1. Before the construction of water-stable materials, preparations should be made. Whether the required materials are prepared and the quality of the materials is inspected to see if there are any defective products, so as to deal with them in time. At the same time, for the construction site, it is necessary to do a good job of cleaning, and all equipment should be confirmed to be no problem.
2. Before the construction of water-stable materials, lofting must be carried out according to relevant requirements and parameters of different equipment. At this time, steel nails and red cloth are generally used as markers to avoid confusion.
3, the transportation of materials is also a link to pay special attention to. First, mix the materials in one place, and then transport them to the construction site by the vehicle that inspects the contract.
4. Paving the road. It is necessary to transport the equipment to the predetermined location first, and then use the equipment for continuous paving. At this time, the roller will roll on the constructed ground to ensure that no trace will be left. If there is a problem, check it in time and complete the repair.
5. After the paving work is completed, joint treatment is needed. You know, in the process of construction, if the construction is interrupted, it will increase the cleaning work of transverse joints.
6, after the completion of the construction, need to do maintenance at the grass-roots level. Generally, sprinkler maintenance is adopted, and protective fences should be set around the construction site to prevent others from stepping in.