It has been reported before
It is understood that in order to speed up the development of Zibo Dongyue Economic Development Zone, Huantai County has proposed the relocation and reconstruction project of Tangshan Chemical Industry Park, and plans to resettle 2,323 households in five villages: Qiandawang Village, Houdawang Village, Wang Ba Village, Li Xing Village and Dongying Village. According to the unified planning and layout of Tangshan Town, after all the resettlement sites (Louer Village) are demolished, it is planned to complete the preliminary work such as survey and demarcation, feasibility report preparation and so on by the end of 20191kloc-0/; After the relevant planning and the old house demolition agreement are passed and signed, it is planned to start the demolition of five villages in Tangshan Town Park at the end of March 2020, and grant people rental subsidies; After all the demolition is completed at the end of June 2020, the resettlement community will be completed in September 20021year to meet the occupancy conditions. The above steps are interlocking and need to be connected before and after, so that the village relocation work in the park can be carried out in an orderly manner.
Due to the different opinions of the people in Lou Er Village, some villagers' compensation requirements exceeded the standard. At present, there are more than 90 houses in Lou Er Village that have not been demolished. Due to the slow progress in the demolition of the old village of Lou Er Village, the preparatory work such as survey and demarcation cannot be carried out normally. At the same time, the index of construction land is uncertain, which makes it impossible to handle land and construction procedures, thus slowing down the relocation and resettlement process of the whole village in the park.
2065438+June 2009, Huantai County shantytown renovation leading group adjusted its thinking in time and decided to change the relocation location to Xingwang Village and guo jia cun in Tangshan Town. Due to the change of resettlement sites, it is necessary to declare new construction land indicators. At present, the approval procedures for land use have not been passed, which leads to a series of follow-up work such as survey and demarcation, detailed planning and drawing design lagging behind. In order to promote the relocation work, Huantai County set up a special work class, defined the lead department, and consolidated the responsibilities between the county and town departments. Up to now, all the old houses in guo jia cun have been demolished, and the formalities for obtaining land certificates in Xingwang Village have been reported. It is estimated that the land formalities will be completed by the end of April 2020. It is estimated that by the end of 2022, the village relocation and resettlement houses in Zibo Dongyue Economic Development Zone will all be completed and capped.
[extended data]
In the next step, Huantai County Housing Security Affairs Center will do the following work: First, urge relevant departments to speed up land procedures; Second, after the construction land index is approved, the project planning and design scheme and construction drawing will be made immediately; Third, the old village relocation working group in Tangshan Town will dock with the relocated village, hold various meetings at the village level, study and formulate the implementation plan, resettlement plan and compensation agreement for the relocation of the old village, and carry out household work. Strive to start the resettlement project in early July and start the village demolition work at the same time.