What is the housing standard of Shunyi self-occupied commercial housing?
1. external wall: high-grade external wall paint is adopted, with 2 layers of natural stone (full 1.5 layer), and grille is installed outside the outdoor unit of air conditioner (architectural style).
2. Entrance lobby: the floor and wall are made of vitrified bricks, with local suspended ceiling and luxurious lighting, and the elevator door cover on the first floor is made of stone.
3. Stairs: glazed tiles are pasted on the ground, and there is no ceiling. The ceiling and interior walls are made of environmentally friendly paint or latex paint, and the stairwell is provided with voice-activated switches, ceiling lamps and wooden handrails.
4. Elevator: There is no elevator.
5. Main entrance: steel security door with mechanical lock.
6. Interior wall: the indoor load-bearing wall is the original structural wall, the indoor rear wall is a plastered brick wall, and the wall and ceiling are plastered.
7. Frame structure villa: the amount of steel bars shall not exceed 70 kg/m _; The dosage of concrete shall not exceed 0.6 kg/m _.
8. Power supply system: dual power supply system is used in residential area, and 380V distribution box is used for air conditioning. Each household is equipped with an independent electric meter (common time-sharing electric meter), and the living room, kitchen, bathroom and bedroom of each household are equipped with ordinary three-hole or five-hole sockets and switch panels.
9. Water supply system: each household is equipped with an independent water meter (with remote meter reading), each household is equipped with a faucet, and the work balcony and bathroom are all equipped with water pipes.
10, gas supply system: independent electricity meter for each household, with reserved pipelines.
Can Shunyi self-occupied commercial housing be checked out if it is unqualified?
1. If you want to check out after buying a house, you must meet the check-out conditions. According to the provisions of the judicial interpretation, if the developer fails to perform within a reasonable period of three months after being urged by the buyer, the buyer has the right to ask the developer to return the house and demand a refund of the deposit or interest on the house payment.
2. In the contract signed between the buyer and the developer, it is generally agreed that the developer must obtain the buyer's consent to change the design, otherwise the developer will breach the contract and the buyer has the right to return the house, and the developer will change the house type, orientation and area without the buyer's consent. The buyer can ask the developer to return a house according to the contract.
3. If the developer's documents are incomplete, it is illegal to operate, and the contract signed with the buyer is invalid. Because it is an invalid contract, the developer should return the house payment paid by the buyer. According to the new judicial interpretation, because the quality of the house seriously affects the normal living and use, the buyer can ask for the return of the house and ask the developer to compensate for the losses.