Necessary form of decoration diary
catalogue

1, design consultation data sorting table (filled in by the owner)

2, the whole construction process schedule (reference)

3, the construction schedule (the contractor to fill in)

4. List of main materials supplied by Party A (to be filled in by the contractor)

5. Installation Table of Decoration Progress (filled in by the Owner)

6, decoration cost schedule-building materials (owner to fill in)

7, decoration cost schedule-furniture (owner to fill in)

8. Attachment: Decoration design drawings

Everything is established in advance, and it is abolished. Dear owners, as long as you have this booklet and follow the actual steps, you can easily fix the decoration of your home and fully grasp it!

A book in hand, no worries about decoration!

Design consultation data arrangement table

I. Basic Information: Customer Name: Tel: E-mail:

Survey site: estimated renovation time:

Living room area: (building area) m2 Living room grid:

Living room type: □ flat floor □ split floor □ duplex □ villa □ other □ new house □ second-hand house (renovation of old house)

Second, the personality record: 1, your room members: (how many people live), including:

2. Your favorite home style: □ Chinese classical style □ European classical style □ Japanese style □ natural local style □ modern style □ mixed style □ others.

3. Your favorite overall home color: □ cold □ warm □ depending on the function of the room.

4. Your dining habits: always eating at home, always eating out and always treating guests at home.

5. Your bathing method: □ shower □ bathtub □ both □ other.

6. Your personal hobbies: collection, music, TV, pets, sports, reading, traveling, surfing the Internet and others.

7. Basic information of the house (basic decoration):

Iii. Existing furniture and household appliances (corresponding pictures, floor plans and some current pictures can be attached on the next page)

Construction progress reference table

(Detailed explanation of the whole construction process) Construction team enters the site. Demolition projects in which the main materials of construction projects need the owner's participation, such as door and window demolition, wall demolition, ground demolition, water circuit demolition, heating demolition, new wall construction, wall repair, etc. After the demolition, some walls and structures will be newly built and repaired, so that the kitchen cabinet design can be reserved for the next step of water circuit construction, and the heating will be transformed into pipeline water circuit. The indoor water circuit will be completely transformed and adjusted to 1 according to the actual living needs, and the position of water circuit is to be determined.

2. Site acceptance of materials

3. After the completion of hydropower construction, the waterway shall be suppressed for acceptance. Carpenter's ceiling. The design is modeled. Woodworking furniture is made of. Furniture hardware is provided by the glass owner. The bricklayer's brush is waterproof. Clean up the ground, especially the yinjiao line. Construction appointment shall be made in strict accordance with national standards to measure the wall tiles of plastic steel windows and security doors. In order to ensure the overall construction period, the kitchen wall brick needs to be constructed first, so that the kitchen cabinet can be retested for the second time. Tiles, external corners and cross-tiling can be closed for 24 hours, and water closing tests can be carried out. Contact downstairs or property to coordinate observation. The necessary ground protection can be carried out after the bricklayer's ground waterproof protection is qualified. Usually, a simple layer of cement leveling is carried out to make an appointment to retest the kitchen cabinet, and it is confirmed that the bricklayer's bathroom is paved with wall tiles to make an appointment to install plastic windows, security doors and measuring indoor doors. When the floor tile is laid, it is necessary to determine the floor thickness with the owner to ensure the flatness of the floor. After the ground leveling and leveling of ground fillers, floor drains, customized lintels and window sill stone masons, the construction will be maintained or suspended according to the actual situation. In order to protect the leveling quality of the ground, the thickness of the floor is determined by the threshold stone. The construction party will conduct acceptance (pre-inspection in advance). The owner will participate in the completion acceptance of the bricklayer. The construction party will conduct acceptance (pre-inspection in advance). And protect the floor tiles with finished products. The owner participates in the acceptance. Painters enter the site to scrape the wall, plaster the wall, plaster and level it, stick anti-crack treatment, and scrape putty. Painters paint wood products and furniture to determine the color of wall paint. Painters polish the top surface of the wall, brush the primer and finish paint, install the aluminum gusset ceiling of the kitchen and bathroom, and assist the owner in the ceiling installation. Yuba and range hood need to be installed in advance, and the owner will arrange it himself. Make an appointment for the completion acceptance of the painter installed by the manufacturer. The construction party will conduct acceptance (pre-inspection). The construction party will clean up all tools and surplus materials on the site. The owner will arrange the installation by himself (the construction sequence is suggested in the following order). The wallpaper installation owner will be present to coordinate and accept the installation of indoor doors, heating and natural gas. The owner will be present to coordinate and accept the installation of lamps and switch panels. The owner will hand over to the construction party in advance. Detailed installation instructions, the construction party will install on site, the materials will be transported to the site in advance, and the owner of kitchen cabinet installation, sanitary ware and hardware installation can be absent. Details such as handover installation instructions by the owner, site installation by the construction party, site coordination by the owner, site coordination of ground installation, final acceptance, cleaning, wall painting by painters, and ground connection by masons. Repair the skirting line at the edge of the door cover line, the owner will be present to coordinate and accept the curtain installation, and the owner will be present to coordinate and accept the furniture to enter the site, and the odor will be cleared. Wait for Party A to provide the main materials, the name and specifications of the plan number, the name and specifications of the materials for preparing the plan time, the plan preparation time 1, the third week of tile kitchen construction, the second week of kitchen cabinet measurement construction, the third week of toilet construction, the sixth week and the fifth week of the installation time of range hoods and sinks, the third week, the sixth week and the seventh week of the living room, the third week and the eighth week of the balcony. The wall brick kitchen starts in the third week, 10 installation time starts in the sixth week, and 1 1 toilet starts. The third week 12 door locks include: door locks, hinges, door suction starts in the sixth week 13 balcony starts in the third week 14 sanitary ware toilets, washbasins, showers, etc. From the 6th week 15, the skirting line starts from the 3rd week 16, see the lamp fittings. After the hydropower transformation is completed, the construction personnel will provide it directly. Start the 6th week 17 jointing agent start the 3rd week 18 kitchen and bathroom accessories start the 6th week 19 floor drain ordinary washing machine start the 3rd week. 20 See switch panel accessories. After the hydropower transformation is completed, it will be directly provided by the construction personnel. Week 6: 2 1 natural gas reconstruction. Week 4: 22 On-site measurement of integrated ceiling aluminum gusset plate manufacturers. Week 6: 23 Time to change the heating and pipes. Week 2: 24 See other forms for other installation materials. 25 installation time. Week 6: Architecture. 26 27 28 29 30 3 1 32 the first week of renovation plan

sabotage

Hydropower 1,

2、

3、

4. The second week

waterpower

Woodworking craft

Bricklayer 1,

2、

3、

4. The third week

Woodworking craft

Bricklayer 1,

2、

3、

4, the fourth week

Shovel worker

Oil workers 1,

2、

3、

4, the fifth week

Oil workers 1,

2、

3、

4, the sixth week

paint

Install 1,

2、

3、

4, the seventh week

fixed

Clean 1,

2、

3、

4, the eighth week

Sanwei

Furniture 1,

2、

3、

4, decoration cost schedule

(List of building and building materials consumption)No. Cost type (decoration building materials) Brand and model Unit price Total purchase price Note 00 1 Decoration construction (cleaning accessories) 002 Designer design fee 003 Water circuit renovation fee 004 Construction change fee. Decoration building materials 005 kitchen cabinet 006 range hood cooker 007 sink and faucet 008 kitchen floor tile 009 kitchen wall tile 0 10 kitchen flower waist line 065438+ 0 1 toilet wall tile 0 13 bathroom flower waist line 0 14 wall tile external corner line 0 15 mosaic mosaic. Kloc-0/7 ceramic skirting line 0 18 joint filler 0 19 floor drain 020 threshold 02 1 window sill serial number Cost type (decoration building materials) brand and model. Quantity, unit price and actual purchase price remarks 022 plastic window 023 security door 024 indoor wooden door 025 indoor door hardware lock, hinge, door suction 026 door and window cover (wooden) 027 indoor aluminum-magnesium alloy door 028 kitchen, bathroom aluminum gusset ceiling 029 Yuba 030 decorative glass modeling Owner purchased glass 03 1 wallpaper 032 floor 033 switch panel 034 lamps, chandeliers, light strips and spotlights. Shower Room and Shower 036 Hardware Decoration Expense Schedule (Consumption List of Furniture and Electrical Appliances)No. Expense Type (Furniture and Electrical Appliances) Brand and Model Unit Price and Price Remarks 00 1 Hall Shoe Cabinet. 002 living room sofa coffee table TV cabinet decoration cabinet TV air conditioning 003 dining room dining table chair sideboard refrigerator air conditioning 004 bedroom bed bedside table mattress dresser wardrobe chest of drawers TV air conditioning computer 005 study desk bookcase sofa air conditioning computer 006 kitchen microwave oven rice cooker disinfection cabinet juicer water purifier (water softener) 007 Other electrical appliances.