I stayed in the company for nearly half a year, and made great progress from 20 to 2008 with the strong leadership and care support of the company leaders. In the process of work, I successfully completed the annual work target for 20-2008. Personal work in 20 10 is summarized as follows:
I. Annual Work Situation
1, familiar with the rules and regulations of the company.
I joined the company on1October 20th. In order to better integrate into the company team and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.
2. Be familiar with the structure and site conditions of the project.
As a civil engineer, being familiar with and understanding the site is quite beneficial to the future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.
3. Participate in the modification of the management system of the engineering department.
In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, referred to the relevant systems of well-known real estate enterprises such as ABO, and compiled and revised various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.
4. Analyze the weather situation in 20-20 10.
In order to complete the company's 20-year project development task and formulate scientific and practical 20-year work content and project construction progress plan, I analyzed the meteorological conditions for 20 years and predicted the meteorological conditions for 20 years in combination with the perennial meteorological conditions in Wuzhi County. At the same time, I combine the weather conditions and the progress of the project, make reasonable adjustments to the progress of the project and grasp the construction season.
Second, the existing shortcomings and improvement measures
Blowing in the wind will be in 2008. Looking back on my work in the company in the past six months, although the workload is relatively large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:
1, lack of communication, unable to make full use of resources.
In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with colleagues in other departments, share resources through the company's platform, and improve my business level.
2. Lack of planning
In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.
3. The major is narrow.
As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.
2. Summary of personal work of construction engineer
Due to the company's manpower deployment, I was transferred to the project as a civil engineer at the beginning of the year. With the help and guidance of my project colleagues, I completed my work wholeheartedly. Now I will briefly summarize my work and study in the past year as follows:
First, clear job responsibilities.
Responsible for the acceptance of engineering divisions, disciplines and inspection lots; Responsible for compiling and summarizing project supervision logs and supervision data; Conduct a comprehensive inspection of the key construction parts of the site and the station, report the quality and safety problems to the director in time, and take corresponding solutions. Responsible for on-site quality management, collecting, sorting and saving data management materials. Responsible for auditing budget, settlement, construction organization design, various construction schemes, material plans, on-site visas, design changes, etc. Responsible for on-site communication and written data transmission with the company and design institute on matters such as joint review of drawings, design change, slot inspection and subject acceptance. Responsible for coordinating the construction problems of the general contractor and subcontractors.
Second, the daily work
In the process of building construction, the main responsibility is to check the installation of labor and materials on site and report to the leaders regularly every day. If quality problems are found, they should be corrected in time and reported to the leaders. Coordinate the construction problems of subcontractors and general contractors. Responsible for household acceptance and handover before property delivery. In the process of hardcover construction, he is mainly responsible for the design change of the construction model room, and conveys the relevant technical requirements of the company to the hardcover unit, and is responsible for reviewing and reporting the bathroom waterproof scheme and ceiling scheme. Responsible for the division, disciplines and inspection lot acceptance of two buildings. In the process of hardcover construction, he is mainly responsible for the audit of construction organization design, the budget audit and report of steel sandwich engineering quantity of the Fourth Bureau. Responsible for contacting designers to prepare valuable drawings. Responsible for the acceptance of ceiling keel, waterproof construction, kitchen and bathroom tiling, facade insulation and wall plastering on the construction site.
Third, find the shortcomings
Combined with the quality problems of engineering quality, problems such as ceiling cracking, toilet leakage, moldy wallpaper and alkali stone in the bathroom can be avoided during the construction of the first area, and the problem of ceiling cracking has been communicated. Double plasterboard is used in the design, and reinforcement measures are taken for weak parts. The problem of toilet leakage has required the construction unit to report the scheme separately. In the cushion construction, steel wire mesh is used to strengthen the wall root, and the buried pipe construction is strictly required to avoid the brick sticking error caused by ultra-high buried pipe. When the waterproof construction is accepted, notify the regional engineer to carry out multi-party acceptance of the project, and strictly require the waterproof thickness and height; In the process of sticking bricks, the project engineer is required to stand by and avoid damaging the waterproof layer. The problem of uneven wallpaper requires strict acceptance of wall foundation construction. The problem of stone flashing requires you to strictly control the materials entering the site.
3. Summary of personal work of construction engineer
This year is my second full year as an office worker. Civil engineer is my first job and a starting point of my career. I also cherish it and try to adapt to this position. Through a year of continuous learning and the help of colleagues and leaders, I have fully integrated into this big family, and my personal work skills have also been significantly improved. Although there are still some shortcomings in my work, it should be said that I have paid a lot and gained a lot in the past year, and I feel that I have gradually grown up. The work in 2008 is summarized as follows:
First, after my unremitting efforts over the past year,
Completed the collation and handover of the construction data of the first and second phases, the landscape and greening work of the second phase, the preparatory work for the early start of the group, and the work delivered by the company leaders such as the group model house project.
1, collation and handover of construction data of Phase I and Phase II projects
In the first half of this year, the second phase of the project was successfully delivered to the owner. Before the handover of the project, the construction data must be sorted out and handed over. I carefully checked and consulted the construction materials of each building, and made every effort to ensure no leakage, no shortage, neat catalogue and complete information. Before handing over the second phase of the project, I will prepare all the floor plans, warranty certificates and instructions for use of Building 13 in advance, and fully guarantee the owner when handing over the house. All the filing materials of Building No.2 13 were sorted by myself, and all the sorting work was successfully completed before the handover under the guidance of the leaders. After the delivery of the house, due to the excessive and important information, it needs to be handed over to the company's archives for safekeeping. At the time of handover, I will rearrange more than 100 boxes of data of 30 buildings in Phase I and Phase II, so that each one is recorded, and any information can be found in a directory. During the period, I spent a lot of energy and nearly a month, and finally I didn't live up to the leadership's entrustment. All the materials have been rearranged
2. Landscape greening project of Phase II project
At the beginning of the year, I took over the landscape greening work of the second phase project. Compared with modern residential areas, the proportion of landscaping work is very small, but it is of great significance. It is indispensable for modern new living areas. Due to full preparation, the second phase of landscape greening is progressing smoothly.
However, in the later acceptance process, the change of seedling size brought great trouble to our acceptance work. Finally, I cooperated with the technical department to check the types, quantities and specifications of all seedlings in place. Finally successfully completed the work entrusted by the leaders.
3. Engineering
At the beginning of September, I received instructions from the leader. It is necessary to set up a model house for C. In the 20-2000 national real estate recession, the company leaders formed a group to start construction and build this new apartment, which is a microcosm of the company's wise decision. Its quality directly affects the sales performance after the opening of three-dimensional superposition, and it is also a new measure of the company after the sales situation of Group B is not optimistic this year. Its success or failure directly affects the success or failure of the company this year.
After receiving the instructions from the leader, I quickly threw myself into practical work. In order to achieve the expected effect, I positioned and paid off three times in two days, and finally achieved the expected effect of the leader. In the process of construction, I am not afraid of hard work, work hard and strive to get to work on the spot. After work, I need to work overtime many times because of the project. Later, due to the intervention of decoration companies, this requires good coordination and organizational skills. Try to deal with the friction and contradiction between the two sides in the construction process. Finally, the model house project was successfully completed before the opening. It has made due contributions to the company's impressive sales performance and turning losses into profits after opening.
After the successful opening, I cooperated with the technical department. Participated in the final accounts of the later model houses.
Second, the past year's work experience
1, keep a good attitude and a positive working attitude. As a member of "",I consciously abide by the company's rules and regulations and obey the work arrangements of my superiors; With absolute loyalty to the company, put into all the work, take the company's business as your own, and actively think about site construction management and coordination according to the actual situation on site, instead of waiting for the leader to arrange it. Invest in all work as a master, and maintain the company's image and interests from being damaged.
2. Integrate yourself into the company, and rely on the collective wisdom and strength to complete all the work. In many of the work I have completed this year, I have received support and help from leaders and colleagues at all levels.
3. After one year's work, I found that I still have many shortcomings: I don't have enough management in dealing with on-site affairs at work; I haven't been too careful in dealing with these problems, and I will pay more attention to overcoming them in the new 20 years.
20-2008 is a year of exploration, learning and progress for me. Faced with different work contents, I put my mind right, give full play to the initiative of my supervisor and think positively. In such a year, I enriched myself through my own labor and broadened my horizons through the opportunities given to me by my leaders.
4. Summary of personal work of construction engineer
Looking back on the next 20 years, I have been in the company for more than a year. With the strong guidance and care support of the leaders of the company and departments, and in the working environment full of harmonious cooperation atmosphere between the company and departments, at the same time, with unremitting efforts and enterprising attitude, I have successfully completed various tasks and performed my duties well, which has enabled me to gain fruitful results, joy and happiness in my work, life and friendship, and also found many of my own existence. Personal work in 2000 is summarized as follows:
First, be familiar with the company's rules and regulations.
In the process of entering the project engineering department of the company, I will quickly integrate into this team, master the company's various rules and regulations and corporate culture, and be familiar with the department management system. Through understanding and familiarity, I feel lucky to be able to enter this team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to be responsible in my work, have a serious and responsible spirit, have certain organization and coordination ability, be able to integrate theory with practice, dare to innovate and complete the task faster and better.
Second, the project engineering management
After working as a civil engineer in the engineering department, I was responsible for the specific division of labor-the second bid section of residential engineering. The main task is to define the project organization and management system, determine the objectives and tasks of project management, ensure the project quality, safety and progress objectives, strengthen the control of the construction process, abide by the project management procedures, and perform the duties of the civil engineer of the engineering department. With the cooperation of the company's leaders and departments, the construction of residential projects has been carried out smoothly, and the project management summarizes the progress of the project construction and the difficult issues to be solved through the regular meeting of the departments.
Participate in weekly supervision meetings, collect weekly reports on quality, safety and progress, listen to the next work plan of the construction party, coordinate all work and solve contradictions in daily construction. Take the way of examining the supervision company, mobilize the enthusiasm and initiative of the supervision, and give full play to the supervision role of the supervisors on the construction process and key parts. Often go deep into the construction site inspection, strengthen the communication between the engineering department and the construction party, and timely and effectively control the quality, progress, cost, safety and civilization of the project.
Three, complete the annual major engineering work
At the beginning of construction, in the face of the current situation of insufficient investment by the main construction unit of the project, the engineering department repeatedly emphasized the overall construction period, construction period nodes and year-end project progress targets at the regular meeting of project supervision, focusing on the serious shortage of important personnel such as steel workers, bricklayers and carpenters in on-site construction, and urged the construction unit to replenish personnel in time. Before the project starts, the engineering department requires the construction unit to prepare a detailed construction progress plan according to the site conditions, the contract period and the comprehensive strength of each unit's own machinery and labor force, and gradually refine and decompose the construction progress plan into weekly plan, monthly plan and annual plan. The approved schedule is the basis of construction schedule control. The completion of the unit project schedule should be reported at the weekly project supervision meeting, including the completion of last week's schedule and the plan for next week. If there is any delay, the construction unit should put forward the reasons for the delay and the remedial measures that can be taken.
Summing up the past, I got the care of the company and department leaders and successfully completed various tasks; Looking forward to the future, I will continue to learn, strengthen my ability in all aspects and make continuous progress on the company's high-quality platform. The project will continue next year, and the project quality and safety management has a long way to go. How to manage the company's projects with high quality, high efficiency, safety and civilization is a subject that civil engineers should consider and a challenge to me.
5. Summary of personal work of construction engineer
I have been in the company for almost a year. Under the strong leadership and care support of the company leaders, I made great progress in 2000-2008. Personal work in 20 10 is summarized as follows:
I. Annual Work Situation
In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.
As an engineer, being familiar with and understanding the site is quite beneficial for future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.
In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, and referred to the relevant systems of other well-known real estate enterprises to sort out and revise the various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.
Second, the existing shortcomings and improvement measures
In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with colleagues in other departments, share resources through the company's platform, and improve my business level.
In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.
As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.
Third, measures and suggestions to complete the target plan
Contract plays an important role in project management. Without it, project management is impossible, and contract is the basis of project management. Familiar with the contract. And conduct in-depth and detailed research on the contract, and be aware of key terms, loopholes, possible changes and disputes. Establish a strong sense of contract. Before the contract is signed, the status of the owner and the contractor is equal. The project manager does not use force to force the contractor to accept conditions other than the contract; Be alert to the trap laid by the contractor in the process of project implementation.
When the contractor puts forward various suggestions, the first thing he thinks of is to abide by the contract and fully estimate the possible economic problems caused by adopting the suggestions. Schedule control is one of the key factors for project success. What the engineering department should do is to prepare the project management plan, study the overall progress, construction layout, main construction technologies and construction problems of the project, and make plans for possible problems in the project implementation process. Formulate a system, standardize management and improve work efficiency.
In the future work, as the vanguard of project development, I will conscientiously implement the relevant regulations of the company, give full play to my subjective initiative, restrain myself with iron discipline, constantly learn new technologies and experiences, and be good at summing up. I also hope that the company leaders can give me more understanding and support, and strive to contribute to the development of the project.