Points for attention in pile cap construction and concrete pouring
Points for attention in pile cap construction and concrete pouring:

1, before concrete pouring, sundries in the formwork and oil stains on steel bars shall be removed; When there are cracks and holes in the template, they should be blocked and not leak slurry. Carefully check the fastening degree of steel bars, templates, supports and embedded parts, and the position and quantity of protective layer pads.

2, steel lofting, after the acceptance of the model, pouring concrete. Control the mixing quality of concrete. During the pouring process, pouring shall be done layer by layer every 30cm, and the concrete pouring of the bearing platform shall be completed at one time. The first layer of concrete shall be poured from the middle to the periphery, and the second layer shall be poured from the periphery to the middle. In the process of each layer of concrete pouring, with the pouring of concrete, the internal vibrator is used to vibrate and compact in time. In order to prevent surface cracks caused by excessive temperature difference between inside and outside of concrete during hydration and condensation, slurry should be collected in time and cured immediately after concrete pouring.

3. In the process of concrete pouring, the concrete shall be vibrated at any time to make it uniform and dense. The vibrating mode should be vertical vibrating with an internal vibrator, the moving distance should not be greater than 1.5 times the radius of action, and the depth of inserting the lower concrete should be 50 ~100 mm. The vibrator should avoid colliding with the steel bar and the formwork, and should not vibrate directly or indirectly through the steel bar, and should keep 50 ~ 65438+ with the side formwork. Moisture secreted by concrete during pouring and vibrating shall be removed in time. After pouring is completed, the exposed surface of concrete should be trimmed and smooth in time.