Speech by the completion acceptance construction unit
8 construction unit completion acceptance speech.

Now more and more places need to use speeches, which should be substantial, clear and focused. I believe many people will find it difficult to write speeches. The following is the speech of the completion acceptance construction unit I collected for you. Welcome to share.

Speech on completion acceptance of the construction unit 1 leaders and representatives of all participating units:

First of all, thank you for your busy schedule to participate in the completion acceptance of the first bid section of the water features project from Pingliang Kongtong Reservoir to Baliqiao Jinghe River. Now, on behalf of the construction unit Jingning County Water Conservancy Engineering Company, I would like to briefly introduce the project situation.

I. Overview of the Project:

In this project, the weir height is set to 0. There are five 8m retaining weirs, 1 dripping water and nine shallow ponds, forming a water surface area of 261.340m2 (392mu). Combined with the plants suitable for the regional climate, three aquatic plants, reed, LYSIMACHIA edulis and scallion, were selected for ecological greening of the river, forming an ecological wetland with an area of 422 130 square meters (633 mu), including 404,500 square meters (607 mu) by the river. Hexinzhou17630m2 (26mu). In terms of landscape environment, a rich river landscape will be created in the form of river center continent and ecological green land, and appropriate beaches will be reserved for birds to inhabit, totaling 4,830 square meters (7.3 mu), including 2 150 square meters (3.2 mu) by the river. Hexinzhou is 2680 square meters (4. 1 mu). The project started on June, 20xx 15, and was listed as the key project of our company. In the process of construction, our company adheres to the policy of "safety first, quality first", and together with the construction and supervision units, strictly controls the entrance of materials to ensure the quality of materials, operates in strict accordance with the requirements of design documents and construction specifications, and determines the solutions to various problems encountered in construction in time. Problems found in the process of self-examination are also corrected and improved in time.

Second, the time limit for a project:

The project passed the acceptance of the basic division on September 19, 20xx14, and was basically completed on March 10, 20xx. Through the unremitting efforts of all parties, the design documents and construction contents agreed in the contract have been completed, and the engineering technical data are complete, detailed and accurate. The quality of the project meets the requirements of national specifications and relevant technical standards, and it has the conditions for completion acceptance.

Third, the project quality self-inspection:

According to the specification requirements, this project is divided into eight subprojects: foundation and foundation, main structure, decoration, roof, water supply and drainage, heating, building electricity, elevator and building energy conservation. The quality evaluation of each component project is qualified, and the quality evaluation of this unit project is qualified. 30 quality control data were checked, and 30 items met the requirements. There are 23 safety and main function verification and spot check results, 23 of which meet the requirements, 6 of which meet the requirements.

Build projects, build monuments, and make friends. On behalf of the construction unit, I would like to congratulate the construction unit on the completion of this project, and express my heartfelt thanks to the quality supervision, construction, design, supervision, survey and other units that gave us strong support during the construction process!

Thank you!

Speech on the completion acceptance of the construction unit 2 Dear leaders:

Hello everyone!

First of all, I am very grateful to the leaders and experts from all units for coming to participate in the completion acceptance of the "Trade Street in * * County" project undertaken by our company. On behalf of the construction unit Construction Co., Ltd., I will briefly introduce the construction of this project:

First, the general situation of construction:

The project started on February 8, 20xx 18, and all the contents agreed in the design drawings and construction contract have been completed. All construction contents are carried out in strict accordance with the construction drawings, design changes, design disclosure and the blue prints.the design signed by the design unit.

Second, the detection of raw materials and entities:

Various raw materials used in the project, such as cement, sand and gravel, steel bars, concrete, bricks, etc. , has been strictly in accordance with the principle of inspection before use for inspection and sampling inspection. The factory warranty of raw materials is complete, and the results of witness sampling inspection report meet the design requirements.

The foundation of this project is manual digging pile foundation, and the detection of pile body meets the design requirements. The measured concrete strength and reinforcement spacing meet the design requirements.

The main body is a frame structure. The steel bars are connected by welding, and the test of joint specimens meets the design and specification requirements; The concrete strength report of the sampled specimens is rated as qualified, and the test results of the main entities meet the design requirements. All tests and evaluations are qualified.

Building decoration, building roof, building water supply and drainage, building electricity and other branch pipes shall be constructed in accordance with the design and specification requirements, and there shall be no leakage or water accumulation in roof spraying;

Third, the construction technical data:

In this project, according to the requirements of the specification, all the sampling items of each division and sub-item are qualified, and the sampling inspection lot is complete in information and signature, and qualified in evaluation. Engineering and technical data are complete, detailed and accurate. The project quality meets the requirements of national specifications and relevant technical standards.

Four. Quality and safety acceptance at each stage:

1, mass:

This project has passed the acceptance of each division and sub-project, and all the acceptance opinions are qualified.

2. Security:

This project has completed the safety verification at all stages, and the conclusion is qualified. No major safety accidents occurred from the start to the completion of the project.

Verb (abbreviation of verb) self-evaluation opinion:

In the process of construction, our company adheres to the policy of "safety first, quality first" and strictly implements the relevant national standards with the construction and supervision units. The self-inspection quality of the project meets the requirements of relevant national technical standards, and the completion acceptance conditions have been met.

Here, on behalf of Construction Co., Ltd., I would like to express my heartfelt thanks to all departments and contractors who have given us great support and help in the construction process.

thank you

First of all, I sincerely thank the leaders of the quality supervision station for taking time out of their busy schedules to participate in the completion acceptance. With the strong support, cooperation and concern of the leaders of relevant departments, and with the joint efforts of the personnel of survey, design, supervision, construction, quality supervision and construction units, the Burton Building project has completed all the tasks agreed in the contract through intense construction. The construction unit shall submit the completion report, which shall be signed by the director; The supervision unit has organized and passed the pre-acceptance, and put forward the project quality evaluation report; Survey and design units put forward survey and design quality inspection reports respectively; Our company has paid the project payment according to the contract and signed the project quality warranty with the construction unit. All materials for approval of this project and related materials and procedures for project approval are complete. I will report the construction of this project to the leaders as follows:

I. Basic information of the project and management of construction procedures

1. The contract is entrusted to Ningbo Geotechnical Engineering Co., Ltd. for survey, designed by Ningbo Civil Architecture Design and Research Institute Co., Ltd., supervised by Cixi Construction Engineering Supervision Consulting Co., Ltd. and constructed by Zhejiang Eastern Airlines Construction Group Co., Ltd. Project manager: Chen Chunxiang.

2. The construction area of this project is 78,285 square meters, and the frame and frame-shear structure have four to seventeen floors. The project started on July 20xx 18.

Second, the construction management organization

1. In order to ensure the smooth progress of the project, our company has defined the relevant provisions of project management based on the principles of quality first, safety first and frugality, including clean government, quality, safety, capital use and on-site construction management guarantee measures.

2, the construction unit to implement the project manager and main technical personnel responsibility system, all kinds of personnel responsibilities clear, sound rules and regulations, on-site management and orderly, good engineering order.

Three, the evaluation of engineering design, supervision and construction units

1, the design and survey unit can participate in the foundation trench inspection seriously and responsibly; Participate in the quality acceptance of foundation and related important parts; Participate in the project completion acceptance; Notice of design modification and technical negotiation; Participate in the handling of related engineering quality problems; Engineering quality inspection report issued by the design unit; Complete other contents agreed in the contract and perform the duties of the design unit.

2, supervision unit project management personnel qualification, equipment and in place to meet the requirements; Supervision regulations

According to the provisions of the preparation and approval of the detailed rules for the implementation of planning supervision; Review materials, components and equipment before they are put into use or installed; Implement witness sampling system; On-site supervision of key parts and key processes to ensure quality; Issue quality problem notice and review the rectification results of quality problems; Organize the quality acceptance of working procedures and parts, and participate in the quality acceptance of unit projects; Collect and sort out supervision data, review and supervise the construction unit's data for inspection; Issue the project quality evaluation report of the supervision unit; Complete other contents agreed in the contract and perform them well.

3. The qualification and equipment of the management personnel of the project management department of the construction unit are in place, and the qualification, equipment and equipment of the main professional posts meet the requirements; The construction organization design or construction scheme has been approved and implemented; The construction site shall have technical regulations for construction operation and relevant national codes and standards; According to engineering technical standards and construction drawing documents; Inspection and evaluation of working procedures, parts and unit engineering quality meet the requirements; Timely rectification of quality problems and quality accidents; Collect and sort out complete quality assurance information; Project quality self-evaluation report issued by the construction unit; Complete other contents agreed in the contract and better fulfill your responsibilities and obligations.

Fourth, the project cost management

The contract price of this project is 98 million yuan, plus the increase or decrease of design changes. After the completion acceptance, the quality guarantee money will be deducted. At present, the project settlement work is under review.

Verb (abbreviation of verb) quality management

1. This project is supervised by Cixi Construction and Installation Engineering Quality Supervision Station.

2. The main building materials, all kinds of components and equipment used in the project have certificates, and all kinds of tests are carried out according to the requirements of the specification, and the test report results are all qualified. Among them, concrete specimens and mortar specimens used for load-bearing structures are tested by witness sampling, and the number of tests meets the requirements.

3. There are no quality accidents and other accidents in this project. The construction quality of foundation, main body and roof conforms to the specifications and design requirements, and the roof and floor with waterproof requirements have no leakage.

Six, safe and civilized construction and time limit for a project management

1. Safe and civilized construction management of this project: This project is located in Han Zong Street, in order not to affect the office and life of surrounding units and avoid unsafe hidden dangers. The construction unit shall hang safety and civilized construction regulations and construction warning signs at the site, and designate a special person to be responsible for civilized construction management.

Seven. Engineering archives management

In the process of construction, the construction unit shall designate a special person to record, collect and sort out all the information in the process of construction according to the regulations on the management of construction engineering data, and the construction unit shall cooperate closely. As the project progresses, both parties will jointly check, check and confirm the data. At present, the construction materials are complete and have been completed.

These materials have also passed the inspection of the quality supervision department and have been handed over.

Eight, the completion acceptance conclusion

This project has been organized by each unit for household acceptance on September 26th, 20xx. After the joint pre-acceptance by the supervisor, the construction unit, the construction unit and relevant personnel, it is preliminarily considered that the project construction basically meets the design and specification requirements. Please correct me. Thank you. I wish this acceptance a complete success.

The construction unit completion acceptance speech 4 leaders and representatives of the participating units:

First of all, thank you for your busy schedule to participate in the completion acceptance of the first bid section of the water features project from Pingliang Kongtong Reservoir to Baliqiao Jinghe River. Now, on behalf of the construction unit Jingning County Water Conservancy Engineering Company, I would like to briefly introduce the project situation.

1. General situation of the project: in combination with the natural terrain and slope, the project has five water retaining weirs with a height of 0.8m 1 drop and nine shallow ponds, forming a water surface area of 261.340m2 (392mu); Combined with plants suitable for regional climate, three aquatic plants, Phragmites australis, Welsh onion, were selected to carry out river ecological greening to form an ecological wetland area.

422 130 m2 (633 mu), of which: 404,500 m2 (607 mu) by the river; Hexinzhou17630m2 (26mu); Around the landscape environment, rich river landscape will be built in the form of river center and ecological green space, and appropriate beaches will be reserved for birds to inhabit, with a total area of 4,830 square meters (7.3 mu), including: 2 150 square meters (3.2 mu) by the river; Hexinzhou is 2680 square meters (4. 1 mu). The project started on June, 20xx 15, and was listed as the key project of our company. In the process of construction, our company adheres to the policy of "safety first, quality first", and together with the construction and supervision units, strictly controls the entrance of materials to ensure the quality of materials, operates in strict accordance with the requirements of design documents and construction specifications, and determines the solutions to various problems encountered in construction in time; Problems found in the process of self-examination are also corrected and improved in time.

2. Duration: The project passed the acceptance of the basic division on September 19, and the acceptance of the main division on October 4, 20xx, and was basically completed on March 10, 20xx. Through the unremitting efforts of all parties, the design documents and the construction contents agreed in the contract have been completed, and the engineering technical data are complete, detailed and accurate. The quality of the project meets the requirements of national specifications and relevant technical standards, and it has the conditions for completion acceptance.

Three. Self-inspection of project quality: According to the requirements of the specification, this project is divided into eight sub-projects such as foundation and foundation, main structure, decoration, roof, water supply and drainage and heating, building electricity, elevator and building energy conservation. The quality evaluation of each component project is qualified, and the quality evaluation of this unit project is qualified. 30 quality control data were checked, and 30 items met the requirements. There are 23 safety and main function verification and spot check results, 23 of which meet the requirements, 6 of which meet the requirements.

Build projects, build monuments, and make friends. On behalf of the construction unit, I would like to congratulate the construction unit on the completion of this project, and express my heartfelt thanks to the quality supervision, construction, design, supervision, survey and other units that gave us strong support during the construction process!

Thank you!

Speech on the completion acceptance of the construction unit 5. Leaders and representatives of all participating units:

First of all, thank you for taking time out of your busy schedule to participate in the completion acceptance of the "Thousand Bay Peninsula" built by our company. On behalf of the construction unit, Sichuan You Zhu Construction Engineering Co., Ltd., I briefly introduce the construction of this project:

I. Overview of the Project:

This project was developed and constructed by Sichuan Yongxing Real Estate Development Co., Ltd., surveyed by China Southwest Architectural Design Institute and Chengdu Survey and Design Institute, supervised by Lang Kun Construction Engineering Supervision Co., Ltd. and contracted by Xingmin Construction Engineering Co., Ltd.

The buildings mainly completed are: 2nd floor, 3rd floor, 5th floor,16th floor, 22nd floor, underground phase I, 6th floor,17th floor, 20th floor (sales department) and 25th floor (gate) phase II.

The second and third floors underground 1 floor, overground 18 floor, shear wall structure, construction area10559.17m2; There are basements on the fifth floor above ground, 30 floors above ground, shear wall structure, with a construction area of 39,633.51㎡, basements on the sixth floor above ground, 33 floors above ground, shear wall structure, with a construction area of 43 198.30㎡ and 22 floors above ground, with a frame structure and a construction area of 89/kloc-0.

Phase II: 1 building, basement 1, overground 18, shear wall structure, construction area 15850.06m2, basement 6, overground 32, shear wall structure, construction area 2 1876.69m2, basement 1/kloc. The 20th floor (sales department) has a basement and three floors above ground, with frame structure, with a construction area of 6304438+07m 2, and the 25th floor (gate) has a ground floor, with frame structure and a construction area of 88.82m2. ..

This project started on February 6th, 20xx 65438+. At present, the project has completed the work content agreed in the design documents and the construction contract, and the sub-projects have passed the quality acceptance, and the project quality control information is complete and detailed. Safety and functional test data are complete. The construction process and content shall be carried out in strict accordance with the construction drawings, design changes, design disclosure and blue prints.the design determined by the design unit. The quality of the project meets the requirements of national acceptance specifications and relevant technical standards, and the conditions for completion acceptance have been met.

Second, the detection of raw materials and entities:

Various raw materials and components used in the project, such as steel bars, commercial concrete, mortar, bricks, waterproof coiled materials, doors and windows, polystyrene insulation boards, etc. , has been strictly in accordance with the principle of inspection before use, through sampling inspection and re-inspection. The factory quality guarantee of raw materials is complete, and the results of witness sampling re-inspection report meet the design and specification requirements.

The raw materials of the foundation, main reinforcement and connecting joint specimens of this project meet the design and specification requirements, the concrete strength report of the sampled specimens is qualified, and the results of entity detection and rebar planting detection meet the design and specification requirements.

The pull-out test of exterior wall decorative joints meets the design requirements.

Energy-saving sub-project: flame retardant polystyrene insulation board is used for external wall insulation, foam concrete is used for roof insulation, and hollow double glass is used for plastic steel doors and windows. The sampling tests all meet the requirements of energy-saving design.

Roof, water supply and drainage, electrical and other branch pipes shall be constructed according to the design and specification requirements, and water storage tests shall be conducted on the roof and waterproof parts, without leakage or water accumulation.

Third, the construction technical data:

All the sampling items of each division and sub-item are qualified, and the sampling inspection lot is complete in information and signature, and the evaluation is qualified. The engineering technical data is complete, and the content is detailed and accurate. The quality of the project meets the requirements of national acceptance specifications, design requirements and relevant technical standards, and has met the conditions for completion acceptance.

Four. Quality and safety acceptance at each stage:

1, mass:

This project has passed the acceptance of various sub-projects, and the project department has rectified the problems raised in the pre-acceptance of project completion.

2. Security:

No safety accidents occurred in this project from commencement to completion.

Verb (abbreviation of verb) self-evaluation opinion:

Based on the above situation, our project department has passed the self-evaluation of "Thousand Bay Peninsula" project and applied for acceptance. Please give your valuable advice.

Six, engineering warranty:

The project completion date is also the beginning of the project quality warranty period. In order to safeguard the legitimate rights and interests of the owner, our company will ensure the quality and level of the warranty service of this project based on the principle of being responsible to users, and do our best to do a good job in the warranty of project quality.

Here, on behalf of the construction unit, I congratulate the construction unit on the completion of this project, and express my heartfelt thanks to the quality supervision, construction, design, supervision, survey and other units that have given us great support and help in the construction process.

Thank you all

The construction unit completion acceptance speech 6 Dear leaders:

Hello everyone!

First of all, I am very grateful to the leaders and experts from all units for coming to attend the preparatory meeting for the completion and acceptance of the office building project of Shangye Machinery Factory in Beibei District undertaken by our company. On behalf of the construction unit, I will briefly introduce the construction of this project:

1. The project started on May 6th, 20xx, and all the contents stipulated in the design drawings and construction contract have been completed. All construction contents are carried out in strict accordance with the construction drawings, design changes, design disclosure and the blue prints.the design signed by the design unit.

Second, the detection of raw materials and entities:

All kinds of raw materials and components used in this project, such as cement, sand and gravel, steel bars, commercial concrete, sintered bricks, inorganic thermal insulation mortar, etc., are sent for inspection and sampled in strict accordance with the principle of inspection before use. The factory warranty of raw materials is complete, and the results of witness sampling inspection report meet the design requirements.

The foundation of this project is manual digging pile foundation, and the structural integrity of pile body measured by pile dynamic test meets the design requirements. The measured estimated concrete strength and rebar spacing meet the design requirements.

The main body is a frame structure. Mechanical connection, binding and welding lap are adopted for steel bar connection, and the detection of joint specimens meets the design and specification requirements; The concrete strength report of the sampled specimens is rated as qualified, and the results of main entity detection and rebar planting detection meet the design requirements. The pull-out test of exterior wall decorative joints meets the design requirements. All tests and evaluations are qualified.

The energy-saving sub-item of the external wall of the energy-saving division is 35mm thick inorganic thermal insulation mortar for external insulation; Roof energy-saving components for 200MM foam concrete; Exterior doors and windows adopt broken bridge aluminum alloy 6+9A+6 insulating glass to save energy. The "four characteristics" test of glass curtain wall 6+9A+6 insulating glass, door and window glass and the sampling report of external wall energy-saving structure by core drilling method are complete, and the results meet the requirements of energy-saving design.

Decoration, roof, water supply and drainage, electrical and other branch pipes shall be constructed according to the design and specification requirements, and there shall be no leakage or water accumulation in the roof water storage test;

Third, the construction technical data:

All the sampling items of each division and sub-item are qualified, and the sampling inspection lot has complete information and complete signature, and the evaluation is qualified. Engineering and technical data are complete, detailed and accurate. The quality of the project meets the requirements of national specifications and relevant technical standards, and it has the conditions for completion acceptance.

Four. Quality and safety acceptance at each stage:

1, mass:

This project has passed the acceptance of each division and sub-project, and all the acceptance opinions are qualified.

2. Security:

This project has completed the safety verification at all stages, and the conclusion is qualified. From the start of the project to its completion, no safety accidents occurred.

Verb (abbreviation of verb) self-evaluation opinion:

Based on the above situation, our project has passed the self-evaluation of the office building project of Shangye Machinery Factory in Beibei District, Chongqing. Please give your valuable advice.

Six, engineering warranty:

The project completion date is also the beginning of the project quality warranty period. In order to safeguard the legitimate rights and interests of the owner, our company will ensure the quality and level of the warranty service of this project based on the principle of being responsible to users, and do our best to do a good job in the warranty of project quality.

Here, on behalf of the company, I would like to express my heartfelt thanks to all departments and contractors who have given us great support and help in the construction process.

Speech on completion acceptance of the construction unit 7 Dear leaders:

Thank you for coming to participate in the energy-saving pre-acceptance of the self-use office building project of Shangye Machinery Factory in Beibei District of Chongqing. In May of 20xx, the project completed all construction procedures and started construction. During the construction, all parties have fulfilled the contract well.

We organized the blue prints.the design when the project started, and approved and issued the engineering changes and negotiations proposed by the construction unit during the construction period. Quality management: Quality management is based on the principle of "quality first". In terms of safety work, we should conscientiously study the laws, regulations and rules on safety production issued by government departments at all levels, and implement the responsibility system for safety production and safety supervision and management. In terms of construction funds, our unit raises funds through various channels to ensure that the project funds are in place.

We insist on strengthening the comprehensive supervision and management of construction units. Friendly neighborhood, harmonious public security. Here, on behalf of the construction unit, I would like to congratulate the construction unit on its safety and smoothness in the whole project construction, meeting the design requirements and completion acceptance specifications. We would like to express our heartfelt thanks to the quality supervision, design, geological exploration, supervision, construction and other units that have given us great support during the construction process! Everyone has worked hard! Thank you!

The construction unit completion acceptance speech 8, leaders and representatives of the participating units:

First of all, thank you for your busy schedule to participate in the completion acceptance of the first bid section of the water features project from Pingliang Kongtong Reservoir to Baliqiao Jinghe River. Now, on behalf of the construction unit Jingning County Water Conservancy Engineering Company, I would like to briefly introduce the project situation.

I. Overview of the Project:

In this project, five water retaining weirs with a weir height of 0.8m, 1 falling water and nine shallow ponds are set in combination with natural topography and slope, forming a water surface area of 261.340m2 (392mu). Combined with plants suitable for regional climate, three aquatic plants, Phragmites australis, Welsh onion, were selected to carry out river ecological greening to form an ecological wetland area.

422 130 m2 (633 mu), of which: 404,500 m2 (607 mu) by the river; Hexinzhou17630m2 (26mu); Around the landscape environment, rich river landscape will be built in the form of river center and ecological green space, and appropriate beaches will be reserved for birds to inhabit, with a total area of 4,830 square meters (7.3 mu), including: 2 150 square meters (3.2 mu) by the river; Hexinzhou is 2680 square meters (4. 1 mu). The project started on June, 20xx 15, and was listed as the key project of our company. In the process of construction, our company adheres to the policy of "safety first, quality first", and together with the construction and supervision units, strictly controls the entrance of materials to ensure the quality of materials, operates in strict accordance with the requirements of design documents and construction specifications, and determines the solutions to various problems encountered in construction in time; Problems found in the process of self-examination are also corrected and improved in time.

Second, the time limit for a project:

The project passed the acceptance of the basic division on September 19, 20xx14, and was basically completed on March 10, 20xx. Through the unremitting efforts of all parties, the design documents and construction contents agreed in the contract have been completed, and the engineering technical data are complete, detailed and accurate. The quality of the project meets the requirements of national specifications and relevant technical standards, and it has the conditions for completion acceptance.

Third, the project quality self-inspection:

According to the specification requirements, this project is divided into eight subprojects: foundation and foundation, main structure, decoration, roof, water supply and drainage, heating, building electricity, elevator and building energy conservation. The quality evaluation of each component project is qualified, and the quality evaluation of this unit project is qualified. 30 quality control data were checked, and 30 items met the requirements. There are 23 safety and main function verification and spot check results, 23 of which meet the requirements, 6 of which meet the requirements.

Build projects, build monuments, and make friends. On behalf of the construction unit, I would like to congratulate the construction unit on the completion of this project, and express my heartfelt thanks to the quality supervision, construction, design, supervision, survey and other units that gave us strong support during the construction process!

Thank you!

;