How long will it take to remove the arch of tunnel portal after pouring?
Form removal began on the second day after concrete pouring. After the concrete pouring of tunnel portal cover arch is completed, it will be cured to make its concrete reach 70% of the design strength. According to the time calculation, the formwork shall be removed the next day after concrete pouring, and the arch ring shall be covered or watered for more than 7 days after pouring.