Before construction, the site should be treated with "three links and one leveling". If temporary access roads are to be built, the safety of traffic and pedestrians must be ensured. And there are clear signs and traffic control measures. Understand the temporary water and electricity consumption on the construction site through investigation and draw a sketch. Carry out safety education on water and electricity use for all construction personnel, and strictly abide by the system of holding certificates for special personnel.
Roadbed construction safety?
Before subgrade construction, strict construction organization design, strict construction specifications and safety technical operation procedures should be formulated, on-site command and dispatch personnel should be implemented, safety technical disclosure should be made to all construction personnel, and safety protection facilities should be set up at the construction site to provide necessary safety protection articles for construction personnel. Everything is ready before subgrade construction can begin.
Is the base and surface construction safe?
During concrete construction at the grass-roots level, attention should be paid to preventing environmental pollution and affecting residents' physical and mental health, and fences should be set up when necessary. No one is allowed to stand around the machine. In order to ensure that the machine can move forward and backward freely, there must be a special person at the scene to prevent personal injury. During paving construction, construction personnel should pay attention to avoid construction machinery in time and obey the on-site command. After the construction, the site must be cleaned up, and the remaining materials must not be dumped on the roadside, which will affect the safety of pedestrians.
Construction safety of ancillary structures?
Precast masonry construction: When transporting precast blocks, first check whether there are cracks in the precast blocks to prevent sudden fracture and personal injury during handling. When handling, two people should carry each other and pile up neatly and smoothly. In the process of handling, the two coordinated to prevent squeezing hands and feet. When installing, please hold it firmly and move it carefully. After the erection is completed, pedestrians and vehicles are prohibited from colliding during the maintenance period. When building a well: Workers must wear safety helmets correctly. Bricks and stones are transported down through chutes or lifts. When lifting, the rope must be strong and fastened, and the upper and lower workers should cooperate with each other. When the build-by-laying well exceeds 1.2m, scaffolding or simple shelves must be erected. When laying, bricks, stones and tools should be prevented from falling and hurting people.