Contract mode of gym renovation
Employer (Party A): _ _ _ _ _ _ _ _ _ _ _
Contractor (Party B): _ _ _ _ _ _ _ _ _ _ _
According to the provisions of the People's Republic of China (PRC) Contract Law and the Regulations on Construction and Installation Engineering Contracts, and in combination with the specific conditions of this project, both parties have reached the following agreement.
Article 1: Project overview
1. 1. Project name: _ _ _ _ _ _ _ Gymnasium renovation project.
1.2. Project location: _ _ _ _ _ _ _ gym.
1.3, contract scope: painting the wall, repairing the heating cover, adding the front desk, wrapping the indoor columns, changing the circuit (installing lights directly above the two billiard tables, removing the emergency lights), replacing the damaged doors and locks, repairing the bathroom, preventing the wind, cleaning the lights and air conditioning, etc.
1.4. Contract mode: contract work, contract materials and one-time contract.
1.5. Time limit: this project started on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
1.6, project quality: qualified.
1.7. Contract price (RMB in words): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2: Party A's Work
2. 1. Party B shall be appointed as the professional representative of Party A to be responsible for the implementation. Supervise and inspect the quality and progress of the project, and handle matters such as acceptance and change of registration.
2.2, if it is really necessary to dismantle the building structure or equipment pipeline, responsible for coordinating related matters of relevant departments.
2.3. Party A is responsible for reviewing the engineering calculation of this project.
2.4. The quality in the decoration process is supervised by the Project Supervision Department (9) of Beijing Guodian Desheng Engineering Supervision Co., Ltd. ..
Article 3: Party B's Work
3. 1. Party B shall be responsible for the construction of this project and submit it to Party A for approval.
3.2, strictly implement the construction specifications, safety operation procedures, fire safety regulations, environmental protection regulations, and make the quality inspection records. Participate in the completion acceptance and prepare the project settlement.
3.3. Comply with the regulations of the state or local government and relevant departments on the management of the construction site, properly protect the construction site and prevent the surrounding buildings, equipment and pipelines from being damaged. Do a good job in construction site security and garbage removal, and organize the construction reasonably to avoid the operation department from working normally due to the construction.
3.4. Without the consent of Party A or the approval of relevant departments, the original building structure and various equipment and pipelines shall not be dismantled and changed at will during construction.
3.5 Before the completion of the project is handed over to Party A, be responsible for protecting all facilities and finished products at the site.
Article 4: Time limit agreement
4. 1. Due to Party B's responsibility, the project can't be started on schedule or stopped halfway for no reason, which affects the construction period and can't be postponed.
4.2. As Party A fails to complete the work as agreed, the construction period will be postponed.
Article 5: Agreement on Project Quality and Acceptance
5. 1. Standard stipulates that the acceptance standard of quality evaluation adopts the construction and acceptance standards formulated by countries such as Code for Construction and Acceptance of Building Decoration Engineering (JGJ73-9 1) and Unified Standard for Quality Inspection and Evaluation of Building Installation Engineering (GBJ300-88).
5.2, the quality of this project should meet the national quality evaluation standards.
5.3 In case of quality accidents caused by materials and construction provided by Party B, the cost of rework shall be borne by Party B, and the construction period shall not be postponed.
5.4 After the project construction is completed, Party B shall notify Party A for comprehensive acceptance.
Article 6: Agreement on Project Price and Settlement
6. 1, the project price is based on the total bid price, and the quantity and price are not adjusted.
6.2. Settlement of project price: After both parties agree that the project is completed and accepted, Party B will provide the invoice and Party A will pay all the contract price.
Article 7: Material Supply Agreement
All materials and equipment purchased by Party B shall not be used if they do not meet the quality requirements or have different specifications. If it has been used, Party B shall be responsible for the losses caused to the project.
Article 8: Agreement on Project Warranty Period
The project quality guarantee period is one year, and the start date of the quality guarantee period is the date when the project is accepted. When the project is completed, if Party A has no objection to the project quality, the start date of the quality guarantee period is _ _ _ _ _ _ _ _ _ _.
Article 9: Safety Production and Fire Prevention Agreement
9. 1. During the construction period, Party B shall strictly abide by the Technical Regulations for Safety of Construction and Installation Works, the Safety Operation Regulations for Construction and Installation Workers, the People's Republic of China (PRC) Fire Protection Regulations and other relevant laws and regulations.
9.2. In the process of construction and production, if Party B violates relevant safety operation regulations and fire regulations, resulting in safety or fire accidents, Party B shall bear all economic losses.
Article 10: Liability for breach of contract
10. 1. If the completion is overdue due to Party B's reasons, Party B shall pay Party A a penalty of 500 yuan/day for each day overdue.
10.2. Without the consent of Party A, Party B dismantles and changes the original building structure or equipment pipeline without authorization, and the losses or accidents (including fines) caused thereby shall be borne by Party B. ..
10.3. If one party cannot continue to perform the contract due to reasons, it shall notify the other party to handle the contract termination agreement, and the responsible party shall compensate the other party for the economic losses caused thereby.
Article 1 1: dispute or dispute settlement
1 1. 1. In case of any dispute during the performance of this contract, both parties can settle it through negotiation or ask the relevant departments for mediation without affecting the progress of the project.
1 1.2. If both parties are unwilling to settle the dispute through negotiation or mediation, or negotiation or mediation fails, both parties agree that the dispute arising from the performance of this contract shall be arbitrated by the arbitration commission (if both parties have not agreed on an arbitration institution in this contract and have not reached a written arbitration agreement afterwards, they may bring a lawsuit to the people's court).
Article 12: Supplementary Articles
12.1,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
12.2. This contract will be automatically terminated upon completion of performance.
12.3, annex (related drawings and descriptions)
Party A: _ _ _ _ _ _ (seal) Party B: _ _ _ _ _ _ (seal)
Contact information: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Contact information: _ _ _ _ _ _ _ _ _ _ _
Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _