2, and then from the corner for laying, laying process, attention should be paid to the wooden floor and the corner straight down to reserve a gap of about one centimeter, so as to avoid the problem of wood floor expansion and contraction in the later period.
3. Finally, install the baseboard, remember to be as flat as possible with the ground.
It is very important to clean the place where the composite floor is laid, including every corner of the floor, because if the floor is not cleaned, there will be a "rustling" feeling under the floor in the future. Then level the ground. The horizontal error should not exceed 2mm. If it exceeds 2mm, you must find a way to level it. If the floor on which the floor is installed is uneven, the foot feeling after the floor is paved will certainly be bad. Then the protruding or uneven parts of the ground, such as edges and corners, are trimmed.
Villa master provides you with local architectural policies, architectural drawings and villa design drawings;
Villa appearance rendering service, you can choose from thousands of red-hot drawings: www.bieshu.com? bdfc