Minutes of Fan Supervision Regular Meeting
Name of the meeting: supervision meeting
Meeting time: _ _ _ _ _ _ _ _
Venue: Meeting Room of the Task Force of the Ministry of Public Security
Participant: Employer:
Supervision unit:) Personnel of corresponding units.
Construction unit: Moderator:
Meeting contents:
A, the implementation of the resolution of the last meeting (the supervision unit requires the participants to complete the implementation of the minutes of the last meeting and record it).
Second, the construction unit (summary of last week's project, this week's project plan, all need to describe the safety, quality, progress and coordination issues, etc. These contents must be introduced by the supervision unit in the meeting, which requires the project manager of the construction unit to attend and introduce).
Three. Supervision unit (the engineer of the supervision unit summarizes the engineering situation last week, puts forward supervision requirements for the safety, quality, progress and coordination of the project, and finally the director summarizes and introduces it).
Four, the construction unit (by the responsible engineer (including project director) reply construction coordination questions, opinions and requirements).
Five, the meeting resolution (by the chief supervision engineer to summarize the above problems and form a resolution).
Minutes of Fan Supervision Regular Meeting
Time: 20th morning 10: 00.
Location: _ Office of Project Department on Construction Site
Meeting theme: check the implementation of last week's regular meeting and the work arrangement for next week.
Moderator: Wang _
Meeting contents:
Construction unit:
BidNo. 1: According to last week's plan, the numbering of each building has not been completed. The main reason is that the tower cranes in 1#, 2# and 8# buildings have not risen to a certain height above the construction surface; The construction workers in Building 9 didn't go to work in time. It should be emphasized that there is no plumber on duty when the supervisor checks the steel bars; The plumber was not present when installing the precast slab, which caused the precast slab to crush the conduit and the plumber's work was not done well.
Bid 2: Last week, the plan was delayed for three days. Mainly due to the influence of natural factors. 16# building and 18# building can catch up with the plan except natural factors. On the one hand, the progress of 17# building is slow, on the other hand, the carpenter is not sure. Generally speaking, there is a shortage of construction personnel and technical management needs to be improved.
Bid 3: Buildings 23#, 24# and 25# were shut down for three days due to weather. If the weather is normal, the plan can be completed.
Supervision unit:
First, security.
1: In any case, the project department must give priority to safety work, and the safety section chief should intensify inspection. If any potential safety hazard is found, it should be stopped immediately, and fine measures should be taken if necessary.
2. There is no photo attached to the reply form of the safety rectification notice of the quality inspection station, and the supervisor will not sign it.
3. The fire safety work at the construction site is not in place, and there are only fire-fighting facilities next to the water tank in the North District, which are crude and do not meet the fire-fighting requirements.
4. The outer frame has not risen to a certain height of the working face, and some buildings have not yet set up safe passages.
5. The electricity consumption on the construction site is not in conformity with the specifications, and the wiring layout is messy, which has potential safety hazards.
6: 00 at 3: 00 pm, the supervisor and relevant personnel of the project department will conduct safety inspection on all building numbers, mainly including the erection of an outer frame, elevator construction, on-site electricity utilization, safe passage, etc.
Second, the quality.
1: 1 #, 16# Before laying a layer of aerated block, you must do the drawing experiment of anchor and tie bar first, and then you can build it after the experiment is qualified.
2. The construction unit and the laboratory jointly determine the rebound position of the laboratory to the concrete before painting.
3: 16 # building stair rest platform was damaged due to irresponsible formwork support of technicians and constructors, resulting in a large amount of concrete falling into the lower rest platform.
4: 16 # building, 17# building, the joint of the three-story precast slab is not reinforced, and the concrete in the joint of the slab has reached the final setting state and is not reinforced. The project department should immediately organize personnel to carry out rectification.
5: 16 # building's four-story west middle unit and 17# building's three-story east unit were poured concrete without inspection, which seriously violated the construction procedure. The supervision department will punish your unit according to relevant regulations.
6. When winter comes, attention should be paid to heat preservation and protection during construction, especially the cement mortar needed for internal powder should be stirred with warm water. Pay attention to the insulation of the wall after painting to avoid cracks on the wall.
7. Technicians should strictly follow the plaster mixture ratio, and plaster must be used up on the same day, and cannot be used again the next day.
Third, progress.
1: The weekly plan has repeatedly failed, and only 18# building can be capped within 65438+February 3/. The project department should take effective measures to arrange the construction progress reasonably.
2. None of the six buildings in North District can be completed according to the construction plan, which seriously affects the overall construction progress.
3. The winter construction project department should pay attention to appease the construction personnel, understand the needs of workers in time, and solve the difficulties encountered by workers. Let the workers devote themselves to the construction without affecting the construction progress.
Minutes of Supervision Regular Meeting Fan Wensan
Meeting time: 20 13, Tuesday, February 5th, 9:00 am, the second supervision meeting place: the conference room of the on-site project department.
Moderator: Tan Zhu
Minutes of meeting: Jiang Ruoqiong
Participants: (See the meeting sign-in form for details)
Theme of the meeting: On-site Spring Festival arrangements.
The main contents of the meeting minutes are as follows
I. The construction unit makes the following statement:
1: Strengthen safety education and training to improve employees' safety awareness.
2. The construction drawing is incomplete. I hope that the construction unit will supplement and improve the drawings as soon as possible.
3. In the construction team, each team leader needs to lead the construction personnel to do a good job in quality and safety.
II. The statement of the construction unit is as follows:
1: The construction unit needs to design and construct according to the drawings. If it encounters work difficulties, it needs to find the supervision department and the construction department to coordinate the construction.
2. According to the requirements of the construction period and the current actual situation, the construction period cannot be guaranteed.
It is required to increase construction personnel in time, especially the shortage of formwork workers, which seriously affects the construction progress.
3. Each team of the construction unit is required to cooperate with each other, carry out the construction in strict accordance with the design drawings, and designate professional and technical personnel for on-site operation.
Three, supervision unit statement is as follows:
1: It is required that the dangerous parts of the construction site must be hung with eye-catching safety warning signs as required, and safety helmets must be worn when entering the construction site.
2. During the period of construction, there must be a special person who is responsible for the temporary electricity consumption, and the layout of power lines on site is not standardized. Weeds and garbage near voltage devices and distribution boxes should be cleaned up in time. It is forbidden to pile up building materials near voltage devices and distribution boxes.
3. Seriously carry out the investigation of potential safety hazards and actively prevent all kinds of production safety accidents.
4. After the Spring Festival, the safety management personnel of the project department should quickly enter the normal working state, and the safety production management personnel should always adhere to the policy of "safety production, prevention first, comprehensive treatment", and it is too late to regret after the accident. Before returning to work, the relevant units responsible for production safety at the construction site should carefully conduct a comprehensive safety hazard investigation on the key parts of the accident site, major hazard sources and key links prone to construction accidents: check the perimeter of the construction site.
Whether there are potential safety hazards in the walls, migrant workers' dormitories and board houses, and whether the fire fighting equipment and facilities meet the specified requirements; Electricity for temporary construction, whether the line erection meets the requirements, whether the line is aging, whether the leakage protector fails, and whether the distribution box and switch box meet the requirements of electricity consumption specifications; Whether all kinds of mechanical limit safety devices work in spite of illness; Whether the scaffold and formwork support system are constructed in strict accordance with the scheme; Whether there is a security hole in the wall around the hole and the edge, or
Deficiencies. Ensure that all safety protection measures are put in place before the start of construction after the holiday, leaving no dead ends. The project department and all subcontractors shall register the hidden dangers one by one, arrange enough funds, formulate rectification measures, and assign special personnel to be responsible for rectification. After rectification, it should be reported to the supervision unit for review, and it can only be started after it is qualified. Only by actively taking effective preventive measures in advance can we nip safety accidents in the bud and ensure that construction safety production has a good start in the new year.
5. Make the patrol situation during the festival, arrange personnel to carry out various safety inspections on the construction site, and make safety inspection records.
6. Be sure to cut off all temporary electricity consumption on the site before the festival to avoid hidden dangers.
Anhui hengxin construction supervisory co., ltd
February 5, 2065 438+03
Description:
Meeting minutes in triplicate, one for the construction unit, one for the supervision unit and one for the contractor.
Minutes of supervision regular meeting; Related articles;
★ Model essay on minutes of supervision regular meeting
★ Model essay on minutes of supervision regular meeting
★ There are 6 model essays on the minutes of the project supervision meeting.
★ There are 6 model articles in the format of regular meeting minutes.
★ Model essay on minutes of supervision safety meeting
★ There are 6 model essays on the minutes of the weekly meeting.
★ There are 3 sample essays on minutes of supervision regular meeting.
★ Model essay on minutes of supervision internal meeting
★ There are 3 sample essays on the minutes of supervision special meeting.
★ There are 3 sample essays on the minutes of the meeting of the supervision company.