Lu Jia Fei Fa [2008] 178 No.
Jinan, Jining, Dezhou Municipal Price Bureau, Finance Bureau and Land Resources Bureau:
Your request for instructions on adjusting the compensation standard for attachments and young crops on land requisition has been received, and we hereby reply as follows:
According to the Notice of the General Office of Shandong Provincial People's Government on Adjusting the Annual Output Value and Compensation Standard of Land Expropriation (Lu Zhengban Fa [2004] No.51), we agree to report the compensation standard for attachments and young crops on the land requisitioned. In the process of national land acquisition and demolition, compensation should be made in strict accordance with the regulations to effectively protect the vital interests of farmers.
This reply shall be implemented as of the date of issuance.
Attachment: Compensation standard for attachments and young crops on land requisitioned in Jining City
A note on the compensation standard of serial number and category
1 flat roof of rock foundation, masonry wall, precast reinforced concrete or cast-in-place building 490-630 yuan /㎡ 1, and the area in the table refers to the construction area.
2. The old materials demolished on time should be returned to their original owners, otherwise the demolition materials approved by the land department of the people's government at the city or county level will be used to offset the demolition expenses.
3, housing compensation refers to the loss of old materials, demolition and construction labor costs.
4. The houses in the table are houses with land ownership certificate and real estate license or with legal examination and approval procedures.
5. If the building wall belongs to cement block, the lower limit of similar compensation standard for masonry wall shall be implemented; If the roof is asbestos tile or straw house, the lower limit of the same standard shall be implemented.
6. The compensation standard for house demolition in urban villages within the urban planning control area can be increased by 10%-20% on the basis of the corresponding compensation standard.
7, other compensation related to the demolition in accordance with the relevant provisions.
8. This standard does not include land price.
Stone foundation, masonry wall, sloping grass or tile roof with wood structure 380-490 yuan/㎡.
Stone foundation, brick pile, blank wall, sloping grass or tile roof with wood structure 3 10-380 yuan/㎡.
Rock foundation, adobe wall, sloping grass or tile roof with wood structure 240-3 10 yuan /m2
Brick stack, reed foil and grass roof simple bungalow 160-240 yuan/㎡.
Brick-concrete structure building 550-700 yuan/㎡
Frame Structure Building 700-900 yuan/㎡
2. 80- 100 yuan /m 1 of old materials that have been demolished on time and the height exceeds 2.5m. Otherwise, the demolition materials approved by the land department of the people's government at the county level shall be used to offset the demolition expenses.
2. There are legal examination and approval procedures or approval.
3. If the fence belongs to cement block, the lower limit of compensation standard similar to masonry wall shall be implemented.
Rubble foundation brick wall 2-2.5m high 70-90 yuan/m.
Height of stone-based brick wall 1.5-2m 60-75 yuan/m.
Height of adobe wall on stone foundation 1.5-2.5m 40-50 yuan/m.
3. Brick-concrete structure of livestock and poultry houses 100- 150 yuan/㎡ The old materials demolished on time shall be returned to the owners, otherwise the demolition materials approved by the land department of the people's government at the county level shall be used to offset the demolition costs.
Simple structure 50-80 yuan/m2
4. All coffin removal, bone removal and cinerary casket costs 600 yuan/block including removal and burial materials. 300 yuan with double coffins.
5. According to 60- 100 yuan/㎡, the old materials such as greenhouse steel, concrete skeleton and glass roof that were demolished on time should be returned to their original owners, otherwise the demolition materials approved by the land department of the people's government at the county level will be used to cover the demolition costs.
Steel, concrete skeleton and plastic film roof 40-60 yuan/㎡.
Simple plastic film greenhouse 20-30 yuan /m2
6 Small Bridge Reinforced Concrete Rectangular Slab Bridge 1200- 1400 yuan/㎡ Calculated according to the bridge deck area.
Pingshi Arch Bridge 1000- 1200 yuan /m2
Stone arch bridge 1600-2000 yuan/㎡.
7 culvert slab culvert span 1-2m 500-600 yuan/m
Span of stone arch culvert1-4m1800-2100 yuan/m.
The span of reinforced concrete circular culvert is l-2m 1500- 1800 yuan/m.
The span of reinforced concrete slab culvert 1.5-4m 1800-2200 yuan/m.
8 Taitian Taiyan 60-80 yuan/m
9 Trenches and ponds are built with soil, and they are excavated by volume.
10- 15 yuan /m3 excluding site sewers.
Stone canals and pools (the pool is calculated according to the square area around the pool and the bottom of the pool, and the canal is calculated according to the square area on both sides of the channel and the bottom of the pool) 50-60 yuan/㎡ earthwork is counted separately.
Brick canals and pools (area calculation method is the same as above) 60-80 yuan/㎡.
10 cement floor 10- 15 yuan/㎡.
Tile 20-30 yuan/m2
1 1 kill 30 yuan by hand /m 1. Well compensation includes excavation cost, material cost and labor cost.
2. Waste and dry wells are compensated by 30%-50% according to the compensation standard of similar wells.
3. Compensation is calculated according to the depth of the well.
4. Well refers to a well that has been built in history (more than three years) or approved by relevant departments.
Earth well: diameter1.2m110-130 yuan/m.
Brick wells: (including stone wells)
Depth 5- 10m diameter1.5m.
Depth 10-20m, diameter 2.5m
3000-4000 yuan/mouth 4800-5800 yuan/mouth
Running tube well 350-450 yuan/m
Motoi:
20-50 meters deep
50- 100 m deep
100-250m deep
Depth below 250 meters
200-250 yuan/m
250-320 yuan/m
320-400 yuan/m
400-600 yuan/m
12 ground diameter 1.5cm below the fruit tree seedling transplanting fee 3-4 yuan/tree including; Apple, pear, peach, apricot, walnut, cherry, persimmon, jujube, chestnut, plum and other tree species. Pomegranate tree compensation standard plus 20%. If cleared on time, the tree will return to its original owner. Otherwise, with the approval of the land and resources department of the people's government at the city or county level, the trees will be used to offset the demolition costs.
40-50 yuan per plant with a ground diameter of less than 3 cm, with no more than 220 plants per mu.
In the first fruiting period (planting for more than three years), the ground diameter is less than 6cm, and the crown width is more than 260-300 yuan/plant, and each mu does not exceed 120 plants.
400-500 yuan/plant with a ground diameter of more than 6cm and a crown width of more than 2cm (planted for more than three years) in full fruit, with no more than 80 plants per mu.
Aging period (tree species) 260- 120 yuan/plant
Grape (growth period) 20-60 yuan/plant, no more than 440 plants per mu, and used as a part-time material.
13 transplant fee for trees with DBH less than 5cm (young trees, conifers and cypresses less than 3cm) 3-4 yuan/tree refers to timber forest species, and the compensation standard for trees in coastal shelterbelts and hilly areas can be increased by 40%-60%, and the price of trees in special-purpose forests can be discussed separately; Trees cut down on time will be returned to their original owners. Otherwise, with the approval of the land and resources department of the people's government at the city or county level, the trees will be used to offset the demolition costs.
DBH 5- 10cm (pine and cypress 3-6cm) 30-40 yuan per plant.
DBH 10-20cm (pine and cypress 6- 10cm) 45-55 yuan per plant.
60 yuan of adult trees with DBH greater than 20cm (conifer 10cm).
Ginkgo trees below 8cm in diameter at breast height shall be treated as conifers, with no more than 220 trees per mu, and those exceeding 8cm shall be discussed separately.
Zanthoxylum bungeanum and Toona sinensis seedlings 1.5 yuan/plant
Zanthoxylum bungeanum and Toona sinensis are more than 2cm in diameter, 10 yuan/plant.
Zanthoxylum bungeanum and Toona sinensis have a ground diameter of more than 5cm in 30 yuan/plant.
14 The number of shrubs within 4-5 yuan per pier per year is calculated as 10-20.
More than one year old 5-7 yuan/pier
15 mulberry field Within two years, 3,500-4,000 yuan/mu of mulberry field will be planted to raise silkworms in the field.
More than two years and less than three years, 4500-5500 yuan/mu.
More than three years, 6000-7000 yuan/mu
16 power communication line The low-voltage line established with the approval of relevant departments is 1200- 1500 yuan/pole, including the loss of materials such as wires and the cost of demolition and construction.
Communication broadcast line 1200- 1500 yuan/pole.
17 brick kiln 18, 20, 22 and 32 door wheel kiln 9000- 13000 yuan/door including chimney.
Old kiln 15000-30000 yuan/seat including drying room.
18 nursery seedlings are 5000-7000 yuan/mu, including various losses such as seedling tree species and cultivation and transplanting.
19 fish pond 10000- 14000 yuan/mu including loss of earthwork and fry.
20 lotus pond 7000- 10000 yuan/mu including earthwork and lotus seedling loss.
Description:
1. If the contents in this table are not specified in detail, it shall be implemented according to the relevant provisions of the state or relevant business departments.
2. The compensation standard for young crops is calculated according to the output value of one crop.
3. The ground attachments not listed in the table shall be compensated with reference to similar situations in the table. Unable to refer to, report to the Municipal Price Bureau to determine the compensation standard. Within the scope of the compensation standard, if the land requisitioner and the land requisitioned have disputes over the specific compensation standard, it shall be assessed and determined by an intermediary agency with the qualification of price assessment.