The system consists of 36 data items, divided into 7 categories, each category has a simple code, which is easy to use and understand. Each data item has a constant TMU value. There is also a set of sewing code initial forming rules and sewing formulas in the system to help calculate the machine time. GSD has become the standard of method analysis and time research in sewing industry. This is a multi-level and multi-purpose system. It can be used to evaluate all operations, including cutting, sewing, ironing, inspection and packaging. Suitable for small batch, large batch and continuous process.
Crystal boy is an idol group at the ancestor level in Korea. Unfortunately, after its dissolution in 2000, its members de