should arrange special personnel to track and understand the implementation of the project in a timely manner, and organize the construction in strict accordance with the content of the implementation plan to ensure the quality of the project and the standard use of funds.
In fact, in my inner world, I envy people who can cook good dishes. My mother, on the other hand, is a good cook and has nothing to say about her appearance a