Safety responsibility agreement
There are 7 safety responsibility agreements.

In today's social life, an agreement is needed in many cases, and signing an agreement can bind both parties to fulfill their responsibilities. I believe many friends are very uneasy about the proposed agreement. The following is the 10 security responsibility agreement I compiled for your reference, hoping to help friends in need.

Safety Responsibility Agreement 1 Party A:

Party B:

Through consultation, both parties reached the following agreement on the safety responsibility of all projects (including sporadic projects) entrusted by Party A to Party B:

1. This agreement is applicable to all construction projects (including sporadic projects) entrusted by Party A to Party B. Party B must abide by the safety production clauses and carry out the construction in strict accordance with the safety operation regulations.

2. When Party B's personnel enter the construction site, they must abide by the safety production system formulated by Party A and the safety regulations of customers.

Three. Party B must hang safety warning signs on the construction site according to the actual situation, and immediately correct and deal with those who violate the rules.

Four. During the execution of the "Project Agreement" by Party B, all safety responsibilities shall be borne by Party B, which has nothing to do with Party A; Party B also promises to provide personal accident insurance for each construction worker, and the premium shall be borne by Party B. In case of accidents caused by Party B's tools, equipment and construction that do not meet the safety regulations or violate the operating rules, all losses and responsibilities shall be borne by Party B and reported to its superior competent unit for investigation and handling.

5. If Party B's tools, equipment and construction fail to meet the safety regulations or violate the operating rules, Party B shall bear all administrative, civil and criminal responsibilities, report to its superior competent unit, and organize investigation and handling.

Intransitive verb Party B's special operators (including local quality and technical supervision departments, etc.)

Personnel designated by relevant government departments) must hold relevant certificates, and Party B must have a special person responsible for safety supervision and inspection, and the tools and equipment used must meet the safety requirements. Once the risk factors are found, they must be corrected immediately.

Seven, Party B in the workshop when hot or set up temporary power lines, power supply, etc.

This operation must be approved by the relevant departments of the user. Party A has the right to conduct spot checks and supervision according to the provisions of this Agreement. When illegal operation (construction) is found, Party A has the right to stop Party B's operation, and Party B shall bear the losses.

This agreement is made in duplicate, one for each party, and shall come into effect after being sealed and signed by both parties.

Party A: Party B:

Handler: Handler:

Year, month, sun, moon, sun.

Article 2 of the safety responsibility agreement of Party A:

Party B: Parents of Grade Students:

The Education Law, the Compulsory Education Law, the Law on the Protection of Minors and other laws and regulations clearly stipulate: "Educating students is the unshirkable responsibility of schools, families and society." Schools, families and society should provide a safe, harmonious and healthy educational environment for the growth and development of young students. In order to implement the safety education clearly stipulated by laws and regulations, in accordance with the above-mentioned laws and the Measures for Handling Student Injury Accidents issued by the Ministry of Education, on the basis of soliciting opinions from all walks of life and parents of students, and in line with the principle of fully respecting the educational wishes of students from both home and school, and in order to clarify the responsibilities of family and school for students' safety education, the following agreement is reached on the safety education responsibilities that Party A and Party B should perform through consultation:

1. Party A's responsibilities:

(1) Party A has the right to conduct safety education for students in accordance with the Education Law, Compulsory Education Law and other relevant laws and regulations, and to criticize and punish students who violate relevant systems such as safety education.

(2) Party A conducts safety education for students by following classes every day, raising flags every Monday, and holding regular meetings every week, so that students can master some basic knowledge of self-care, self-help and safety precautions.

(3) Party A shall assist the school to check the hidden dangers of hardware facilities such as school buildings, teaching equipment and teaching venues through regular inspections to ensure the safety of each student's learning activities on campus.

(4) Party A requires every teaching staff to standardize their teaching behavior and not to punish students in a simple and rude way.

(5) Party A has the obligation and right to stop and give priority to mediation of incidents that infringe on students' personal safety on campus.

(VI) Party A shall regularly educate students on the Code of Conduct for Primary and Secondary School Students, the Code of Daily Conduct for Primary and Secondary School Students and relevant laws and regulations, so that students within and between classes can live in a civilized, friendly and harmonious way, and do not bully or discriminate against classmates, especially to prevent the occurrence of campus violence.

(VII) Party A has the right to give priority to student safety incidents, and has the obligation to report to the school and inform parents at the first time in case of emergency. In case of injury, Party A is obliged to send the injured students to nearby hospitals and clinics for treatment, but all expenses shall be borne by the parents or Party B of the infringing students. ..

(VIII) Party A shall educate students not to eat expired, deteriorated, unwashed or unqualified foods and drinks inside and outside the school.

(9) All teachers in Party A's class have the obligation to evacuate in case of emergency and danger, and protect students from the scene.

(10) Party A requires students not to leave school or leave school without authorization during their study or activities at school, otherwise the students and their parents will be responsible for the accidents.

Two. Party B's responsibilities:

(1) Party B shall also consciously perform the duties of educating children entrusted by the Education Law, the Law on the Protection of Minors and other relevant laws and regulations, and shall not shift its responsibilities to schools or others.

(2) Party B shall take advantage of the children's time at home to patiently and meticulously educate them on fraud prevention, theft prevention, fire prevention, virus prevention, evil prevention, drowning prevention, gambling prevention, earthquake prevention, riot prevention, invasion prevention, gas prevention and traffic accident prevention; At the same time, children should be educated not to fight or quarrel with classmates, not to smoke, drink or surf the Internet outside school, and not to have controlled knives.

(3) Party B shall actively cooperate with Party A to educate students about safety, and cooperate with Party A to handle safety incidents properly, so as to avoid unreasonable troubles and interfere with the normal education and teaching order of the school, otherwise Party B shall bear corresponding legal responsibilities.

(4) According to "Measures for Handling Student Injury Accidents", "Safety accidents after school and holidays are at your own risk." And "students who leave school without listening to the school's warning will bear the consequences themselves" and "students at school will bear the consequences themselves after school or holidays." And "violation of school discipline causes safety accidents at your own risk", Party B shall educate its children to put an end to the above phenomena.

(5) Party B has the obligation to assist Party A in handling the events related to itself, and has the responsibility to bear the expenses arising therefrom.

(6) If Party B's children climb trees, climb mountains and touch circuits around the campus, causing self-injury, Party B shall bear all medical expenses; If a student is injured, he should take the initiative to contact the parents of the injured student to get their understanding, so that the incident can be solved smoothly and bear all the expenses.

(7) If Party B indulges the children and causes injuries to other students inside and outside the campus, it shall bear all the responsibilities.

(VIII) Party B's children cause safety accidents on and off campus due to improper supervision, such as drinking, swimming, bathing, staying at their home, surfing the Internet, etc. All responsibilities shall be borne by yourself.

(9) If Party B's children are injured at school, Party B shall not collide, beat or insult teachers and students, let alone make trouble without reason, which will affect the normal teaching work of the school, otherwise Party B shall bear corresponding legal responsibilities. Party A has the right to stop and report to the public security and judicial organs for intervention.

(10) If Party B fails to pick up and drop off the under-age children on time, a safety accident will occur on the way to or from school, and the consequences will be at its own risk.

(1 1) In the event of special weather, sandstorm, rainstorm, etc., the school informs the parents of students through the village group and telephone that if Party B fails to fulfill its obligations and causes safety accidents, Party B shall bear all the responsibilities.

(12) According to the relevant regulations, Party B and its children shall be responsible for the safety accidents caused by students' truancy on the way to and from school, provided that Party A's behavior is not improper; In case of a fight, the parents of both sides will solve it by themselves or resort to judicial organs.

(13) If students take poison, commit suicide or self-injury inside and outside the school, or Party B's improper educational methods lead to students' self-injury or running away, Party A shall be responsible for any misconduct.

Three. Dispute and incident mediation

(1) Party A and its superior departments have the right to give priority to handling safety accidents between teachers, students and students.

(two) the occurrence of security disputes or accidents, should be handled by both parties through consultation, consultation fails, by the school to solve; If Party B is not satisfied with the school's handling result, it can go to the local public security organ or judicial organ for mediation.

Four. This agreement is made in triplicate, one for each class, school and parents.

5. This agreement shall take effect from the date of signing until the students finish their studies in our school or leave school halfway.

Party A:

Party B:

Safety Responsibility Agreement Chapter III Organizational Unit: Wushu Association Sanda

Participants: Sanda athletes (and their accompanying personnel)

1. Organized by the above-mentioned units, participants volunteered to take a trip to Mount Tai from April 29th, 20xx to May 29th, 20xx. 1.

Second, this activity is a fitness activity that cultivates sentiment and pleases the body and mind, and there are potential dangers. Participants should be aware of this situation.

3. Participants shall bear the expenses of travelling, accommodation, catering, tickets, etc. in this activity by themselves, which shall be arranged by the Association in a unified way.

Four, the organizer shall bear the responsibility of personal and property safety in collective activities.

5. In collective activities, if the participants fail to obey the unified deployment and management of the person in charge of the activities of the organizational unit, the Association will not bear any responsibility, and the participants themselves will bear the losses and compensation results.

Six, if the participants' personal behavior leads to their own personal or property losses or personal or property damage to a third party, the loss and compensation results shall be borne by the participants themselves.

Seven, after arriving at the destination, if the organization finds that the participants can't complete the activity as required for any reason, it has the right to ask the participants to quit the activity before the end of the activity.

8. Participants who need to withdraw from this activity due to special reasons must inform the organizer and leave only after being confirmed by the organizer. Since the participants declare their withdrawal, they will bear all legal responsibilities.

Nine, participants should obey the organizational arrangements, according to the agreed time to drive, eat and participate in activities.

X. This Agreement is made in duplicate, with each party's responsible person holding one copy. This agreement shall take effect from the date of signature by the participants and the person in charge of the association until the end of this activity.

Participants have known the contents of this agreement, agree to abide by the above terms and conditions, and sign for confirmation:

Head of Sanda:

Wushu Association of Sports Department Free Fight

20xx April 28th

Article 4 of the Safety Responsibility Agreement: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

Party A entrusts Party B to build the construction project. In order to clarify the responsibilities of both parties for production safety and ensure the construction safety, both parties sign this agreement at the same time when signing the construction project contract, which must be strictly implemented by both parties.

I. Overview of the Project:

1, project name:

2. Project address:

3, the scope and content of the subcontract works:

4. Subcontracting form: cleaning (self-provided machinery), and large machinery is provided by Party A..

Second, the project period:

From the date of the month to the completion acceptance.

Three. Agreement content:

1. Party A and Party B must conscientiously implement the guidelines and policies on safety in production and fire protection promulgated by the state and the superior labor protection and safety production departments, and strictly implement the laws, regulations and rules related to labor protection.

2. Party B shall have a safety management organization system, including leaders in charge of production safety at all levels and full-time and part-time safety officers; Each type of work should have safety operation rules, special operators should have qualification examination system, post responsibility system for safety production at all levels and regular safety inspection system.

3. Party B shall carefully survey the site before construction: Party B must wear a safety helmet when entering the construction site; Smoking in designated smoking places; All construction personnel must work in a civilized manner, work and rest in a civilized manner, fasten their seat belts and wear non-slip shoes for aerial work. No drinking and fighting. Once it happens, we have the right to send both parties to the local criminal authorities and investigate the relevant responsibilities of their responsible persons together. If the circumstances are serious, we will be dismissed.

4. The leader of Party B must seriously educate the employees of this unit about the safety production system and safety technology knowledge, enhance the legal concept, improve the employees' awareness of safety production and self-protection, and urge employees to consciously abide by safety disciplines, systems and regulations.

5. Before the construction, Party B shall organize the on-site safety production education meeting and notify Party A to send relevant personnel to attend. Introduce the rules, regulations and requirements related to safety and fire prevention in the construction process, and Party B must check and urge the construction personnel to strictly abide by and conscientiously implement them. Party B must abide by the safety operation rules during the construction and strengthen the safety education for the safety production management personnel. And supervise, inspect and accept each working procedure completed by the relevant supporting groups in the contracted construction area and construction area, and ensure that it is safe and qualified, and there is no construction hidden danger before entering the project construction. Can not meet the construction safety requirements, shall be ordered to rectification team. Only after the rectification is qualified can the project be started.

Migrant workers aged over 55 18 are not allowed to enter the construction site, and diseases such as delusion, heart disease and hypertension are prohibited. Every employee must have the safety awareness of self-safety. In case of any safety accident, Party B shall handle it according to relevant national regulations.

Party B must make disclosure before construction every day, check and ensure that there are no potential safety hazards, and ensure safe production during the operation.

If Party B's constructors fight at the construction site, all economic expenses incurred shall be borne by Party B, and the fine of1000-5,000 yuan shall be borne by Party B and deducted from the project payment.

Strengthen the supervision of dormitory management, prohibit gambling inside and outside the living quarters and dormitories, and regulate the use of electricity in dormitories, prohibit unauthorized access to electricity, use electric blankets, water heaters and a series of illegal acts. Once the project is not found, it will be confiscated and the team will be fined the minimum 200 yuan. If the circumstances are serious, they shall be retired. Any accidents are borne by the team.

6. During the construction period, Party B shall assign comrades to be responsible for the fire safety work of this project; The comrades designated by Party A are responsible for contacting, assisting and urging Party B to implement relevant safety and fire prevention regulations. Party A and Party B should always keep in touch, and the project party should assist in checking the safety and fire prevention work related to the project to prevent accidents.

7. During the construction period, Party B must strictly implement and abide by Party A's safety production and fire prevention management regulations, and accept Party A's supervision, inspection and guidance. Party A has the obligation to assist Party B in safety production and fire prevention management, and urge regular inspection. If any hidden danger is found, Party B must make rectification within a time limit; if Party A violates the rules and regulations on production safety, Party B has the right to require Party A to make rectification.

8. Personal safety protection articles during production and operation shall be provided by Party B, and the construction site personnel shall be urged to wear safety protection articles consciously.

9. Party B's personnel must carefully check their respective construction areas, working environment, operating facilities, equipment, tools and appliances, etc. If hidden dangers are found, the construction should be stopped immediately, and the relevant units can carry out the rectification before construction. Once constructed, it means that the construction unit confirms that the construction site, working environment, facilities, equipment, tools and appliances meet the safety requirements and are in a safe state. The construction unit shall be responsible for the consequences arising in the construction process.

10. Before the erection and installation, Party B's mechanical equipment, scaffolding and other equipment shall not be put into use without acceptance or unqualified acceptance, otherwise the unauthorized users shall be responsible for the consequences.

1 1. Special operations must implement the management measures for safety technology training and assessment of special operations personnel formulated by the state, hold relevant certificates after training and assessment by provincial, municipal and regional special operations safety technology assessment stations, and regularly assess the qualification certificates according to regulations; Small and medium-sized machinery operators must "set the machine and set the person" and operate with certificates according to regulations; Lifting operators must abide by the "ten no-lifting" regulations, and illegal unlicensed operation is strictly prohibited; It is strictly forbidden for people who do not understand electrical appliances and mechanical equipment to operate and use electrical appliances and mechanical equipment without authorization.

12. Party B must strictly implement various fire and explosion prevention systems, and smoking and open flames are strictly prohibited in inflammable and explosive places. Fire fighting equipment is not allowed to be used for other purposes, and it is not allowed to be beaten, damaged or stolen. When using naked flame, it is necessary to go through the three-level hot work examination and approval procedures, and formulate fire prevention supervisors, issue supervision disclosure, and implement supervision measures. Welders must hold valid certificates to work at their posts, and it is forbidden to operate without a license. In the living area, it is forbidden to use electric furnace and iodine tungsten lamp for heating and baking clothes. Do not use liquefied petroleum gas without authorization. Don't pull the wire socket privately, and don't smoke in bed. Electric cookers, electric frying pans and other appliances shall be used in the special rooms designated by Party A..

13. If Party B needs to use the electrical equipment provided by Party A, it should be tested before use. If it does not meet the safety requirements, it should be raised to Party A in time, and Party A should actively rectify it before using it. The unit shall be responsible for the consequences caused by the violation of this regulation or the unauthorized connection of electrical lines without Party A's permission.

14. After signing the construction contract, Party B shall consciously go through the temporary registration formalities at the public security organ of the temporary residence, and go through the construction registration formalities at the safety supervision station of the district (county) Urban Construction Office (Construction Bureau) and the labor protection procuratorate of the Labor Bureau.

15. Implement the principle that whoever works is responsible. In case of casualties, fires, fires and mechanical accidents caused by Party B's personnel during the construction period (including casualties caused by Party A's personnel, other personnel and pedestrians). ), Party A has the obligation to assist in emergency rescue of the wounded, and Party B is responsible for accident report, economic compensation and after-care treatment. Accident losses and after-treatment expenses,

16. This agreement shall come into effect after being signed by representatives of both parties: this agreement is an annex to the original contract in quadruplicate, with Party A holding three copies and Party B holding one copy.

Party A: Party B:

Project Representative: Representative:

ID number: ID number

Tel: Tel:

Date: Date:

Article 5 of the safety responsibility agreement of Party A:

Party B:

In accordance with the Regulations on Safety Management of Explosives for Civil Use, the Rules for Safe Operation of Blasting and the Law on Safe Production, and in combination with the special circumstances of blasting engineering, in order to ensure the safe and smooth construction of the site leveling project of the third phase of Laohukeng Waste Incineration Power Plant and clarify the safety responsibilities, Party A and Party B have signed the following safety agreement through consultation:

I. Project name:

2. Blasting operation time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Blasting warning range: 200m around the blasting point (determined according to the safe distance of blasting flying rocks).

Four. Protection scope of blasting operation: Phase I/Phase II of Laohukeng Waste Incineration Power Plant (including workshop, office building, comprehensive building, internal and external equipment and facilities and personnel) and the central area of Laohukeng Environmental Protection Park (including movable board houses, construction vehicles and construction personnel of the construction unit).

Verb (abbreviation of verb) Rights and obligations of Party A:

1. According to this contract, Party A shall assist Party B in handling licensing matters related to blasting construction.

2. Party A has the right to require Party B's blasting workers to show relevant work certificates to confirm their identity before entering the work; Have the right to stop the illegal behavior of Party B's blasting workers.

3. Party A's personnel shall receive the safety training of blasting operation conducted by Party B, and irrelevant personnel shall not touch explosives.

4. Party A shall assist Party B to organize the coordination meeting of blasting operation and check the alert situation around the blasting area.

Rights and obligations of intransitive verb Party B:

1. Party B shall provide the qualification documents of the blasting company as required by Party A, copies of the special operation certificates and ID cards of the project director, technical director, blaster and safety officer, the approval and filing procedures of the public security bureau and other materials, and report them to the supervisor for approval before blasting operation can be carried out.

2, blasting construction in strict accordance with the "blasting safety regulations" and the relevant provisions of Shenzhen. Before blasting construction, a detailed blasting construction plan should be prepared and implemented after approval by relevant departments.

3. Organize the units within the scope of blasting protection to communicate and coordinate the blasting operation to ensure the smooth progress of blasting construction, and post written notices and safety warning diagrams in the affected units before each blasting.

4. Before the start of blasting, a written safety technical disclosure should be made to explain the safety technical operation method, accident prevention measures and labor protection requirements; The organization design of safety technology construction shall be compiled by Party B and can only be implemented after being approved by the supervisor.

5. Before the stone blasting, the surrounding buildings should be investigated in detail, and the blasting safety evaluation report should be issued, and their respective blasting vibration safety allowable values should be given according to their structural characteristics and national standards. Before blasting, the requirements put forward in the blasting safety evaluation report should be implemented. Organize to monitor the blasting vibration of the protected objects and equipment during blasting, and issue a blasting vibration monitoring report within 3 working days after blasting, and submit it to Party A and the supervisor.

6, strict safety protection measures, to control flying stones, in order to prevent individual flying stones damage the surrounding protection. Strict safety measures should be taken during blasting.

7. Strengthen vigilance before blasting. During blasting, all personnel/vehicles should be evacuated to a safe place before blasting. Warning shall be set for the environmental park road, the second phase road, the construction road in the central area and the temporary road outside the dump truck. The range of blasting warning is determined according to the safe distance of blasting flying stones. Safety warning must be set 30 minutes before blasting. After the cannon is fired, it can only be dismantled after it is confirmed by the on-site blasting personnel.

8, blasting construction strictly abide by the provisions of the regulations on the safety management of civil explosives, blasting construction conforms to the blasting safety regulations. When using blasting equipment, the construction shall be carried out in strict accordance with the safety operation procedures of blasting operation.

9. In strict accordance with the approval of the public security organ and the consent of Party A and the supervisor, the blasting operation shall be carried out within the operation time, and the operation time shall be fixed as far as possible.

10, initiating explosive device management. The storage, transportation and use of explosives shall be strictly in accordance with the relevant provisions of Shenzhen Municipality on civil explosives. The explosives manager of Party B is responsible for the special management of explosives, and the explosives are collected by special personnel, and the collection and use are registered. The unused explosives shall be returned to the warehouse in time, and shall not be stored, left behind or stayed overnight at the site.

1 1. In case of rainstorm, lightning, mountain torrents, typhoons, landslides, road blockages, earthquakes, etc. Or due to national policies and regulations of relevant administrative departments, Party B shall not carry out blasting construction.

Seven. This agreement is made in quadruplicate, with Party A and Party B holding two copies respectively, all of which have the same legal effect. Matters not covered herein shall be handled in accordance with the relevant provisions of the state, province and Shenzhen.

Eight. This agreement shall come into force after being signed and sealed by both parties, and shall automatically become invalid after the blasting operation is completed.

Party A (seal)

Legal representative:

Party B (seal)

Legal representative:

Article 6 of the Safety Responsibility Agreement: Party A (lessor): _ _ _ _ _ _ _ _ _ Party B (lessee): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In accordance with the Contract Law of People's Republic of China (PRC), the Law of People's Republic of China (PRC) on Work Safety and relevant laws and regulations, in order to ensure the safe use and management of the leased house, Party B rents _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. This agreement is an annex of _ _ _ _ _ _ _ _ _ _.

2. According to the house lease contract, Party A shall provide Party B with a house that meets the use conditions of the house. When using the house, Party B must strictly abide by the following contents to ensure the safety of use, otherwise Party A has the right to terminate the contract and hold Party B liable for breach of contract:

1. Do not change the use of the leased house without authorization. Once the lease contract is discovered, Party B shall be liable for breach of contract.

2. The leased house can only be used by the lessee himself, and shall not be sublet, lent or transferred to others. Once found, the lease contract shall be deemed to be terminated immediately, and Party A shall not be liable for breach of contract.

3. It is forbidden to change the building structure and equipment without permission. Simple decoration requires Party A's consent, and unauthorized decoration will be investigated for legal responsibility.

4. sundries and rubbish are not allowed to be piled up in public places. If Party B violates the regulations and has an accident, Party B shall take full responsibility.

5. It is strictly forbidden to use electric furnaces, electric kettles, electric cups and fake wiring boards without automatic power-off protection devices in the leased premises, and it is strictly forbidden to pull wires indiscriminately. If Party B violates the regulations and has an accident, Party B shall take full responsibility. Party B shall take full responsibility for any problems and accidents in the use of household appliances.

6. Be sure to unplug the power plug and turn off the power switch when you go out to ensure the safety of electricity use. If Party B violates the regulations and has an accident, Party B shall take full responsibility.

7. All business premises and factories must be equipped with fire-fighting supplies in accordance with relevant fire-fighting regulations, and violators will be investigated for legal responsibility.

Four. This agreement shall come into force as of the date of signing, in duplicate, with each party holding one copy.

Party A: _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signed on _ _ _ _ _ _ _ _ _

Article 7 of the safety responsibility agreement:

Party A:

Party B:

In order to strengthen the safety management of engineering construction, adhere to the policy of safety first and prevention first, and ensure safe production, it is everyone's responsibility to sign this agreement.

I. Overview of the Project:

1, project name:

2. Scope of work: Party A entrusts Party B with the right to

3. Project location:

2. All construction personnel of Party B must abide by the six disciplines of safe production stipulated by the state, abide by the safety management system of Party A and the provisions of civilized construction on site, and be familiar with and master the safety regulations and operation specifications of this type of work.

3. Party B and its team shall set up a leading group for safety construction, set up full-time safety officers to keep in touch with Party A, conduct safety education for its employees on a regular basis, conduct regular safety construction inspections (especially pre-shift education inspections), and sign safety responsibility letters with employees. If it fails to sign, all consequences arising therefrom shall be borne by Party B. ..

Four. In order to ensure construction safety management and safety responsibility, Party B must designate site management personnel: Party B's project leader: Tel: Party B's site safety leader: Tel:

5. Party B must ensure that all personnel entering the site are at least 18 years old and in good health. Old, weak, sick, disabled, pregnant, family members, children and child laborers are not allowed to enter the site, otherwise all consequences will be borne by Party B, and Party A will not bear any responsibility.

6. Party B must ensure that all employees use protective measures correctly according to regulations, and shall not abuse or use them; When entering the construction site, you must wear a safety helmet. Workers are forbidden to wear slippers, hard-soled shoes, permeable shoes and go to work shirtless. Operators of special types of work are required to hold relevant certificates, and it is forbidden to use those who are undocumented and do not understand electromechanical and equipment operation technology. In case of violation, all responsibilities shall be borne by Party B. ..

7. Party B's off-site construction personnel are prohibited from entering the construction planning area, otherwise all consequences will be borne by Party B. ..

Eight. During the construction period, all teams and individuals of Party B shall enhance their safety awareness and do their own safety protection. Party B shall be responsible for all major and minor accidents, and Party A shall not be responsible. (Note: This clause is applicable to safety accidents caused by various reasons of Party B)

9. During the construction period, if Party B neglects management and causes damage to the third party, Party B shall bear all responsibilities.

10. During the construction period, if Party B's personnel fight with other contractors, the responsibilities shall be borne by each contractor, and Party A will punish them according to the regulations on civilized construction on site.

Eleven, Party B's construction personnel lost or any unsafe incidents, the responsibility shall be borne by Party B, and Party A shall not be responsible.

12. This responsibility book is made in quadruplicate, with each party holding two copies, as an annex to the project contract agreement. Thirteen. If there are any new clauses, they will be attached to this agreement and have the same legal effect as this agreement.

14. This agreement shall come into force as of the date of signature by both parties, and shall automatically become invalid after the completion of contract construction.

Party A (signature): Party B (signature):

Person in charge: person in charge:

Handler:

Contact telephone number:

Date of signature: year month day.

Signing place: Handler: Tel: