Current location - Health Preservation Learning Network - Fitness coach - The builder's annual work summary
The builder's annual work summary
No matter what position you are in, you should review your work after one year. The following is my annual work summary, builder, for your reference only. Welcome to reading.

Summary of the annual work (1) The contractor has been in the company for nearly a year from xx, and has gradually integrated into this big family with the guidance and help of department leaders and colleagues. As a contractor, I have mainly completed the following work:

I. Commercial aspects

1. Successfully reissued the xx Club Project Completion Acceptance Certificate.

In order to improve the completion procedures of the clubhouse, relevant procedures have been completed since xx. Because there are many departments involved, the information provided must meet the requirements of relevant departments. The project development department and the engineering department have done a good job of sorting out the information and coordinated and communicated with the Urban Construction Bureau, the Environmental Protection Bureau, the Construction Management Office and the archives department for many times. After unremitting efforts, they finally obtained the project completion acceptance certificate at the end of xx, and all the completion materials were complete.

2. Run four pre-sale certificates in advance.

In order to cooperate with the pre-sale of housing in some stages of the market, an important task of the project development department in xx month is to handle four pre-sale certificates for xx building. According to the requirements of the real estate bureau, after submitting the application materials on xx, I went to the real estate bureau for supervision and tracking almost every day, and actively communicated with the staff of the real estate bureau. With the assistance of General Manager X, the certificate was finally issued on xx. At present, the handling of ***xx sets of pre-sale certificates of xxxx Building has been completed, which ensures the smooth development of marketing work.

3. Assist the leaders to prepare for the land reserve in the courtyard.

The new project is the key project newly launched by the Group in 20xx. In the early stage, we had many coordination and communication with the District Land and Resources Bureau, the Municipal Land and Resources Bureau and the village committee. , and obtained information such as land area, topography, etc., mastered the location and number of households behind the village yard, and made all preparations for land delisting next year.

4. handle the "two certificates in one" of the three certificates.

According to the latest requirements of the government, land certificates and real estate licenses need to be "integrated". After coordination and communication and data preparation, online registration and filing have been completed.

In addition, we are actively coordinating with Xinao Gas, Chengyang Radio and Television Bureau, municipal drainage and other units, and are handling natural gas construction, cable TV network access, municipal drainage and other matters for the fourth phase and business port projects, so as to make good preparations for the supporting construction of the projects.

Second, corporate culture.

At the beginning of xx, actively participate in the X Group Sports Meeting and assist in the conference work; In xx years, I participated in donating clothes to poor areas in xx; After nearly two months, with the care and help of department leaders and colleagues, we have adapted to the new working environment and feel that our big family is young and full of vitality, and our work is efficient and pragmatic.

Third, work experience and shortcomings

1, working experience

(1) Establish various pre-data directories for easy reference;

(2) Statistically summarize the development data of each project of the Group, so as to systematize the data of each project, but the table needs to be improved.

2. Disadvantages

(1) The approval details are not skilled enough. For example, when issuing a check for the pre-sale certificate, the bank that opened the account did not communicate with the real estate office in advance, and the check of China Bank arrived one day later than that of the credit union; For another example, the time to receive the check should be approved by the leaders of the real estate bureau. In the future work, we should speed up the study of the previous procedures and charging standards and master them skillfully.

(2) Coordination ability still needs to be honed and improved. The work of applying for approval and construction is often in contact with government departments, which requires high coordination ability. Usually, we should first master the previous business knowledge, consult and communicate with leading colleagues, pay attention to ways and means when communicating with government departments, and constantly sum up experience in practice.

Four. Key work in 20xx years

1, new project land listing and preliminary procedures for approval and construction;

2. Preliminary work such as in-depth investigation of Pingdu project;

3. Handle the municipal supporting procedures for the commercial building project and the fourth phase project.

The Project Development Department is the "pioneer" of the Group's real estate development business, and the application for construction is the key work of the Project Development Department. I will do my job in a down-to-earth manner, speed up the study of professional skills, provide policy analysis and land listing information for leaders in time, and complete the supporting procedures for projects under construction. Thank the leaders for their careful guidance and help in my work, and ask them to be strict in their future work. If there is anything wrong, please criticize and correct me.

Annual Work Summary (II) The contractor has been in company X for many years, during which he has experienced ups and downs, but he is even more grateful to the company, because he not only increased his knowledge, skills and methods in his work, but also broadened his thinking. These are valuable life wealth and will benefit him for life. In the new year, only by reviewing the past and summing up the work of the year can we sum up our own shortcomings, have a brand-new plan for the work of the coming year, complete the work tasks more accurately, efficiently and in time, and climb to another height. The work of the past year is summarized as follows:

First, the office daily work

1, xx to xx in 20xx, and the main work contents are all kinds of information summary, the filing work of the Housing Authority of the "xxxx" project and the application for the use of pre-sale funds for the project. During this period, I also participated in matters related to the handling of land certificates in the early stage of the "xxxx" project, laying a certain foundation for the construction of the "xxxx" project at this stage.

While collecting all kinds of information for leaders, I have also mastered a lot of information, which can further grasp the market, broaden my thinking and accumulate some knowledge in all aspects. The related work of "Shi Sheng Taoyuan" project not only made me familiar with the process, but also exercised my coordination ability.

2. Since xx month of 20xx, the work has mainly focused on the construction application of "xxxx" project and the internal administrative affairs of the company. With the help of the leader, I tried my best, despite the constant interlude.

Strive to make the project obtain the state-owned land use right certificate and the construction land planning permit successively. At the same time, the preparatory work for the follow-up work of the project has been completed, and the ability to write official documents has been further improved.

Reviewing the application process of project construction, there are many procedures, and it is very important to make overall arrangements. This requires that before doing something, we should fully understand all the related matters behind it, so that we can do it in one step, look at a few more steps and prioritize. Only in this way can we finish the task efficiently and quickly. It is true that the work still needs meticulous attitude, and the preparation of materials is also the most important. Therefore, under the premise that all materials needed by relevant departments are fully prepared, all relevant materials are still carried at the same time to prepare for emergencies and improve work efficiency.

3. Filing work. Ensure that all the examination and approval materials, relevant certificates and bills obtained by the company and the project are filed and recorded in time, and at the same time, the copies are backed up to ensure the accuracy, completeness and convenience of the materials.

Two. 20xx work plan

The first task in xxxx is to obtain the planning permit and construction permit for the construction project. At this stage, the relevant materials for leapfrog development, capital verification and approval by the National Development and Reform Commission have been sorted out completely. After the design scheme and construction drawing are completed, follow-up matters can be started, including the approval of relevant departments such as civil air defense, lightning protection and fire protection. In the new year, I will sum up my experience and lessons, give full play to my strengths, strengthen my study, and complete all the tasks assigned by my leaders with a more positive attitude and higher efficiency-to survive by grades!

Third, the existing problems and the direction of future efforts

In 20xx, although the task was successfully completed, it was inseparable from the strong support of leaders and colleagues, and it was also the result of the joint efforts of all colleagues in the office. However, after careful study,

Over the years, there are still many shortcomings:

1, the initiative and consciousness of learning need to be strengthened. We should not only be satisfied with the knowledge we have at present, but also master more comprehensive political theory knowledge through further study, dabble in a wider range of cultural knowledge, and make our work by going up one flight of stairs.

2. There is impatience at work, and the style of modesty and prudence needs to be further strengthened to avoid impatience, improve cultural literacy and maintain a good attitude. The so-called details determine success or failure, and personality determines fate.

3. The ability of external public relations and coordination needs to be further improved.

In the past X years, I have gone through different posts, each of which is conscientious, hard-working and has made some achievements. Summing up the past is to learn from the past and do better in the future. Leaders and colleagues are also invited to criticize and correct the shortcomings and deficiencies in the work. At the same time, I also earnestly hope that the company will develop more vigorously in the future, and I will continue to do my best to create brilliant achievements for the company.

Annual Work Summary (III) Organizer Since the beginning of this year, under the correct leadership of the district committee and government and the guidance of the higher-level business departments, our bureau has conscientiously implemented the spirit of the municipal urban construction work and the economic work conference of the district committee, closely focused on the three good development strategies and the target assessment tasks assigned by the city, aiming at striving for the first-class work performance in the city, and made concerted efforts and made good achievements throughout the year. The situation is summarized as follows:

I. Overview of work

(1) Urban construction work

1, intensify efforts to set off an upsurge of upgrading and reconstruction of the old city.

This year, the old city has been upgraded and transformed by xxx square kilometers, involving X streets, a township, * * * communities and a square, with emphasis on the old factory, the old city and the old market. Among them, xx Factory, xx Railway, xx Li and xx Street; Xx Road, xx Road, xx Road, east to xx Health School; In the south, it starts from xx Bridge in the north, reaches xx Community in the south, and reaches xx Community and xx Railway in the west. The renovation work was completed at the beginning of xx, with an investment of xx million yuan, and the roads in the renovation area were leveled, connected, lighted and beautified. Among them, the demolition of nearly xx square meters is unprecedented, especially in xx Street, xx Community and xx Road. , not only widened the road surface, but also opened up a number of fire exits.

At the same time, according to the arrangement of the Municipal Housing and Construction Bureau, our bureau will arrange professionals to join the street community to make a detailed diagnosis of the situation that five small facilities (small green space, Little Square, small parking lot, small public toilet and small fitness field) need to be built in the urban area, and establish a ledger. Unified planning and design with high standard and high starting point, highlighting the characteristics of Zhu Hui, involving five streets of Yuehan, Dongfeng, Metallurgy, Yuedong and Nursery, with an area of ***xx square meters. The icing on the cake has greatly enriched the effect of upgrading urban infrastructure.

According to the work arrangement of the municipal government to further improve the urban infrastructure construction, 10, our bureau organized professionals to make detailed investigations on the sidewalks of xx Road, xx Road, xx Road, xx Road and xx Road * * * to verify the maintenance and renovation of sidewalks on primary and secondary roads, the allocation of garbage bins, parking spaces for motor vehicles and non-motor vehicles, and the amount of greening. 10, the sidewalks near xxx restaurant were comprehensively upgraded, and the effect was fully affirmed by the municipal government, which provided a model for the comprehensive upgrading of sidewalks in our district. At present, the transformation of xx Road, xx Road, xx Road and xx Road has been completed, and xx Road, xx Road and xxx Road are under construction. Except for xx Road, it is expected to be fully completed by the end of xx.

During my visit to this area, our bureau arranged professional field research for the major urban construction problems to be solved in xx, and combined with other urban construction problems collected during the visit, and formed targeted solutions. Under the deployment of the district government, we arranged a professional construction team to enter the site for construction, and all of them were solved at the end of X, which was warmly thanked by the residents.

2. Make an all-round attack to create a livable city with beautiful environment.

In the urban greening week activities at the beginning of this year, combined with the channel greening activities, more than xxx camphor trees with a diameter of xx cm were planted every X meters around the primary and secondary trunk roads in towns and villages such as xx Road, XX Road and xxxx National Road in our district, with a planting area of XX kilometers and an investment of xxx million yuan, which completed more than half of the city's channel greening tasks. Planting osmanthus xx, Cinnamomum camphora xx, peach xx, cherry xx, willow xx, poplar XX, heather xxx and shrub ㎡ in Jincai Institute of Technology. In the transformation of the old city, the investment of xxx community is xx million yuan, and the green area is xx square meters; The investment of five small facilities is xx million yuan, and the green area is xxx square meters.

At the beginning of X, our bureau conducted a comprehensive inventory of dead trees, endangered trees and eliminated tree species in X street of the city. After the street community declaration and on-site verification by the Bureau Greening Office, xx trees were preliminarily determined, including: xx trees in xx street, 4 trees in xx street, X trees in xx street and X trees in xx street. Most of these trees are dead trees in residential areas, which are eaten by insects and other reasons, causing death and may collapse at any time, posing a great threat to the safety of surrounding residents. Bureau leaders attached great importance to it, held a special meeting to study and deploy the work, and all the dangerous trees of xx were cleared at the end of May.

In xx years, our bureau conducted a comprehensive investigation on the green belts on both sides of the main and secondary roads in the whole region, and planned to improve the soil and replant the empty and barren flower beds. The planned upgrading area is about xxx square meters. At present, the green belt of Dongfeng North Road has been upgraded to xx square meters. After the design scheme is approved by the municipal government, it will be fully promoted and is expected to be completed around xx.

3. Take measures to ensure the comprehensive coverage of housing security.

At the beginning of this year, our bureau continued to do a good job in the data verification and examination and approval of the new objects of low-rent housing rental subsidies, and handled the "Housing Security Certificate for Urban Low-income Families" for the tenants, and conducted a comprehensive review and clean-up of the previously handled rental subsidies. All objects with incomplete information and excessive housing income will be cancelled, and the entry and exit mechanism of low-rent housing rental subsidies will be strictly implemented, and the examination and approval will be carried out. By the end of the third quarter, the whole district * * * has distributed subsidies for low-rent housing to xx households and added subsidies to xx households, completing the task of 3xxx households and adding xx households throughout the year issued by the municipal government ahead of schedule.

Accelerate the construction of low-rent housing and public rental housing. There are two low-rent housing and public rental housing projects located in our district at the city level: Zhu 'an Home and Hengzhou Home, which are under construction and continued construction. Zhu An homestead land acquisition and demolition has been completed, and Hengzhou homestead land acquisition has been completed. The first standard house has been demolished and the second standard house is under negotiation, which will not directly affect the project construction. The construction of the two projects is the responsibility of the municipal urban construction investment. At present, the xx house in Anjiayuan has been completed in three dimensions; The drilling and land leveling of Hengzhou Home have been completed, and the planning and design adjustment has been put in place. The next step will be to start the construction of housing infrastructure.

The renovation of dilapidated houses in rural areas is progressing smoothly. At the beginning of X, the reconstruction function of rural dilapidated buildings in the whole region was officially transferred from the District Civil Affairs Bureau to our bureau. After full investigation, the task indicators of this year's xx rural dilapidated houses renovation are as follows: XXX: X; Xx township: xx households; Xx Town: xx households; Xx Town: xx households. Among them, xx households were newly built and X households were repaired and reinforced. At present, xx households have been fully completed.

Conduct extensive research in the whole region to deeply understand the present situation and difficulties of the transformation of xx District and xx District. According to the determined transformation idea, our bureau has compiled the distribution table of public houses directly under the jurisdiction of the whole region and the shantytown reconstruction project library. After the municipal government's transformation planning and policies are promulgated, our district will give full and sufficient preferential policies for the transformation of old urban areas and shanty towns, improve the environmental quality of new residential areas as much as possible, and enhance the image of our district.

(2), the main practices and achievements

1, leaders do their own work, pay close attention to responsibilities and set the tone for the overall work. In order to do a good job in greening projects, housing security and upgrading and transformation of the old city every year, the district party committee and government make unified arrangements, and NPC and CPPCC supervise and support them. A work leading group with overall responsibility for the top leaders of the district party and government has been set up to study and formulate work implementation plans and clarify the division of responsibilities. Especially in the upgrading of the old city, in order to tamp down the tasks layer by layer, carry out the responsibilities, ensure the high-standard and high-quality completion of various projects, implement the joint leadership responsibility system, and each bid section shall be specifically responsible by a bureau team leader and a builder, stick to their posts all day, be responsible for contradiction coordination, quality supervision and progress supervision, and earnestly implement a project, a team and a grasp to the end. At the same time, they will hold regular briefings every Saturday and irregular dispatching meetings.

2. Integrate the scientific supervision of all forces to ensure the quality of the project. In the process of upgrading and rebuilding the old city, the district committee and government insisted on treating small projects as big projects, strictly following procedures, keeping a close eye on quality, and truly achieving popular support projects, quality projects and image projects, so that the transformation results can benefit thousands of households. First, strictly implement the project bidding. The establishment of the bidding team is supervised by the District Commission for Discipline Inspection, Supervision Bureau, Audit Bureau, Finance Bureau, Development and Reform Bureau and Housing and Construction Bureau. After strict examination, a qualified, qualified and professional construction team was selected. The second is to strictly implement construction standardization. Led by the District Housing and Construction Bureau, the competent leader and the builder supervise the construction unit on site. The construction must be carried out in strict accordance with the specifications of the construction design drawings, so as to ensure that the thickness of the project entity, cement grade, pavement smoothness and slope meet the reconstruction standards, and the reconstruction projects that violate the construction procedures and fail to meet the requirements are resolutely required to be reworked. The third is to strictly do the acceptance work. Invite CPPCC, NPC deputies, mass representatives and other personnel to organize and set up inspection teams, strictly control the quality of the project, supervise the construction operation irregularly, participate in the completion acceptance, and review the qualified rate and satisfaction of the project from different angles.

3. Make every effort to build a high-quality demonstration area, laying the foundation stone for the point-to-area. In this year's upgrading and reconstruction of the old city, the basic strategy is to highlight the key points, from point to area, so that the work is focused, the task is heavy and the results are bright. Model projects and highlight projects such as xx Community and xx Li Community have been built, and old city reconstruction projects have entered resettlement areas for relocated households, enterprise production areas, railway residential areas and old city residential areas. During the renovation, the daily needs of residents in the community were fully considered. Based on the people-oriented principle, according to the actual situation of some renovation areas, basketball courts, fitness fields and leisure areas were added in the community, so that residents could have another good place for fitness and leisure in a clean environment.

4. Strive to meet the reasonable demands of the masses and establish a good reputation for people's livelihood projects. In the renovation and upgrading work, we should adhere to the principle of combining humanized design with civilized construction, adhere to engineering design standards, and actively take care of the demands of community residents. First, take the initiative to solicit and adopt the reasonable suggestions of the masses before construction, and transform the path leading to the residents' door to facilitate residents' travel. For example, Anjuli Road and Safety Lane directly pave the cement pavement to the door of every household; Second, in the construction process, people's life and travel needs should be considered as much as possible, safety warning signs should be set up, construction time should be controlled reasonably, and high-power and high-decibel instruments should be avoided, so as to achieve safe production and civilized construction, such as the sewer renovation in Hehuaping. As the excavation depth of the road surface reaches X meters, in order to ensure safety, isolation belts should be set up throughout the road section, warning lights should be hung, and special personnel should be arranged to patrol in the morning and evening to ensure that no safety accidents will occur. The third is to help solve some supporting constructions that are convenient for the masses and can meet the requirements of community residents for improving the community environment, such as painting walls around roads and residential coal houses in Quanxi Village and rearranging community flower beds. In addition, actively report to the municipal government and strive for funds to solve the hot and difficult problems that are strongly reflected by the daily masses and try their best to help solve them. If you invest xx million yuan to dredge and transform unplanned sewers such as xx Library, xx Primary School Gate, xx Primary School Intersection, xx No.4 Middle School and Anjuli XX; Invested xx million yuan to completely transform Jianxiang Road (unplanned), * * * paved xx meters of asphalt and installed xx street lamps, which completely improved the road conditions and opened the road bottleneck leading to xx factory, xx regiment and xx area; Strive for the municipal government to install xx street lamps for Heping District and Miaopu Road, which are not included in the planning, and invest xx million yuan. Through the hard work of construction workers day and night, the road in front of the people is paved, the lights outside the window are on, the traffic jam has stopped, the rain has stopped, and the city has become beautiful. The people have paid tribute to each other, actively supported the transformation work, and sent banners and good news to thank the district party Committee and government for many times.

Second, the existing problems and suggestions

(1) Problems in the management system.

1, the problem of clear rights and responsibilities in railway areas. The nursery street in our district covers an area of xx square kilometers, with xx communities and a permanent population of xx million, including about xx million railway workers and their families, accounting for xx% of the total population. It is a street in our district and a typical railway street. With the overall reorganization of the railway system, railway sub-bureaus and railway offices have been evacuated. The infrastructure construction of this street is seriously inadequate, and the urban management is greatly weakened, especially the management of Guangming Street. Although the municipal government has completely transformed this road several years ago, the urban construction management function of the nursery area is not clear, which leads to the lack of maintenance and management of this road in the later stage. At present, residents have reported to the local government the problems that need maintenance, such as damaged roads, blocked sewers and missing manhole covers, and asked the government to solve them. However, the main body of ownership in this area belongs to the railway department, and the management and maintenance of municipal facilities are the responsibility of the local government, and the ownership and responsibility are not unified. Moreover, in the process of upgrading the nursery area, residents do not understand and do not cooperate from time to time. In order to solve this chaotic situation and optimize the living environment in an all-round way, it is suggested that the functions of urban management and sanitation in the nursery area should be handed over to the local government as soon as possible, and the management system should be straightened out to completely change the present situation of the nursery area.

2. Problems existing in the construction and management of drainage facilities. In recent years, due to imperfect drainage facilities, there are many problems of sewer blockage and siltation. In the renovation and maintenance, due to the lack of supervision, developers pay insufficient attention to the construction of supporting facilities, and the drainage facilities of some development projects are not perfect in function and are not in harmony with the surrounding drainage system, which is easy to cause sewer blockage and bring inconvenience to residents' lives. Originally, the problem should be solved by the developer, but because some' projects have been delayed for a long time, the developer can't find them, or they have found them, and the people have to find the local government to solve them, which makes the work of our bureau more difficult. Therefore, we suggest whether the city government can play its role in the development and construction of urban construction projects. It is stipulated that the District Housing and Construction Bureau shall assist the Municipal Housing and Construction Bureau and the Municipal Planning Bureau in the management of drainage facilities for all construction projects developed in Zhuhui District. After the completion of the project, after confirming the signing of the opinions of the Municipal Housing and Construction Bureau, it will be submitted to the relevant departments directly under the municipal government for approval. This can better ensure the matching of new projects and reduce the pressure brought by various contradictions to the district government.