Current location - Health Preservation Learning Network - Slimming men and women - How to make glass putty by yourself
How to make glass putty by yourself
Question 1: How to make oily glass putty Oily putty is made of varnish, rosin water, body pigment and a small amount of water and calcium sulfate. Its weight ratio is as follows: calcium sulfate (gypsum powder) 62.5%, varnish 15.5%, rosin water 18% and water 4%. Add pigment according to the color of the sample. When preparing oily putty, varnish and rosin water should be mixed in proportion and added to gypsum powder, and a proper amount of pigment should be added while stirring. After being made into putty, let it stand for 8 hours to fully mix gypsum powder with varnish and pigment.

Question 2: What should glass putty be made of to prevent it from falling off easily? There are two best substitutes for glass putty.

1, silicone weatherproof and mildewproof glass glue. 2. Structural adhesive.

They are characterized by high viscosity and high and low temperature resistance, which is due to outdoor sealing and bonding.

Due to different grades or different prices, their weather resistance is also different. When you buy it, the word' weather resistance' is the key, and then it depends on its high and low temperature resistance. The higher the degree, the stronger the weather resistance and aging resistance, so it is not easy to crack and fall off.

Question 3: What is glass putty or ointment? Glass putty and grease are used for wood product mixing, wallpaper paving, wall base treatment, floor paint base treatment, etc. , also commonly used for fixing steel and wooden window sash. Gypsum powder, talcum powder, chalk or precipitated calcium carbonate and cooked tung oil (or cooked linseed oil) are generally used for blending.

Question 4: How to get rid of greasy old steel window glass? Don't eat too much, it's bad for digestion and easy to get fat.

Eating greasy food will increase blood lipids in the body and increase bile secretion, resulting in high cholesterol saturation in bile and easy formation of stones.

Relieve greasy:

Drinking more boiled water can accelerate gastrointestinal metabolism and reduce the damage of a lot of meat and wine to the liver. If boiled water is tasteless, drinking tea can also clean up the greasy gastrointestinal tract and make it return to normal level as soon as possible.

Eat more vegetables Fresh vegetables are an alkaline food, which is not only rich in cellulose, but also can neutralize excess acidic substances in the body and maintain the needs of human metabolism. Among them, the cellulose in vegetables can relieve greasy, promote gastrointestinal peristalsis and prevent constipation. Such as radish, celery and pepper.

Eating fruit to balance and digest the messy diet during the Spring Festival is more likely to make people get angry and constipated. At this time, you might as well eat more bananas, because bananas have a good effect of clearing away heat and toxic materials and moistening intestines. Pear is cold, rich in sugar, vitamins, minerals and pectin, and has the functions of lowering blood pressure, resolving phlegm, moistening dryness and promoting fluid production. Hawthorn is rich in vitamins C, B, nicotinic acid, iron and other ingredients, especially for anorexia and dyspepsia.

Drink more mixed fruit and vegetable juice, that is, mixed fruit and vegetable juice. Fruit and vegetable juice can easily supplement vitamins, minerals and antioxidants needed by the human body, and can effectively neutralize acidic substances in the body, keep the environment in the body clean and eliminate hidden dangers of diseases. Because when enough fruit juice and vegetable juice enter the human digestive system, it will make the blood alkaline and dissolve the toxins accumulated in cells. Drinking fruit and vegetable juice after meals can give full play to the nutrition of whole rice, especially for hangover, digestion and greasy food.

Staple food: don't forget to eat more vegetables, less or even no staple food, which is not desirable. Grain is the main source of carbohydrate, which participates in the metabolic process of fat and protein, making them completely oxidized, reducing the generation of toxic products and providing dietary fiber for human body. Therefore, while tasting delicious food, we should eat staple food. The staple food is mainly coarse grains, and corn, oats and other ingredients can be added appropriately. At the same time, drink more porridge and soup, such as millet porridge, noodle soup, noodle soup and so on. Special pickles have a good effect of clearing away fire and relieving boredom, so that the already overwhelmed gastrointestinal tract can rest and adjust.

The magic of plum in relieving greasy is that it can remove three poisons: food poison, water poison and blood poison. The first two belong to killing bacteria, and the third refers to blood that can purify acidic constitution. As sour plum is a strongly alkaline food, it can purify blood.

Radish helps digestion. Eating raw radish can not only get vitamin C, but also has a strong effect of relieving greasy and helping digestion.

Eating papaya after meals contains a special ingredient-protease, which has a strong softening effect on meat. Therefore, you can eat fresh and tender meat with papaya stew, which is not only delicious, but also greasy. Papaya is rich in 17 amino acids, vitamin C, calcium and iron. It also contains papain and is known as the king of all kinds of fruits.

Question 5: The old steel window is seriously aged, and the glass putty powder can't stick to the glass. Is there anything that can replace glass putty powder? First of all, thank you for your attention and answers. Flour can be used instead, but only temporarily! Buy a bottle of glass glue!

Question 6: Hand-made Flat Tempered Glass Chapter 27 Glass Installation This chapter is applicable to glass installation works of industrial and civil buildings such as flat plate, embossing, frosting, heat absorption, heat reflection, hollowing, interlayer, wire clamping, tempering, colored glass and glass brick. Section 1 Material Requirements: The varieties, specifications and colors of glass and glass bricks should meet the design requirements, and their quality should meet the relevant product standards. 1 glass: the varieties and specifications of flat, wire-clamped, frosted, colored, embossed, heat absorbing, heat reflecting, hollow, sandwich, toughened and glass brick shall be selected according to the design requirements; If there is no requirement for the design of lighting ceiling glass, sandwich, wire clamping, tempering and insulating glass composed of them should be adopted. 2 grease seeds: you can buy the finished products directly in the market, or you can make them by yourself with reference to the following proportions: white powder (calcium carbonate) 100 mixed oil 13 ~ 14, in which the proportion: three-line dewaxed oil 63 cooked tung oil 30 loose stearic acid to identify the technical performance of putty can be checked with reference to the following indicators: (1) Appearance:. (2) Hardening: After putty is painted, it should be hardened within 20 days and nights at room temperature; (3) Ductility: 55 ~ 66 mm; (4) Freeze-thaw: 6 hours at-30℃ each time, repeated for 5 times without cracking or falling off the frame; 440 (5) Heat resistance: 60℃ for 6 hours each time, repeated for 5 times without flowing, dripping or foaming; (6) Adhesion: not less than. Other materials: red lead, lead oil, glass nails, steel wire clips, oil ropes, rubber pads, wooden strips, kerosene, etc. The main machines in the second section include workbench, glass cutter, ruler board, steel tape (3m), wooden folding ruler, wire cutters, flat shovel, putty knife, wooden handle hammer, square ruler, cotton silk or rag, writing brush, tool bag, safety belt and other equipment. Section 3 Operating Conditions Glass shall be installed inside and outside doors and windows, and installed before painting the last coat of paint after passing the inspection. Glass partition of glass installation, should also refer to the above provisions for installation. Steel doors and windows should be inspected for distortion before glass installation, and the glass should be renovated and selected before installation. Before installation, the glass should be cut in advance according to the design requirements and measured dimensions. The cut glass should be packed in a safe place according to different specifications and installation sequence for later use. For semi-finished products entering the site after centralized processing, several pieces should be selected for trial installation, and the size allowance of incoming materials should be verified in advance. The length, width and width should be reduced by a quarter of the L-cut width (generally, the upper and lower margins of each glass are 3mm, and the width and width margins are 4mm), and the edges should not be skewed or angular. If necessary, it should be reworked or replaced. The cutting size of aluminum alloy frame and sash glass shall meet the national standards and meet the design and installation requirements (see the installation process of aluminum alloy frame and sash glass for details). Refined oil ash bought from the market or putty made from natural drying oil, such as cooked tung oil, can be used directly; Such as putty prepared with other oils, can only be used after passing the inspection to prevent waste. Section IV Operation Flow 44 1 Process Flow: glass selection and cutting → stacking according to specifications → wiping before installation → scraping bottom putty → inlaying glass → scraping putty, cleaning the glass to be installed, and putting the cut glass in place according to the specifications and quantity of parts; The distribution quantity shall be subject to the installation quantity on that day, and should not be too much, so as to reduce the handling and glass loss. The general installation sequence should be: first install external doors and windows, then install internal doors and windows, and then install them in the order of northwest and southeast; If the labor force permits, it can also be installed at the same time. Clean the cut before installing the glass. Apply 1 ~ 3 mm thick bottom putty evenly between the bottom surface of the glass and the incision, then flatten the glass and compact it, and then collect the bottom putty. After the glass is leveled and compacted, nails shall be nailed on four sides respectively, and the nail spacing shall be 150 ~ 200mm, with at least two nails on each side. After the nail is nailed, tap the glass with your hand, and the sound is solid, indicating that the glass is installed smoothly; If the noise is patted, it means that the putty is not tight. It is necessary to take off the glass again, spread the bottom putty, then flatten it, and then fill the edge of the putty with putty. If it is fixed with wooden strips, it should be coated with drying oil first, and the glass should not be pressed too tightly. Steel door and window glass installation should be fixed with steel wire clips, the spacing between steel wire clips should not be more than 300mm, and there should be no less than two on each side, which should be filled with putty and polished; If a rubber pad is used, it should be embedded in the cutting opening first and fixed with layering and screws. Install the glass of the inclined sunroof, such as >>.

Question 7: What is the mud for glass? The things that fix the glass are called putty and glass putty. Paint and chemical shops sell them.

Question 8: Raw materials and methods for making frosted walls (1) Construction technology of wallpaper and wall covering decoration.

Wall refers to the wall with wallpaper, wall cloth, etc.

1, paste the structure of the wall

The wall is made of cement lime slurry to make the wall smooth. After drying, scrape the putty, smooth it with sandpaper, and then paste the wallpaper with 107 glue or other adhesives.

2, wallpaper, wall cloth main technology.

Clean up the base, caulk → paste the joint tape, fill putty and abrasive paper at the joint of gypsum board surface → scrape putty and smooth → brush moisture-proof agent → brush primer → elastic thread on the wall → soak wallpaper → apply adhesive to wallpaper and base → cut wallpaper and apply adhesive to wall hanging, flat-fell seam, lap joint, flower arrangement → press adhesive foam → wipe adhesive → finish.

3, wallpaper, wall covering construction points.

1. When handling at the grass-roots level, it must be clean, flat and smooth, and the moisture-proof coating should be painted evenly, not too thick.

(1) Concrete and plastering base: clean the wall surface and level the surface cracks and potholes with putty. Scrape putty again and smooth it. Determine the number of putty scraping as needed.

(2) Wood base: The wood base shall be planed flat without burr, stubble and exposed nails. Joints and nail holes should be filled with putty. Scrape putty and smooth it.

(3) Gypsum board base: Gypsum board joints shall be treated with caulking putty and firmly bonded with sealant tape. Scrape the putty off the surface.

Primer coating generally uses 107 glue, and the primer can survive once without omission.

2. In order to prevent wallpaper and wall covering from falling off due to moisture, a layer of moisture-proof coating can be applied.

3. Play vertical and horizontal lines to ensure that the wallpaper and wall covering are horizontal and vertical, and the patterns are correct.

4. Plastic wallpaper expands when it meets water, so it is necessary to wet the paper with water to make the plastic wallpaper fully expand. Wallpaper, wall cloth, etc. based on glass fiber. It won't stretch when it meets water, so there is no need to wet the paper. Composite paper wallpaper and textile fiber wallpaper should not be stuffy.

5. After pasting, press the wallpaper glue without leaving bubbles, and wipe the extruded glue in time.

(4) Precautions

1. The water content of the wall foundation should be less than 8%.

2. Check the wall flatness with 2m guide feet, and the height difference shall not exceed 2mm.

3. When stitching, align the pattern first and then stitch, so that the upper and lower patterns are consistent.

4. Flat-fell seam is strictly prohibited at the Yang angle, and the wallpaper should be wrapped above 20 mm at the Yang angle. ..

5. When installing glass fiber wall cloth and non-woven wall covering, the back can't be painted with glue, and the China figurine is painted with glue on the base. Because there are fine holes in wall covering, the glue will print through the surface, and there will be glue marks, which will affect the appearance.

1. Main construction technologies

(1) varnish construction technology:

Cleaning the wood surface → Sandpaper grinding → Powder spreading → Sandpaper grinding → First putty scraping, Sandpaper grinding → Second putty scraping, Fine sandpaper grinding → Paint painting → First varnish painting → Color matching, putty filling and fine sandpaper grinding → Second varnish painting and fine sandpaper grinding → Third varnish painting, waxing and water sandpaper grinding.

(2) Construction technology of mixed color paint:

First, clean up the dust on the surface of the base, repair the base → smooth it with sandpaper → draw scars → render putty → apply drying oil → blow putty for the first time → polish → apply primer → dry primer → apply topcoat → repair putty → polish topcoat for the third time → apply coating for the second time → polish topcoat for the third time → polish and wax.

2. Key points of construction

Code for construction of oil cleaning and scrubbing

Polishing the base is an important process of painting varnish. First of all, it is necessary to remove dust, oil and other impurities from the wood surface.

Lubricating oil powder is also an important process of varnish painting. During construction, cotton silk is dipped in oil powder and coated on the wood surface, rubbed back and forth by hand, and the oil powder is rubbed into the wood eye.

When brushing clean oil, you should hold the oil brush easily and naturally, and use your fingers gently, so as not to loosen or drop the brush when moving.

When painting, it should be carried out according to the requirements of dipping more times, dipping less oil every time, diligent operation and smooth brushing, and the construction should be carried out according to the operation methods of first up and then down, first difficult and then easy, first left and then right, first inside and then outside, and horizontal and vertical brushing.

Code for construction of mixed oil on wooden surface

In addition to cleaning up the sundries at the grass-roots level, the grass-roots level should also fill in local putty and polish it with sandpaper along the wood grain.

Before painting the top coat, seal the knots and wood resin with lacquer flake (shellac paint). Drying oil or berth clearing should be applied at the grass-roots level, and drying oil layer should be evenly applied to all parts, without brush leakage.

After the priming oil is completely dried, scrape the putty for the first time, polish it with manual sandpaper after drying, and then fill in the high-strength putty. Putty shall be based on not picking silk. When the surface coating is applied, it should be polished with fine sandpaper first.

3. Preventive measures

(1) The base course shall be constructed as required to ensure ... >>

Question 9: The wall is not leveled, so it is necessary to install glass on both sides of the wall. What should I do? The master said that you can scrape the putty powder on the wall ... so that you can level the wall.

And the cost is not expensive ... it will be finished soon ... if it is uneven, polish it.

If the uneven glass is easy to touch ... then if the back of the glass is empty ... it will break easily.

Question 10: How to make wall putty? Do you want to put putty or paste putty? Ordinary, waterproof, flexible, elastic and functional, which one do you want?