As a young project manager, I cherish the on-site internship very much, and I am familiar with the bidding, bidding, bid opening, bid winning, contract drafting, contract signing, construction preparation, construction progress, quality and safety, completion data sorting and other links of the construction unit, which broadens my horizons and increases my knowledge. With the correct leadership of the leaders and the help and support of colleagues, we have made certain achievements. The work of these months' probation period is summarized as follows:
First, measures to grasp the nature of the project
The project aims to create unique products. A temporary effort to serve or result. To this end, at the beginning of the project, my key work is to be familiar with the bidding documents, drawings, site conditions, staffing of the project department and the business contract signed with the owner. But the characteristics of each project are different. The most important thing is to grasp the characteristics of this project and let the main line run through the work. Baowu Highway is characterized by long front, tight construction period and high quality requirements. In control, it is necessary to cross-operate and flow construction to save some non-critical expenses.
Second, the project plan control
Project planning control is divided into time planning and cost planning. Time planning is to find out the node project according to the overall engineering quantity and determine the node construction period, so that the result can be successfully completed. Cost planning involves all aspects of quantity and machine management, and reasonable arrangement of labor, machinery and project department management personnel.
Three. Implement the company's management rules and regulations and industry standards.
As a project manager, understanding execution plays an important role in team management. Therefore, I require that every action of the project department should strictly implement the company's management system and industry norms. No matter in labor employment, machinery leasing, material procurement, etc. , must be carried out within the framework of the company system. Engineering quality standards should be built within the standard values. From a macro point of view, the national unified quality standard should be the lowest standard in the industry, and we must achieve 100%. However, in actual construction, due to various reasons, some problems still exist, especially the curing and grading of lime-fly ash macadam are not in place. The lessons brought are enough to make us pay more attention to the significance of quality to the survival of enterprises.
Fourth, the overall control of project strain
The overall control of the project should meet the practical problems that the city project manager should consider every day. To do a project, I have to deal with the Construction Committee, quality inspection station, design, supervision, survey, inspection station, subcontractors, company engineering department, operation department and finance department. Every link and detail may determine the success or failure of the project. Therefore, I consider, balance and deal with the requirements of all parties every day, especially whether the external parties can coordinate and communicate in time. Under the premise of maximizing the interests of the company, it is most important to obtain satisfactory results. Through the demonstration of honesty, credibility, quality and quantity, it won market recognition and gained benefits. However, a person's managers are limited after all, and when dealing with external relations, they ignore the communication of internal relations, resulting in certain misunderstandings. I will also try to correct these shortcomings.
Summary of the project manager's job confirmation Dear leaders at all levels of the company: Hello!
First of all, thank you for giving me the opportunity to work, grow and study in xx Property Management Company. During my one-month probation period, my main job is to be familiar with the environment, personnel and institutional processes. Through learning, I am familiar with the whole operation process of the company's projects. At work, I have always been strict with myself, earnestly and timely doing every task assigned by the leaders, and at the same time actively sharing worries for the leaders and giving good ideas; Ask colleagues modestly for questions you don't understand about the project, and constantly improve and enrich yourself. I hope I can integrate into my work as soon as possible and make greater contributions to the company. With the help of company leaders, all employees have been working for 1 month, and the work report during this period is as follows:
A, fully familiar with the company, project personnel environment, system process, feel the company's corporate culture.
When I joined the company, all employees in the company, under the leadership of the boss, were full of enthusiasm and enterprising, showing a vigorous corporate atmosphere. Encouraged by this good corporate culture, I quickly put myself into my work.
Second, correct mistakes and put forward reasonable suggestions:
Due to various reasons in the early stage, the work of the property management service center lags behind, especially in engineering maintenance. Through efforts to deal with them one by one, fully investigate and study, and scientifically and reasonably implement various matters explained by company leaders; Reasonably combine the property management characteristics of farmers' resettlement houses; On the premise of referring to the operating rules of the same industry, the property management of this project has been adjusted.
Three, standardize the management system, improve the project execution ability:
After taking over the xx project, talk with employees one by one to enhance understanding, and use regular meetings and temporary meetings for training, including national, provincial and municipal standards such as property management regulations, decoration, building quality standards and quality warranty period. Find problems and hidden dangers in the work, explain and learn to eliminate them in time, and improve and establish some rules and regulations on the basis of making good use of the original system:
1. Decoration inspection system;
2. The weekly service implementation system of the Security Department;
3. Distribution scheme of cleaning service workflow;
After preliminary standardization and adjustment, every employee truly takes responsibility to people and rewards and punishments to people; Conduct regular training and assessment to effectively improve the professional service knowledge and skills of employees. At present, the service consciousness and customer service ability of the project staff have made great progress. After more than a month's work, although some achievements have been made, there are still some shortcomings. For example, the maintenance of other projects cannot be completely solved in time, and we are trying to solve them one by one. I believe that under the leadership of General Manager Ye and the support of company leaders, the work of Guilin Cuidao Property Service Center will definitely make greater progress.