2. Turn off the power switch, check whether the server and its equipment are normal, and carefully observe the operation of the machine and other conditions.
3, after the equipment operation, adjust the drum speed, rolling temperature, curing furnace temperature operation.
4. Turn the machinery and equipment for five minutes, test several films, and mass-produce them after confirming that they meet the requirements. Without the film test, it is not allowed to publish the production.
5. Do the first three inspections automatically and regularly check the quality of products and workpieces.
6. In actual operation, as long as your hands are 30 cm away from the bucket, you can't get close to dangerous places.
7, homework finished or common problems, abnormal situation requires first stop, discuss the person in charge, timely repair and hang up the maintenance card.
8. Disconnect the main power switch, clear the field operation and conduct a comprehensive inspection.