However, it is also useful to replace the health film with a transparent layer before.
This requires that after the roller compaction is completed at the grass-roots level, it should be tested quickly, and the pavement layer should be paved immediately after it is qualified to prevent moisture evaporation. The key is short time and close to the construction.
It's called assembly line, and it's getting less and less now. Are very cautious.