Suzhou integrated wall production address integrated wall installation strategy
Let's explain the installation strategy of Suzhou integrated wall production address for everyone.

Suzhou integrated wall production address is based on the actual measurement of all areas of integrated wall. This is the approximate area of the wall to be measured, including the surface and upper surface of the wall to be installed, and calculated. The roof surface of the house is at least two meters above the ground. After determining the installation position of the keel, install the waterline and power supply, so as to switch the interface socket and leave the direction and size of the water pipe on the floor.

When installing the integrated wall, fix the keel first. The first product is on the wall. Nails should be nailed to the wall and products should be fixed to the wall. The integrated products on the back are fixed on the previously installed integrated wall products, and then fixed with nails. When placed, it depends on whether the general products on the wall are beautiful and flat. First, you can divide the wall, then sharpen the cable and install it according to the design drawing. If the first product is installed, it is directly related to a series of subsequent installations.

After the installation of the integrated wall is completed, it can be installed on the integrated line of main wall materials and wall decoration for installation and large-scale installation, and then the corner and surface treatment of the wall are carried out. End of line. If there are pillars on the wall, be sure to insert them into the back of the wall to install integrated wall products and wrap the pillars.

When installing integrated wall products, please follow the layout of Suzhou integrated wall production address from the bottom of the wall to the top of the wall. If you have a socket cord installed in your home, you must install the motherboard before installing the product.

Steps to install the built-in wall The installation sequence of the room starts from the bedroom door (decoration negotiation bedroom), and the construction is relatively easy. Finally installed, if necessary, it is easy to cut and the overall appearance will be more beautiful.

Many integrated wall products on the market will be installed in different ways. The production address of Suzhou integrated wall is the same as the whole, so follow the above method.