2022 Equipment Maintenance Worker's Work Summary 1
In this year's workshop maintenance, we also accumulated a lot of valuable equipment maintenance experience, and reserved a large number of maintenance cases for future maintenance work. Maintenance technicians get practical training through maintenance, and operators have a better understanding of various technical parameters of the equipment. In order to sum up experience and find out shortcomings, the completion of this overhaul task is summarized as follows.
First, it is well organized and well prepared.
This overhaul involves many maintenance parts, complex equipment and many inspectors. In order to ensure the smooth implementation of the maintenance plan, before the whole line is shut down, the _ _ workshop will be fully responsible for the work coordination and the implementation of the on-site supervision plan during the maintenance under the specific guidance of the company's maintenance headquarters, and assign safety personnel, logistics support personnel, publicity reporters and on-site organization leaders to be responsible for the safety supervision, logistics support, publicity and technical operation during the maintenance.
Before parking, members of the workshop maintenance leading group enter the scheduled site in advance to inspect, supervise and coordinate the cleaning, debugging and safety precautions of all parts after parking. It is emphasized that after cleaning a part, the maintenance personnel enter a part, and the cleaning work must be rapid, safe, timely and thorough, leaving no dead ends to prevent repeated cleaning and affecting the maintenance progress. Designate a special person to clean the key cleaning parts, define the cleaning standard, define the completion time limit and emphasize the matters needing attention; Communicate with the material warehouse in advance to ensure that the tools and instruments needed for cleaning are complete on time. Do a good job of receiving and distributing safety precautions, heatstroke prevention and cooling supplies and medicines in advance, and do a good job of propaganda and agitation before maintenance in advance.
In order to ensure the orderly development of maintenance, before the implementation of maintenance, the _ _ workshop instructed the maintenance team to carry out the division of labor and responsibility for all the equipment to be repaired according to the characteristics of the project, which is specific to people. Show the maintenance progress of the project, implement the plan, report the completion and evaluate the effect. It is also stipulated that an inspection progress review meeting will be held every afternoon during the inspection to summarize and evaluate the project progress, problems encountered and emergencies of that day.
Second, the measures are effective and orderly.
According to the maintenance characteristics of each project, the workshop formulated many corresponding flexible measures during the implementation of the overhaul plan, which effectively accelerated the construction progress and ensured the maintenance quality. It is difficult to clean the anticorrosive rubber lining of alkalization tower in pre-bleaching post, and the cleaning standard is high, and the space is narrow, so it is impossible for many people to clean it at the same time. In order to speed up the cleaning progress and ensure the cleaning effect, the overhaul leading group decided to implement shift cleaning. After three days of intense cleaning, it finally completed the cleaning work to a high standard.
During the maintenance of the balloon reducer, due to the long-term operation and tight connection, the company's existing equipment is not enough to disassemble. The maintenance leading group made a decisive decision to transport the equipment out of the factory and disassemble it with external special equipment, thus ensuring timely replacement and reassembly. This steam ball is newly installed in the workshop. Because the civil engineering has not been completed, the accessory parts cannot be installed and debugged at one time. Therefore, the maintenance leading group decided to adopt the installation strategy of synchronous construction and two-way installation. At the end of the overhaul, large auxiliary equipment such as driving motor and propeller have been installed.
Safety work during maintenance is an arduous task. Due to the need of welding, the number of fires in the workshop suddenly increased than usual. In order to ensure safety, _ _ workshop implements on-site tracking supervision to strictly investigate fire hazards. Effectively put an end to potential safety accidents and create a safe and stable working environment for maintenance. Actively do a good job in the collection, storage and distribution of heatstroke prevention and cooling materials, and strive to do a good job in logistics support for employees during maintenance. Effectively played the role of spiritual encouragement.
Third, the overall situation consciousness, cooperation spirit and strong cooperation consciousness.
As the workshop is the main position of this overhaul, the workshop maintenance workers were ordered to come to the workshop to assist in the work, which fully reflected the valuable spirit of taking the overall situation into account and regardless of gains and losses. In completing the task, they obey the assignment of their superiors with a high attitude, set strict standards on themselves, and complete the task with high quality, which has made important contributions to the workshop overhaul. During the overhaul, they also launched a positive labor competition with _ _ workshop maintenance workers in terms of style, progress, quality and safety.
Technical backbones give full play to their personal technical expertise without reservation and act as pioneers in maintenance work. It can be said that during the whole overhaul period, the cadres and workers in the workshop explained the team spirit of "the teacher of the tiger and the wolf" with practical actions. No one flinches from difficulties, no one compromises in front of tasks, and no one cuts corners to find another shortcut in completing tasks. It shows the gratifying achievements of _ _ workshop in team building.
Fourth, the effect of the test results, using quality to express the results.
Although the overhaul is only one year before the workshop is completed and put into production, the potential problems of the original equipment have been fully exposed in one year's production and use. In order to improve the effective utilization rate of equipment and truly reflect the value for money, all the cadres and workers in the workshop worked together to carry out technical research and re-examine the utilization rate of existing equipment, and successively decided to implement motor slimming, sizing pipeline transformation, refining tank pipeline transformation, and redesigned and transformed the spray pipe of the feed separator, which made the resource allocation more reasonable and further improved the production environment.
All these achievements can not be achieved without the kind and caring guidance of company leaders. While making gratifying achievements, we should also be soberly aware that through this annual system inspection, our work has also exposed many problems and deficiencies, which need our attention in future work and remind us that we must make great efforts to correct them.
Individual personnel lack a sense of collective honor, poor sense of teamwork, and lack due passion for their work. They procrastinate when they can, rely on when they can, have leadership and leadership, and have leadership without leadership. When the assigned task is completed, find a place to hide. The leader can't find him, and he won't take the initiative to find the leader. Individual team leaders have poor organizational skills, don't know what to do with the tasks assigned by their superiors, don't know what standards to achieve, set a bad example, don't do it by themselves, just talk without doing it, can't tell the priorities of their work, and don't care about the overall situation in the local area;
The professional skills of a few maintenance workers need to be further strengthened. The same job, different people have different progress and different qualities. In the future work, we should also strengthen the skills training of maintenance practitioners in order to have better performance in similar work in the future; Individual personnel have weak safety awareness. In the case of cross-operation and many dangerous factors at the maintenance site, a few people completely ignored the warnings and reminders of the safety officer, and still went their own way, without wearing protective clothing and tools, and completely regarded the company's safety system as a joke; A few people don't have a strong sense of saving, and they can use the new ones instead of the old ones, which wastes a lot of resources artificially.
We should focus on overcoming and solving the above problems in the future equipment maintenance work, strive to carry forward the mainstream, curb thoughts and behaviors that are detrimental to the company's interests and image, and comprehensively promote the pace of workshop construction.
Summary of Equipment Maintenance Workers' Work in 2022 II
Time flies and 20 years are coming to an end. In this year, under the correct guidance of the group company and the project leaders, and with the close cooperation and solidarity of all departments, the tasks assigned by the company leaders were successfully completed, ensuring the safe operation of all equipment in the park. We have made some good achievements and contributed to the completion of the company's quality objectives. In order to sum up experience and promote the work in 2000 to a new level, the year-end summary of property maintenance workers in 2000 is as follows:
First, complete the daily work
1 and 20 * * completed about 1485 zero maintenance works, including public * * areas, owner maintenance and merchant maintenance. Get praise and recognition from owners and businesses.
2. Strengthen on-site management, supervise the construction of residential decoration units in accordance with the rules and regulations of the management office, without affecting the city appearance and safety management of the residential area, and construct the central air-conditioning and fire-fighting pipes of shops in accordance with technical specifications to ensure the normal operation of the central air-conditioning system and fire-fighting system.
In March and April, the post responsibilities and work flow were revised again, and on this basis, the work records and equipment operation records were improved, and the post responsibilities were implemented.
4. Copy the water and electricity meter every month, and collect monthly water and electricity billing and management fees in cooperation with finance.
5. The fire exits in Building A and Building B were rebuilt. The original ring lights and electronic ballasts cost about 30 yuan each. The cost of energy-saving lamps after renovation is about 10 yuan, and the renovation quantity is about 160.
6. Answer: For the renovation of corridor lights in Building B, the original 36W integrated exhaust lamp cost about one lamp in 35 yuan, and the cost of energy-saving lamps after renovation is about 10 yuan, and the number of renovation units is 325.
7. Assist in the transformation of the store's electricity capacity expansion line. (such as; 2nd Floor, Postal Bank, Rural Commercial Bank and Huayin Company (202,210,219)
8. Noise treatment of pumps on the first floor of the International Bank. The vibration and noise in the use of domestic water pump house make many owners in Building A complain that the noise of water pump seriously affects their quality of life. This problem has been solved through the transformation of the environmental protection bureau and the construction unit.
9. The underground garage entrance and exit exchange project and outdoor parking lot shall be equipped with sentry boxes and gates. speed bump/hump
10. During the thunderstorm, timely dredge the garbage in the open ditch pipeline in residential areas and do a good job in flood drainage and flood control.
Second, the building renovation
According to the company's deployment, with the consent of the group company, the engineering department successfully completed all the construction tasks assigned by the company, saving costs for the company.
1, office decoration on the first floor, safety management department and engineering department.
2. Pour cement on the pavement at the entrance of the underground garage.
3. Laying barrier-free access at the entrance of the sightseeing elevator hall.
4. The green belt in front of the shops on the first floor is paved with blue bricks.
The lawn next to the 5.02 post was changed into a gravel road.
Third, the maintenance of equipment and facilities.
At present, the overall situation of community equipment maintenance is still there. All equipment is maintained according to the equipment maintenance instructions, and daily inspection is carried out, and it is in good working condition at present.
1, complete the operation, maintenance and cleaning of equipment in Daxia core power distribution room in strict accordance with the requirements of operation and maintenance specifications of power distribution system and with reference to the annual work plan. At the same time, the bus duct in the distribution pipeline shaft of each floor should be maintained regularly.
2. Update of elevator inspection method. In view of the frequent elevator accidents, this paper analyzes and summarizes the phenomena not found in the inspection by the engineering department, and improves and perfects the original inspection method. On the basis of the inspection of the original machine room and elevator main engine, the inspection of ride comfort, stability and noise was strengthened, and the car roof operation observation and pit inspection were carried out. Supervise the maintenance unit to improve the maintenance level and eliminate hidden dangers. Strengthen the follow-up supervision of elevator maintenance, so that Yinye International 10 elevator can successfully pass the annual inspection of the elevator by the Bureau of Quality and Technical Supervision and obtain the elevator safety certificate.
3. Do a good job in the daily management of building fire-fighting facilities in strict accordance with the regulations on fire control, and conduct a comprehensive overhaul and antirust refueling of fire-fighting equipment. Standardize the maintenance of fire control facilities and equipment. In order to make emergency lights and evacuation indication system work normally, ensure that every evacuation indicator light, safety indicator light and corridor emergency indicator light is on after the fire, so as to guide the owner (user) to carry out emergency evacuation in an orderly manner and reduce casualties, the Maintenance Regulations for Emergency Lights and Evacuation Indication System is specially formulated and corresponding record forms are issued to standardize the maintenance of emergency lights and evacuation indication system. Find defective lamps in time and carry out maintenance to further improve the operation reliability of fire control facilities and equipment.
4. Maintenance of central air conditioning equipment, monthly cleaning of ceiling cooling tower and chilled water pipeline. Investigate 180 coil fans in one or three stores every month, and repair 12 coil air ducts with different problems. In June, derusting and painting were carried out on the cooling water pipes in the machine room and ceiling, which improved the safe operation performance of the equipment and ensured the normal supply of refrigeration in summer.
5. The generator should be maintained once a month. During maintenance, the operation should be started for 15 minutes to ensure rapid power generation in case of power failure.
6. Check the domestic water pump room twice a day to ensure the safe operation of the equipment and create a good living environment for the owner.
7. Maintenance of weak current equipment, comprehensively clean up the weak current tube wells in the building, and cooperate with telecom, China Mobile, China Unicom and other companies to install, repair and maintain the equipment.
8. Summary of nodes prone to problems. Because most of the failures of facilities and equipment are caused by the damage of some important components, such as the failure of water supply system is caused by check valves, solenoid valves and liquid level meters, the failure of burning motor is caused by the damage of AC contactors, and the failure of elevators is caused by various contactors of optical film, door crane, leveler and control cabinet. Each maintenance department is required to gradually establish an equipment failure account, summarize the nodes prone to problems, be aware of them, strengthen the maintenance of this part and improve the safety of facilities and equipment.
Looking back on this year's work and looking forward to next year, we are happy with the company's impressive achievements and full of hope for its future. All the staff in our department have the determination and confidence to work more professionally and pragmatically and strive to create better results.
Summary of Equipment Maintenance Work in 2022 3
In the past year, with the help of leaders, through the joint efforts of workers and colleagues, as well as my own positive efforts, I successfully completed my work as an equipment repairman. I will make a serious summary of my work in the past year.
I. Work attitude
I love my job, strictly demand myself, abide by all the rules and regulations of the factory, strictly demand myself, put my work in the right position, and always maintain a "modest, cautious, self-disciplined and positive" working attitude. With the care and guidance of the leaders and the help of my colleagues, I always study hard, make positive progress, strive to improve myself, always work hard, complete my tasks seriously, perform my duties well, constantly strengthen my study and strengthen my responsibilities.
Second, do a good job.
As a mechanic, we should have a clear understanding of our work, and be familiar with and skilled in our work. It is necessary to have an understanding of all mechanical equipment, and also have the ability to deal with failures, and deal with possible equipment failures at any time to meet the needs of production progress. Equipment failures often occur in our unit. My years of experience tell me that in maintenance, I will try my best to study anything I don't understand. Once I understood it, I suddenly realized that it looked complicated. As long as I understand, it's easy. I not only undertake the work of equipment maintenance, but also complete a lot of tooling production. I feel very honored. I am grateful to the leaders for giving me such a platform, and I am also excited that my labor achievements have played a role.
These will make me work harder, learn from others modestly and cautiously, improve my working ability as much as possible, let myself play the biggest role in my post, complete my work faster and more efficiently, and also make our unit get the maximum benefit, so that my work and the workers' gains can reach a balance, which will make me more motivated and confident.
Interpersonal relationship with other colleagues is also very important, because a person's ability is limited, and all success depends on collective wisdom, so unity with colleagues is the premise of successfully completing the tasks assigned by the leaders, which is not only work, but also in daily life, so unity with other colleagues is not only a personal matter but also an obligation of work! In our work, mutual cooperation greatly improves our efficiency. We work collectively, cooperate with each other, take the initiative to attack and finish the task quickly. This is the power of unity. Only by exerting everyone's strength can we make the work progress faster.
Third, review the past and look forward to the future.
Regarding the gains and losses in the past, I will learn from the favorable factors, strengthen my working ability, and exclude the unfavorable factors from my future work. A year's work has made me make some achievements on the road of continuous progress for remanufacturing. I believe that through my efforts, the cooperation of my colleagues and the guidance of my leaders, I will become an excellent employee, give full play to my abilities, and thank my leaders for giving me this suitable post, so that I can make due contributions to society.
In the past year, I did my best. I believe that in my future work, I will continue to work hard for the development of remanufacturing and the improvement of employees' income. Although there are still many unsatisfactory places in my work this year, I believe that as long as I stay in my post for one day, I will try my best to put all my energy and ability into my work, and I believe I can do it well! Ensure the normal production and operation of the company.
Summary of Equipment Maintenance Work in 2022 4
Time flies, and 20__ years are coming to an end. First of all, I would like to thank the company for affirming my work and promoting me to be the head of the engineering department. During this year, under the correct guidance of the group company and project leaders, and with the close cooperation and unity of all departments, all tasks assigned by the company leaders were successfully completed, ensuring the safe operation of all equipment in the park. We have made some achievements and contributed to the completion of the company's quality objectives. In order to sum up experience and push the work in 20__ years to a new level, the year-end summary of property maintenance workers in 20__ years is as follows:
First, complete the daily work
1, 20 * * Complete about _ _ _ zero maintenance work, including public * * * areas, owners' maintenance, merchants' maintenance, etc. Get praise and recognition from owners and businesses.
2. Strengthen on-site management, supervise the construction of residential decoration units in accordance with the rules and regulations of the management office, without affecting the city appearance and safety management of the residential area, and construct the central air-conditioning and fire-fighting pipes of shops in accordance with technical specifications to ensure the normal operation of the central air-conditioning system and fire-fighting system.
In March and April, the post responsibilities and work flow were revised again, and on this basis, the work records and equipment operation records were improved, and the post responsibilities were implemented.
4. Copy the water and electricity meter every month, and collect monthly water and electricity billing and management fees in cooperation with finance.
5. Renovation of fire exits in Buildings A and B, the original ring lights and electronic ballasts are about one set in 30 yuan. After renovation, the cost of energy-saving lamps is about _ _ yuan, and the number of renovation is about _ _.
6. Renovating the corridor lights in Building A and Building B .. The original 36W integrated exhaust light is about one in 35 yuan. After renovation, the energy-saving lamps are about _ _ yuan, and the number of renovation is _ _.
7. Assist in the transformation of the store's electricity capacity expansion line.
8. Noise treatment of pumps on the first floor of the International Bank. The vibration and noise in the use of domestic water pump house make many owners in Building A complain that the noise of water pump seriously affects their quality of life. This problem has been solved through the transformation of the environmental protection bureau and the construction unit.
9. The underground garage entrance and exit exchange project and the open-air parking lot shall be provided with booths, gates and speed bumps.
10. During the thunderstorm, timely dredge the garbage in the open ditch pipeline in residential areas and do a good job in flood drainage and flood control.
1 1. Follow up the maintenance of the remaining projects in the community. Repair cracks, water leaks, doors and windows, etc. )
Second, the building renovation
According to the company's deployment, with the consent of the group company, the engineering department successfully completed all the construction tasks assigned by the company, saving costs for the company.
1, office decoration on the first floor, safety management department and engineering department.
2. Pour cement on the pavement at the entrance of the underground garage.
3. Laying barrier-free access at the entrance of the sightseeing elevator hall.
4. The green belt in front of the shops on the first floor is paved with blue bricks.
The lawn next to the 5.02 post was changed into a gravel road.
Third, the maintenance of equipment and facilities.
At present, the overall situation of community equipment maintenance is still there. All equipment is maintained according to the equipment maintenance instructions, and daily inspection is carried out, and it is in good working condition at present.
1, complete the operation, maintenance and cleaning of the equipment in Daxia core power distribution room in strict accordance with the requirements of operation and maintenance specifications of power distribution system and with reference to the year. At the same time, the bus duct in the distribution pipeline shaft of each floor should be maintained regularly.
2. Update of elevator inspection method. In view of the frequent elevator accidents, this paper analyzes and summarizes the phenomena not found in the inspection by the engineering department, and improves and perfects the original inspection method. On the basis of the inspection of the original machine room and elevator main engine, the inspection of ride comfort, stability and noise was strengthened, and the car roof operation observation and pit inspection were carried out. Supervise the maintenance unit to improve the maintenance level and eliminate hidden dangers. Strengthen the follow-up supervision of elevator maintenance, so that Yinye International 10 elevator can successfully pass the annual inspection of the elevator by the Bureau of Quality and Technical Supervision and obtain the elevator safety certificate.
3. Do a good job in the daily management of building fire-fighting facilities in strict accordance with the regulations on fire control, and conduct a comprehensive overhaul and antirust refueling of fire-fighting equipment. Standardize the maintenance of fire control facilities and equipment. In order to make emergency lights and evacuation indication system work normally, ensure that every evacuation indicator light, safety indicator light and corridor emergency indicator light is on after the fire, so as to guide the owner (user) to carry out emergency evacuation in an orderly manner and reduce casualties, the Maintenance Regulations for Emergency Lights and Evacuation Indication System is specially formulated and corresponding record forms are issued to standardize the maintenance of emergency lights and evacuation indication system. Find defective lamps in time and carry out maintenance to further improve the operation reliability of fire control facilities and equipment.
4. Maintenance of central air conditioning equipment, monthly cleaning of ceiling cooling tower and chilled water pipeline. Every month, we will investigate _ _ coil fans in one to three stores and repair _ _ coil air ducts with different problems. In June, derusting and painting were carried out on the cooling water pipes in the machine room and ceiling, which improved the safe operation performance of the equipment and ensured the normal supply of refrigeration in summer.
5. The generator should be maintained once a month. During maintenance, the operation should be started for 15 minutes to ensure rapid power generation in case of power failure.
6. Check the domestic water pump room twice a day to ensure the safe operation of the equipment and create a good living environment for the owner.
7. Maintenance of weak current equipment, comprehensively clean up the weak current tube wells in the building, and cooperate with telecom, China Mobile, China Unicom and other companies to install, repair and maintain the equipment.
8. Summary of nodes prone to problems. Because most of the failures of facilities and equipment are caused by the damage of some important components, such as the failure of water supply system is caused by check valves, solenoid valves and liquid level meters, the failure of burning motor is caused by the damage of AC contactors, and the failure of elevators is caused by various contactors of optical film, door crane, leveler and control cabinet. Each maintenance department is required to gradually establish an equipment failure account, summarize the nodes prone to problems, be aware of them, strengthen the maintenance of this part and improve the safety of facilities and equipment.
Do a good job and establish a global concept
How time flies! A year's work will soon be history again. 20__ years have passed quickly, and 20__ years are coming soon. The new year means a new starting point, new opportunities, new challenges and the determination to "make persistent efforts to a higher level". We must strive to create a new situation in our work. As a plumber and maintainer of Guangming Textile Co., Ltd., I know the importance of "doing my job well and establishing the overall situation concept". 20__, I will finish my work better and ensure the normal operation of water, electricity and various equipment in the factory.
First, strengthen inspection and timely maintenance.
Doing well and strengthening the operation and maintenance of hydropower and related equipment at ordinary times can effectively reduce the incidence of faults. Timely maintenance and troubleshooting to avoid affecting the whole production due to circuit damage or equipment failure. When troubleshooting, analyze the causes and put forward matters needing attention, reduce the failure repetition rate and have a global awareness. Only by doing these tasks well at ordinary times can we ensure the smooth production situation.
Second, the operation is safe and the cost is saved.
Establish and strengthen the awareness of safe production, and operate in strict accordance with the operation and maintenance process in daily work to ensure safety. For some parts or components that can be repaired at ordinary times, try to repair them, some parts or tools should be made by yourself, some can be disassembled for use, and they can be used next time they break down, and so on.
In short, we should do our job well in work practice and establish the overall concept. In order to better serve Guangming Textile, I wish you success in your work and a better tomorrow!
Summary of Equipment Maintenance Work in 2022 5
In a blink of an eye, 20__ years have passed, and it is quite gratifying to look back on one year's work. The following is a summary of my year's work:
First, work.
My work in kindergarten covers a wide range, including maintenance, greening, safety and so on. Because I have some work experience and skills, the work goes smoothly. I regularly check the hydropower facilities of each shift, and timely repair and replace the damaged and aging facilities. Therefore, ensure that the kindergarten water and electricity are unimpeded (except for power failure and water supply, of course); Every morning, I will open the doors of each class and the doors and windows of a professional classroom and corridor on time, and then close them one by one at night to check the closing of classroom appliances. This ensures the safety of kindergartens and the waste of resources; I also managed, watered and cleaned the greening in the garden regularly or irregularly, making the greening in the kindergarten neat and beautiful, and making teachers and children happy physically and mentally. Because I live in a kindergarten, I work as a "bodyguard" in the kindergarten every night, and sometimes I patrol with a flashlight to defend our kindergarten!
I have a clear conscience in the process of doing my job well!
Second, the understanding of the work
While doing my job well, I also accepted other jobs arranged by the director. Be a "cook" for the teachers who live in the canteen at night, and be responsible for heating meals, washing dishes and cleaning tables and chairs for the teachers; I also went to the teacher's dormitory to check and maintain the electricity, water and safety facilities in the dormitory, and helped the teacher move and many other trivial tasks. I think these tasks are as important as my work in the kindergarten. Because the teachers are safe and comfortable, the work in the kindergarten can be carried out more orderly, and the development of our garden will be faster and better! Therefore, I have no problem with these tasks.
Third, feelings and suggestions
In recent years, the hardware construction of kindergartens has been developing continuously, which not only puts forward higher standards for architectural modeling, plane layout, supporting facilities and outdoor environment. , but also have higher requirements for the application of electrical appliances. At present, electricity consumption in kindergartens not only increases the power supply capacity, but also adds many new contents to improve the functions of kindergartens. However, I think our awareness of safe use of electricity should be improved. There are still differences in the awareness of safe use of electricity among faculty and staff in the park. Some experienced teachers have a strong sense of safe use of electricity, and take the initiative to cut off the electrical power supply in their classes on weekends and holidays, and can take the initiative to ask for elimination when they find hidden dangers. Individual employees have poor awareness of safe use of electricity and need to be urged and reminded frequently; Education on safe use of electricity for young children is still lacking.
My work for 20 years has been summed up. Although I am satisfied with my work, I know there are still many shortcomings in my work. Please correct me in time. For the safe development of kindergarten, I will do my best to do a good job.
2022 Equipment Maintenance Worker Work Summary Related Articles:
★ Summary of maintenance work (selected 10)
★ 2022 Staff Personal Work Summary (General 10)
★ 10 2022 Selected articles on personal annual work summary of electricians.
★15 model essay on work summary report in 2022
★ Workshop production annual work summary in 2022 10.
★ 10 2022 year-end summary model of factory workshop
★ Latest Selection 10 Staff Work Summary in 2022.
★ 10 Maintenance Worker's Confirmation Summary
★ Latest 10 Machine Maintenance Personal Work Summary
★ Work summary of maintenance engineer (selected 10)