how much is the room? That is, how long is the span? It should be less than six meters. Look at the temperature. More than ten degrees, half a month is enough.
2. How to maintain concrete?
The simplest, surrounded by red soil, water is 2 cm deep. Or spread sacks with water twice a day. One week is enough.