When everyone is doing interior decoration, some owners will level the ground with cement; Or some owners want to decorate the house into an industrial style, and will make the ground into a cement floor. After the cement floor is poured, it needs to be watered and maintained. How many days does it usually take to water the cement floor? Next, Bian Xiao will briefly introduce it to you.
1. According to Qijia experts. Com, generally, cement needs to be watered for more than 7 days after solidification, and more water is needed on the first day. The specific curing time should be determined according to the increase of its compressive strength. Under normal circumstances, the sprinkler maintenance time in high temperature weather should not be less than 14 days. The watering and curing time in low humidity weather shall not be less than 265,438+0 days, of which the first 7 days are the most important.
2. According to different seasons, the frequency of water conservation will be different. For example, in hot summer, water should be poured every 4-6 hours; In other seasons, just water once every 12-24 hours. We water and hydrate the cement floor, which can make the concrete components closely combined after reaction; It can also play the role of heat dissipation and avoid cracks in concrete due to excessive temperature.
3. Cement floors are usually covered or sprayed. We should start covering and curing after the initial setting of the cement floor. The covering can be made of materials with good water absorption, such as wheat straw and woven cloth. After the ground is finalized, we can water and protect the roots for maintenance. It is forbidden to walk on the cement floor before the concrete strength reaches C 12. In addition, the cement floor also needs to pay attention to the later maintenance, such as avoiding frequent boiling water or chemical solvent impregnation of the surface; Do not use acidic cleaner for cleaning.
Bian Xiao concluded: About the maintenance and watering of the cement floor for a few days, Bian Xiao will simply introduce you here. I hope that after reading this article, everyone can understand this. Everyone should pay attention to water conservation when making cement floors indoors, and the maintenance time is generally about 2-3 weeks.