Current location - Health Preservation Learning Network - Health preserving recipes - Concrete curing film, under what circumstances should be covered and under what circumstances should not be covered.
Concrete curing film, under what circumstances should be covered and under what circumstances should not be covered.
Summer maintenance needs film mulching. ..

In addition, the film should be watered for curing,

First, because the external temperature and internal temperature of concrete can't be too different,

Otherwise, temperature stress, internal expansion, external contraction and cracks will occur.

Second, the hydration heat of cement only needs 20% of the actual water consumption, and the rest will evaporate.

When water is completely evaporated, it will shrink and crack.